• Title/Summary/Keyword: construction methods

Search Result 5,945, Processing Time 0.037 seconds

Analysis of the Amount of Construction and Demolition Waste Generated by Underground Vertical Extension Methods (지하수직증축공법 적용에 따른 건설폐기물 발생량 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.273-274
    • /
    • 2021
  • This paper proposes a process to calculate the amount of construction and demolition (C&D) of underground vertical extension methods through considering the characteristics of used construction and demolished materials. The underground vertical extension methods analyzed in this paper were the bottom-up, normal top-down, and top-down methods with multi-post downward (MPD). In order to check the applicability of the proposed process, 24 illustrative examples were generated. The amount of C&D waste of the illustrative examples were calculated and compared. As the results, the top-down method with MPD was the most efficient method to reduce the amount of C&D waste.

  • PDF

An Experimental Study on the Application of Lib-lath Form (리브라스 거푸집의 적용을 위한 실험적 연구)

  • Nam, Jung-Min;Park, Moo-Young;Lee, Young-Do;Jung, Sang-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.103-108
    • /
    • 2004
  • In order for concrete as a basic material constituting reinforced concrete structure to meet the required performance, it is necessary to satisfy various requirements in concrete construction. Among them, form work has significant effects not only on the process of molding fresh concrete but also on the quality and performance of hardened concrete. Recently, the decrease and aging of form workers is becoming a great problem in the construction industry and, as a result, it is required to rationalize form works and reduce labor costs for employing form workers. Because form construction methods decide the type of form according to required performance, it is necessary to develop various form construction methods and examine their performance. Thus the present study purposed to expand the scope of application of form construction methods and, for this purpose, investigated the basic characteristics of rib- lath form and presented a system form construction method.

The Necessity Analysis of Development Waterproofing Materials and Methods of Construction Technologies for Green Roof (옥상녹화를 위한 방수재료 및 공법개발의 필요성에 관한 분석)

  • 권시원;오미현;강효진;오상근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.107-111
    • /
    • 2003
  • The need for this study must be considerable, as being activate of green roofs research that the organization and construction obtain access to more development technologies. Nevertheless, the green roofs system has begun to apply since 1980's, the green roofs technology was restricted to develop without verification of technologies such as a load or water leakage. There is a limit as urethane waterproofing to almost domestic waterproofing materials and methods of construction for general green roofs. The introduction of materials and methods of construction which are appropriated to property of green roofs could be a decisive factor in a long-range durability and economical maintenance cost, moreover. it support to variety construction system and organization. This present paper describes a necessity of waterproofing and root barrier system is one of the sub-organization based on green roofs construction. which have enormously large impact on the durability.

  • PDF

Application of Construction Management techniques in Small Construction Projects (소규모 프로젝트의 효율적인 공사관리방안)

  • Lee, Sang-Beom;Lee, Dong-Un
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.95-102
    • /
    • 2003
  • A construction project's period is limited by the order manufacture. And a construction project is requested a specific place, and has the characteristic to be irregular. Today, construction is to be representative high-cost and low-efficiency. This kind of problems appears in small construction projects more often than large construction projects. According to this facts, we recognized necessity of making practical application in methods of construction management. Also, we suggest application and establishment of integrated responsibility management department, PMIS(Project Management Information System) and Data Base. From now on, methods of construction management could be good opportunities for small construction projects and local construction companies. Therefore, small and local construction companies should try to improve their abilities. Likewise, the countries systematize to constitute the relation laws.

A Study on the Loss Reduction Method of Reinforcing Bar through Case Study

  • Park, U-Yeol;Jung, Hyeon-Ok;Kang, Tai-Kyung;Cho, Hun-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.123-132
    • /
    • 2010
  • Rebar work accounts for approximately 30% of the total construction costs for rebars and concrete. Recently, the high rising prices of rebars have become one of the principle factors of rising construction costs. Therefore, construction companies are putting much effort into loss reduction of rebars. Consequently, in this study, we wished to present loss reduction methods of rebars before the preparation of the placing drawings. To devise such methods, we collected previous case studies and analyzed methods that were applied for loss reduction. As a result of the analysis, we were able to find the following methods for loss reduction of rebars: method of reducing the number of splices at the mat foundation, method of reducing splice length at the internal columns or walls of the underground parking lot, method of reducing cap-ties of internal beams of basement floors excluding perimeter beams, and method of reducing anchorage length at the internal column or wall of the underground parking lot. Based on those analysis results, we presented our own loss reduction methods of rebars. Applying our methods resulted in considerable loss reduction.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

Diversification of Financial Method for Effective Practice of Construction Projects (건설사업의 효율적 수행을 위한 파이낸싱 다양화 방안)

  • Han Sang-Hun;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.99-108
    • /
    • 2003
  • Recently, the construction companies are forced to cut down the investment amount due to increasing financial problems caused by severe recession and restructuring in the financial market as well as the long-term depression of the construction industry. To overcome this type of problems, a great many efforts have been made. An alternative may be adopting the advanced financing methods. However, during the course of enforcing process of the financing methods, many problems are revealed without any proper solutions being proposed. Therefore, the fundamental problems need to be solved through comprehensive and systematic approach under the changing environment of construction financing. In this paper, as a result of reviewing some financing methods such as ABS, REITS, and Project Financing, multiple business strategies for construction companies to cope with the changing construction market are found in the sense of effectiveness in implementing construction projects. Further, this paper presents diversified financing methods for the effective practice of construction projects through combination of above mentioned methods, and also proposes improvement plans to strengthen the financing function for the construction industry.

A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea (국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구)

  • Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF

A Study on the Selection Method of Construction Management based on Public Construction Projects (공공건설사업의 건설사업관리방식 선정 방법에 관한 연구)

  • Kim, Kwan-Su;Park, Hyung-Keun;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.65-73
    • /
    • 2013
  • Even though the construction management (CM) system was introduced for the purpose of increasing the efficiency of the domestic construction industry along with the establishment of construction industry fundamental laws in December of 1996, now it is very difficult that the public institutions can judge their application of construction management methods due to the lack of clear guidelines or directions to select construction management methods when the public institutions were executing public construction projects. Therefore, this study was executed to prepare for the selection criteria which could be referred in reviewing the application of construction management ordering methods according to public institution's competences and project characteristics. It is expected that future domestic demand of construction management will be gradually increasing both in public and private construction sectors. However under the current construction management systems, it is judged to be difficult that the construction projects that apply the construction management methods will be activated with full-scale. Therefore, it could be said that active efforts in domestic sectors are required in order that the construction management systems of developed countries levels could be activated. Additionally in order to vitalize the construction management systems, it is expected that public institutions could use this study results as the review data for feasibility of construction projects for the consignment of construction management in selecting the ordering methods.

Comparative Analysis of Lifting Loads of Tower Cranes by Core Structure Construction Methods

  • Choi, Yong Seok;Kim, Taehoon;Kim, Sangdae
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.3
    • /
    • pp.301-306
    • /
    • 2020
  • In tall building construction, the appropriate control of lifting loads on tower cranes is critical in terms of the construction duration of structural works. The adoption of efficient construction methods can be the most effective way of minimizing the inputs of tower cranes and making a lifting plan and management easier. Based on actual data from a tall building project, this study comparatively analyzes lifting loads of tower cranes by the core structure preceding construction method (CSPCM) and the core structure succeeding construction method (CSSCM). The results revealed that the CSSCM could reduce up to about 56.3% of lifting loads for core works and significantly enhance lifting efficiency compared with the CSPCM. Consequently, this enabled a substantial reduction in the construction duration of structural works. This study provides a practical reference to assist engineers and managers in applying efficient construction methods and lifting equipment operation in tall building projects.