• 제목/요약/키워드: construction manager-at-risk

검색결과 19건 처리시간 0.024초

건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로- (Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction -)

  • 복훈;김형태;강경식
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

건설현장 안전관리자의 자격기준에 관한 연구 (Improving Qualification of Safety Manager at Construction Site)

  • 갈원모;손기상;정세균;최재남
    • 대한안전경영과학회지
    • /
    • 제11권2호
    • /
    • pp.111-115
    • /
    • 2009
  • As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).

시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구 (Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase)

  • 이주성;문성곤;전영진;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

A Framework for Guaranteed Maximum Price and Contingency Development for Integrated Delivery of Transportation Projects

  • Gransberg, Douglas D.;Shane, Jennifer S.;Ahn, Jun-Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.1-10
    • /
    • 2011
  • This paper discusses the components of a guaranteed maximum price (GMP) and proposes a framework for the development of GMPs as contract payment provisions for construction manager-at-risk (CMR) and design-build (DB) contracts for transportation projects. The framework is the synthesis of a comprehensive literature review, a content analysis of CMR and DB solicitation documents and contracts, and case study project output from twelve projects in nine states worth $3.1 billion. The research also discusses the development of three common types of contingencies that are often utilized in projects with GMPs. The study concludes that owners should specify the structure of the GMP and its components to enhance clarity and understanding of the GMP's composition. It recommends that this structure be included in the CMR and DB solicitation documents so that pricing proposals can be formulated in a manner that is consistent with the contract payment provisions that will be useful to practitioners that need to implement GMP-based contracts.

건설위험직종 작업자의 위험체감도 평가 (Risk Assessment for Hazardous Construction Work Recognized by Workers)

  • 손기상;이신재
    • 한국안전학회지
    • /
    • 제21권3호
    • /
    • pp.67-72
    • /
    • 2006
  • This study is to investigate the related materials such as domestic law regulation, research paper, research report, and the other material, and to suggest suitable counter measures, to find out hazard degree for its works of workers and work place through direct survey, in order to determine risk score of each hazardous work which is designated by the Government, without consideration of labour's consciousness against risk level at a site. Therefore, a new questionnaire survey related to the decision of risk level are made and distributed to find out what risk level each worker recognizes. Also, the authors tried to approach reasonable conclusions after discussing reasonability of qualification standard and improving ideas of worker at hazardous work places with worker, faculty member, H&S manager, labour union. And the results show hazard degrees by each work kind of the above: 3.75 for working with machinery, 3.7 for steel structure, 3.5 for operation of tower crane, 3.51 for retaining wall, 3.85 for form work, 3.46 for scaffolding are obtained. This quantified risk can be applied to establishing a reasonable system to keep safe against hazardous works.

프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로 (Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects)

  • 정설림;김대철
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

Design and Implementation of Road Construction Risk Management System based on LPWA and Bluetooth Beacon

  • Lee, Seung-Soo;Kim, Yun-cheol;Jee, Sung-Hyun
    • 한국컴퓨터정보학회논문지
    • /
    • 제23권12호
    • /
    • pp.145-151
    • /
    • 2018
  • While commercialization of IoT technologies in the safety management sector is being promoted in terms of industrial safety of large indoor businesses, implementing a system for risk management of small outdoor work sites with frequent site movements is not actively implemented. In this paper, we propose an efficient dynamic workload balancing strategy which combined low-power, wide-bandwidth (LPWA) communication and low-power Bluetooth (BLE) communication technologies to support customized risk management alarm systems for each individual (driver/operator/manager). This study was designed to enable long-term low-power collection and transmission of traffic information in outdoor environment, as well as to implement an integrated real-time safety management system that notifies a whole field worker who does not carry a separate smart device in advance. Performance assessments of the system, including risk alerts to drivers and workers via Bluetooth communication, the speed at which critical text messages are received, and the operation of warning/lighting lamps are all well suited to field application.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • 제10권3호
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

이미지 프로세싱을 활용한 개구부 추락 사고예방에 관한 연구 (A Study on Prevention of Construction Opening Fall Accidents Introducing Image Processing)

  • 홍성문;김병춘;권태환;김주형;김재준
    • 한국BIM학회 논문집
    • /
    • 제6권2호
    • /
    • pp.39-46
    • /
    • 2016
  • While institutional matters such as improvement on Basic Guidelines for Construction Safety are greatly concerned to reduce falling accidents at construction sites, there are short of studies on how to practically predict accident signs at construction sites and to preemptively prevent them. As one of existing accident prevention methods, it was attempted to build the early warning system based on standardized accident scenarios to control the situations. However, the investment cost was too high depending on the site situation, and it did not help construction workers directly since it was developed to mainly provide support operational work support to safety managers. In the long run, it would be possible to develop the augmented reality based accident prevention method from the worker perspective by extracting product information from BIM, visually rendering it along with site installation materials term and comparing it with the site situation. However, to make this method effective, the BIM model should be implemented first and the technology that can promptly process site situations should be introduced. Accordingly, it is necessary to identify risk signs through lightweight image processing to promptly respond only with currently available resources. In this study, it was intended to propose the system concept that identified potential risk factors of falling accidents by histogram equalization, which was known as the fastest image processing method presently, used visual words, which could enhance model classification by wording image records, to determine the risk factors and notified them to the work manager.

A risk management methodology for maritime logistics and supply chain applications

  • Mokhtari, Kambiz;Ren, Jun
    • Ocean Systems Engineering
    • /
    • 제4권2호
    • /
    • pp.137-150
    • /
    • 2014
  • In the marine industry although there has been significant growth towards safety, security and risk assessments or risk-based strategies such as marine insurance and regulations to avoid the risks of damage to properties and the environment or the prospect of premature death caused by accidents etc, the moves toward managing the risks which are linked directly to the business functions and decision making processes have been very slow. Furthermore in the marine industry most perceptions, methodologies and frameworks of dealing with hazards, risks, safety and security issues are for their assessment rather than their management. This trend reveals the fact that in different marine industry sectors such as logistics and shipping there is a lack of coherent risk management framework or methodology from which to understand the risk-based decisions especially for the purpose of design, construction, operation, management and even decommissioning of the marine related applications. On the other hand risk management is not yet viewed holistically in the marine industry in order to, for example, assign a right person, i.e. risk manager, who can act as a coordinator and advisor with responsibilities that are only specific to risk management. As a result this paper, by examining the present physical borders and risk-based activities in the marine industry, aims to propose an appropriate risk management methodology in addition to the emergent role of risk managers which will enable the industry users initially to become familiar with the concept of risk management at its holistic level. In the later stages this eventually can lead to development of risk management capabilities at an exclusive level and its integration into the marine industry functions in future.