• Title/Summary/Keyword: construction model

Search Result 8,706, Processing Time 0.036 seconds

A Study on the Investigation of Application in Construction Field of Strength Prediction Model using Maturity Method (적산온도를 활용한 강도예측모델의 건설생산현장 적용성 검토에 관한 연구)

  • 주지현;장종호;김재환;길배수;남재현;김무한
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.101-104
    • /
    • 2004
  • If predicting of compressive strength of construction in construction field at early age is possibile, rational strength management & schedule plan is possible. With method for predicting strength of concrete, many researchers have been making study of maturity method. On the other hand, nowadays rationalization of construction capacity and reduction of a term of works due to improvement of construction capacity and application of a new method of construction is gathering strength with important issue. In accordance with this present condition, construction is being progressed in winter, but proper construction mothed and countermeasure for strength management is not established in case of winter construction. Therefore to investigate application in construction field at winter of strength prediction model that developed at former study, this study aim to measure application of developed strength prediction model through manufacture of mock-up concrete according to kind of strength level at 5$^{\circ}C$.

  • PDF

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

PERFORMANCE EVALUATION FOR CONSTRUCTION VALUE ENGINEERING STUDY

  • Wei Tong Chen;Hong-Long Chen;Po-Yi Chang;Tsang-Jung Wang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.347-352
    • /
    • 2005
  • This paper presents an evaluation model for the performance of Value Engineering Study (VES) for construction projects. The proposed model consists of 6 PEGs and 32 PEIs. The expertise of the proposed model was collected from VE experts in Taiwan using two-phase questionnaire survey. One real-life VES of construction projects was used to demonstrate how the proposed model works. The proposed model not only can be used by project owners to appraise the performance of VES team but also be used by the VES teams to conduct self-diagnosis, improvement, and motivation for achieving better performance. Additionally, the proposed model is capable of: (1) clarifying the defects of VES and avoiding committing same mistakes, (2) assisting inexperience team members to implement VES and catch the critical issues of a VES.

  • PDF

Development of Artificial Neural Network Model for Predicting Carbon Dioxide Emissions by Construction Equipment (인공신경망 모델 구축을 통한 건설장비별 이산화탄소 배출량 예측)

  • Im, Somin;Ro, Sangwoo;Kim, Hayoon;Lee, Minwoo;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.16-17
    • /
    • 2020
  • In this paper, we intended to present a model for estimating carbon dioxide emissions by work of construction equipment using Artificial Neural Network(ANN) analysis. In this study, data of excavators and trucks are classified according to the work carried out, and carbon dioxide emissions are predicted through ANN based on equipment information and work information. As a result, the effect of each model was validated, and a carbon dioxide emission prediction model was derived for each work. This has the expected effect of establishig an eco-friendly process plan using this model from the construction planning stage.

  • PDF

Effectiveness of a Business Model for Adopting a Construction Machine Guidance System (건설장비 가이던스 시스템 도입을 위한 비즈니스 모델 효과)

  • Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.24-32
    • /
    • 2018
  • A construction machine guidance system is an assistance system that helps construction equipment operators dig grounds during excavation work at a construction site. This system has long been applied in the overseas countries of the United States, Japan and Europe. However, the system has not been paid much attention in Korea. The objective of this paper is to present a business model for adopting construction machine guidance systems in Korea and evaluate the effectiveness of applying the system to excavation work. The business model in this study shows a new process of applying construction machine guidance system, business stakeholders and revenues, and suggests the benefits to the business stakeholders. A field test of the construction machine guidance system proves that the system can be applied as a tool that can improve the productivity of excavation work. This productivity improvement consequently demonstrates that the business model in this study is a prospective challenge in improving the effectiveness of excavation work at the construction site.

A Study on Association Rule and Cost Efficiency Analysis Model Using Construction Supervision Reports (건축공사감리 문서 기반 연관규칙 및 비용효율성 분석 모델)

  • Song, Tae-Geun;Yoo, Wi Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.389-390
    • /
    • 2023
  • To improve the cost performance of construction sites, various systems and standards are constantly being developed and implemented. Although legal requirements for these system and standard improvements have been increasing, the cost efficiency performance of construction sites remains stagnant. We have digitized documents generated through construction supervision work at 39 building construction sites and proposed a model that can support decision-making in cost efficiency evaluation. This model selects key keywords that are considered to be highly related to cost efficiency by identifying the patterns and relationships of keywords through associated rule analysis and social network analysis using keywords derived from documents. In addition, it is expected to be used as a decision-making aid to determine the cost efficiency of a specific building construction site by establishing a logistic regression model using core keywords. As a systematic database of construction supervision documents and an integrated system of massive data generated by digital technology are established in the future, the accuracy and reliability of the cost efficiency evaluation model are expected to be reinforced.

  • PDF

Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant (원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

Information Flow During Individual Model Construction and Group Model Construction Type in the Sound Propagation Model Co-Construction Class (소리의 전달 모형구성 수업에서 나타난 개인모형 구성 단계 중 정보의 흐름과 모둠모형 구성의 유형)

  • Park, Jeongwoo;Yoo, Junehee
    • Journal of The Korean Association For Science Education
    • /
    • v.38 no.3
    • /
    • pp.393-405
    • /
    • 2018
  • In this study, we classified the group model construction types in the actual classroom situation implementing the instructional strategy mixed with individual model construction and group model construction types. The purpose of this study is to analyze the information flow and the individual construction types of each group model construction type to obtain implications for model co-construction in a real classroom environment. A two-session class on sound propagation was carried out for thirty-three 8th grade students in Seoul. A total of 65 individual model construction and 16 group model construction processes were collected and analyzed. The group model construction types were classified as unchanged, enumerated, and elaborated. The unchanged type was found in 8 groups, the enumerated type in 3 groups, and the elaborated type in 5 groups. The isolated individual and independent construction (i.I) were found mostly in the unchanged group construction type (50.0%) and enumerated group construction type (54.5%). In the unchanged type, the radial shape of flow in which one student's information is transmitted to all the members of the group appeared. In the enumerated type, the starting point of the information flow was observed from two individuals. In the elaborated type, linear information flow appeared and both the second dissemination and reflective construction (2d.R) contributed to the group model construction (58.3%). This study suggests a viewpoint that enables to understand the process of complex model construction in an actual classroom context rather than in an ideal situation. The result of this study suggests the necessity of a modeling strategy considering the characteristics of Korean small group culture. It is expected that the discussion will progress through further studies.

Cost Estimating Method of Public Building Construction through Construction Scale (공사규모에 따른 공공건축물 공사비의 산정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.307-316
    • /
    • 2015
  • As there are a lot of differences in the public building construction cost depending on the construction scale of actual construction cost system, a lot of problems occur in the estimation of the cost. So, the development of a predictive model depending on the construction scale shall be used in a way that it is applied to the case selectively and differently. This study drew a cost estimating model through a regression analysis. For this, 42 construction sites which were ordered during 2011 to 2012 by Public Procurement Service data were selected as a historical data. Based on the application of the model to new construction and the verification of its effect, the reasonable model for estimating the construction cost has been suggested.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF