Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.
The construction industry is in the process of changing from the existing labor-intensive production system to a construction automation system using advanced information and communication technologies. Accordingly, in order to identify key research areas and utilization technologies in the field of construction automation, this study collected the latest 17 years (2000-2016) of papers published in International Symposium on Automation and Robotics in Construction (ISARC) and conducted a correlation analysis between the construction management areas and automation technologies based on the keyword frequency. As a result, the BIM, WSN, and Augmented reality were extracted as the technology keywords with high correlation with various areas of construction management.
현재 건설공사 사후평가시스템 입력과정에서 자료가 오류 및 누락이 발생되는 경우가 많아 데이터의 신뢰성이 떨어지는 경우가 많다. 이에 따라 본 연구에서는 사후평가 결과분석의 신뢰성 확보를 위해 건설공사 사후평가시스템의 입력누락 및 입력오류에 대한 세부적인 분석을 실시하였다. 분석결과, 건설사업 초기 단계일수록 자료의 미입력된 자료의 비중이 높게 나타났다. 그리고 분석된 등록오류로는 참고자료의 부정확, "원" 단위 오류, 입력항목에 대한 이해부족 등으로 나타났다.
Journal of Construction Engineering and Project Management
/
제1권1호
/
pp.31-36
/
2011
Construction materials usually constitute a major portion of the total cost in a building construction project. Materials management Is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storage space. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the case studies reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia Is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.
건설 프로젝트가 대형화, 복잡화됨에 따라 건설 프로젝트에 투입되는 자재의 효과적 관리를 위하여, 바코드, RFID 등의 다양한 인식 기술의 적용이 시도되고 있다. 하지만 기존의 바코드, RFID 등의 기술의 적용은 기존 관리 업무에서 사용되지 않던 RFID 장비의 추가 투입과 부재 관리를 위한 RFID tag 부착 등의 추가 작업이 요구됨으로써, 공장 및 현장의 작업자들에게 관리 비용 증가, 추가 작업의 번거로움 등의 문제를 발생시키는 한계를 가지고 있었다. 또한 해당 장치를 인식하기 위한 별도의 RFID 리더를 소지하지 않는 경우, 해당 부재를 작업자가 해당 부재의 정보를 인식하기 어려운 한계를 가지고 있다. 따라서 본 연구에서는 Long-lead item 자재 중 철골과 PC 부재를 대상으로, 앞 서 제기된 문제점 개선을 위해 스마트 폰 등의 영상처리 기능을 이용한 문자인식 기술을 대체 기술로 제안하고, 제안된 문자인식 기술의 적용 가능성 테스트를 통해 기술의 적용가능성을 제시하였다. 또한 제안된 문자인식 기술을 보다 효과적으로 적용하기 위한 문자 표기 방식, 코드 체계를 제안하고, 기존 RFID 기반 물류 관리 프로세스와 비교를 통해 문자인식 기술이 실제 적용될 경우의 효과를 제시하였다.
A system to efficiently utilize construction information has been in demand as a result of the changing society where information and knowledge leads to added value. Consequently, the government established a comprehensive information network system for construction industries to manage and utilize construction information which is the currently in use. However, this system is oriented toward management and business performance estimation for engineering and does not integrate a management system for design, construction technology, and construction engineering services. Therefore, this study proposes to develop object technology and management system of construction services and its evaluation to provide such information in real time.
Recently, industrial accidents rate has been gradually decreasing due to the development of safety management methods, but until now, the accident rate in the construction sector is higher than other industries. Large-scale construction sites are operating systematic safety systems to reduce industrial accidents. However, small and medium sized construction sites do not have systematic safety system and lack safety management ability, so that disaster is not reduced compared with large scale construction site. As a result, disaster prevention technology instruction system has been implemented to reduce the disasters of small and medium scale construction sites. However, in the case of a small construction site less than 2 billion won, there is little decrease in the accident rate, and in some cases, the accident rate increases. After the technical guidance system has been implemented, it is necessary to identify the performance and problems of implementation and to improve its effectiveness. In this study, we suggest the improvement plan to improve the efficiency of the technical guidance system by analyzing the problems and actual conditions of technical guidance operation in small and medium sized construction work sites.
Depending on the growth of the construction industry, size of construction sites are becoming enlarged, and construction work is becoming diversified as well. However, this increases risks of safety accidents. In order to alleviate this problem, some large construction companies have implemented a Safety Patrol Management System (SPMS) in order to reduce accidents on construction sites. Aimed at the construction sites where SPMS has been applied, the purpose of this research is to calculate the proper number of SPMS safety mangers by comparing and contrasting the number of safety managers per person for each site with different sizes and the converted accident ratio. In addition, we also aim to calculate the adequate amount of SPMS safety management costs compared to the total amount of construction expenses required once SPMS is introduced.
For the purpose of automatic management and enhancing quality of construction, information technology has been employed in construction field recently. As a consequence, informative construction, which utilizes information technology to reduce construction time and optimize construction sequence, becomes a state-of-art field of construction. Considering this case, construction field should more actively adopt other engineering technologies of rapidly advancing fields, such as electronic, control, and informative engineering, in order to reduce construction cost and to solve environmental problems as well as to enhance construction quality. In this aspect, this paper introduces a novel research field 'Geo-mechatronics', which stands for the convergence of geotechnical engineering and mechatronics (i.e. automation of mechanics using electronic technologies). Since the ground is ubiquitous in every infrastructure construction, the Geo-mechatronics research is crucial for the development of construction technology in the future. Moreover, it is believed to that the Geo-mechatronics research will make our construction industry to be more future-oriented and internationally comparative industry.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.