A Study on the Calculation of the proper number of the SPMS safety managers and safety management ratio when introducing SPMS |
Yoon, Yeo-Chan
(Graduate School of Energy and environment, Seoul National University of Science & Technology)
Chung, Kwang-Seop (School of Architecture, Seoul National University of Science & Technology) Kim, Ji-Hoon (Architecture of the Graduate School, Seoul National University of Science & Technology) Kim, Sung-Min (KAB (Korea Appraisal Board)) |
1 | Cooper, M. D.(2006), "Exploratory Analysis of the Effects of Managerial Support and Feedback Consequences on Behavioral Safety Maintenance", Journal of Organizational Behavior Management, 1:1-41 |
2 | Eldukair, Z. A. and Ayyub, B. M. (1991),"Analysis of recent U.S. structural and construction failures", Journal of Performance of Constructed Facilities, 5(1):57-73, DOI |
3 | Kim, B.S. (2008), "The Appropriation and The Use Scheme of Safety Control Cost for Reducing Severity Rate of Injury on Construction", Journal of the Korea Society of Civil Engineers", 28(3):383-390 |
4 | Oh, S-W, (2013), "A Study on the Estimation of Occupational Safety and Health Expense Rate by Safety Environment Change in Construction Industry", Journal of the Korea Institute of Construction Engineering and Management, 14(4):.97-106 |
5 | Choi, S-H, (2014), "Development of Enforcement Rate for Occupational Safety and Health Management Expense by Construction Project Types and Percentage of Completion", Journal of the Korea Institute of Science and Technology information", 30(7) |