• Title/Summary/Keyword: construction inspector

Search Result 38, Processing Time 0.024 seconds

A Study on the Improvement of the Legal System for Digital Transformation of the Construction Inspection Works (건축공사 감리업무의 체계성 강화를 위한 법제도 개선안 연구)

  • Kim, Su-Na;Kim, Young-Jin;Lee, Woong-Jong;Roh, Young-Sook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.375-376
    • /
    • 2023
  • In this study, the legal and institutional status of construction supervising and construction inspector was identified. As a result of examining the definitions of construction supervision terms, focusing on domestic construction-related laws, it was found that there were no consistency between each laws regarding 'terminology' and 'definitions'. In addition, the scope of construction inspector's work continues to expand through the delegation provisions to lower statutes, however, responsibility, authority, and inspection cost are not taken into account properly. In addition in order to introduce digital technology to the smart construction site, which is currently active under way, it is judged that the law and institutional contents need to be improved further.

  • PDF

A Study to Revitalize of the Honorary Industrial Safety Inspector System - In Construction Industry - (명예산업안전감독관제도 활성화 방안 연구 -건설업 중심으로-)

  • Yoon, Jo-Duk;Han, Choong-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.4
    • /
    • pp.72-82
    • /
    • 2007
  • The purpose of this study is to put forward revitalization of the Honorary Industrial Safety Inspector System by using the survey(2006.05) of the Honorary Industrial Safety Inspector in the Construction Industry. It can be summarized to develop the system as the following: 1) If there are neither labor union nor representative of workers in a company, workers must elect the representative of workers at first and then recommendation of the honorary industrial safety inspector by the representative of workers, 2) It should regulated in the industrial safety and health act about the tenure of the representative of workers and the process of election, 3) Prohibition the honorary industrial safety inspector as the employer members in the Industrial Safety and Health Committee and exclusion of both main office supervisor and subcontract-company supervisor from the appointment of the honorary industrial safety inspector, 4) Measures to realize the prohibitive regulation of unfavorable treatment on the grounds that the inspector has performed legitimate activities as an Honorary Industrial Safety Inspector, 5) Statutory regulation of the educations' hours(primary education & professional education), 6) Specification of the professional education and increase of the frequency, 7) Support of the government(the Ministry of Labor) to revitalize the honorary industrial safety inspector system, 8) Put in a statutory form the regular hours to carry out the work of the honorary industrial safety inspector in the workplace.

Analyzing Cognitive Performance of Safety Risk Factors by Construction Industry Experience Using Eye Tracker (아이트래커를 활용한 건설업 경험에 따른 안전위험요인 인지 성과분석)

  • Nam, Jihyun;Mun, Junbu;Yun, Sungmin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.357-358
    • /
    • 2023
  • Due to recent enhance of safety law and regulations in construction sites, safety inspectors have been more required in construction sites. However, most of them are novice for safety inspection which have not enough experience and skill. Therefore, the novice safety inspector's performance on hazard recognition needs to be improved for effective safety management. The performance of safety inspection is influenced by the inspector's experience and background because the inspection is usually conducted by the inspector's eyes. Therefore, there is a difference in safety inspection performance between novice and experienced safety managers. This study aims to analyze the gap of risk perception between novice and experienced safety managers using quantitative visual data. For this objective, this study conducted eye tracking experiments for novice and experienced group to evaluate cognitive performance of safety risk factors. The results provides the level of safety awareness based on their experience in construction safety. The limitation of this study is a lack of the number of samples used in this study and did not consider the various characteristics of the participants. If these limitations are supplemented in future research, it can be used to develop safety education contents for novice safety managers.

  • PDF

A Study on the Management Information System for Supporting the Supervision of Construction Workplace (건설감리실무 지원을 위한 정보관리시스템 구축에 관한연구)

  • Noh, Dae-Won;Jeong, Byong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.85-93
    • /
    • 2003
  • The purpose of this study was to construct the management information system for supporting the supervision of construction workplace. For the purpose, firstly, this study surveyed the present states and the problems of construction workplace in Korea. And then, defined the range and the process of the supervision of construction workplace, and examined the information standards of construction and the CALS standards for supporting. As a result, this study proposed the first stage of management information system, which consists of several basic functions, such as, document management, system management and partially, duality management and construction information management.

A Study on the Analysis of System Improvement in Construction Accident Prevention through Technical Guidance on Data Analysis Results Report (중·소건설업체 재해예방 기술지도 결과보고서 자료 분석을 통한 제도 개선에 관한 연구)

  • Han, Gyeong-Bo;Cho, Jae-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.2
    • /
    • pp.29-36
    • /
    • 2016
  • This study of small & Medium-Sized construction sites construction disaster prevention technology conduction-site visits from the map results report by the inspector on-site advice and technical guidance for the analysis of deficiencies and potential construction of disaster revealed the potential factors causing an accident as follows. As a results, Should not be a once a month visits. Therefore should be changed at least twice a month to help prevent accidents of this system is to be judged.

Correlation Analysis between Inventory data and danger grade of Cut slope in Chungcheongdo (충청도 내 일반국도 절토사면의 현황자료와 위험도간의 상관성분석)

  • Kim, Jin-Hwan;Rhee, Jong-Hyun;Kim, Seung-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.980-983
    • /
    • 2008
  • KICT has been carrying out inventory research on the cut slopes of national roads. Inventory research results are basic data used in cut slope management system. Inventory data are classified by general status, cut slope characteristics and inspector opinion. Cut slope inventory data are utilized to figure out dangerous slopes and decide survey ranking of detailed safety diagnostication. This paper will draw dangerous cut slope and more important inventory data in Chungcheongdo via correlation analysis.

  • PDF

Study on Dangerous Cut-slopes Distribution Using Inventory Data in Chungcheongdo (절토사면 현황자료를 이용한 충청도 관내 위험절토사면 분포 연구)

  • Kim, Jin-Hwan;Koo, Ho-Bon;Rhee, Jong-Hyun;Yun, Chun-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.858-862
    • /
    • 2008
  • KICT has been carrying out inventory research on the cut slopes of national roads. Inventory research results are basic data used in cut slope management system. Inventory data are classified by general status, cut slope characteristics and inspector opinion. Cut slope inventory data are utilized to figure out dangerous slopes and decide survey ranking of detailed safety diagnostication. This paper drew the distribution of dangerous cut slopes using inventory data in Chungcheongdo, then verified an efficiency on distribution of dangerous cut slopes by comparing occurrence frequency of real collapsed cut slopes.

  • PDF

A Method for Detecting Concrete Cracks using Deep-Learning and Image Processing (딥러닝 및 영상처리 기술을 활용한 콘크리트 균열 검출 방법)

  • Jung, Seo-Young;Lee, Seul-Ki;Park, Chan-Il;Cho, Soo-Young;Yu, Jung-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.11
    • /
    • pp.163-170
    • /
    • 2019
  • Most of the current crack investigation work consists of visual inspection using simple measuring equipment such as crack scale. These methods involve the subjection of the inspector, which may lead to differences in the inspection results prepared by the inspector, and may lead to a large number of measurement errors. So, this study proposes an image-based crack detection method to enhance objectivity and efficiency of concrete crack investigation. In this study, YOLOv2 was used to determine the presence of cracks in the image information to ensure the speed and accuracy of detection for real-time analysis. In addition, we extracted shapes of cracks and calculated quantitatively, such as width and length using various image processing techniques. The results of this study will be used as a basis for the development of image-based facility defect diagnosis automation system.

Damage Detection and Damage Quantification of Temporary works Equipment based on Explainable Artificial Intelligence (XAI)

  • Cheolhee Lee;Taehoe Koo;Namwook Park;Nakhoon Lim
    • Journal of Internet Computing and Services
    • /
    • v.25 no.2
    • /
    • pp.11-19
    • /
    • 2024
  • This paper was studied abouta technology for detecting damage to temporary works equipment used in construction sites with explainable artificial intelligence (XAI). Temporary works equipment is mostly composed of steel or aluminum, and it is reused several times due to the characters of the materials in temporary works equipment. However, it sometimes causes accidents at construction sites by using low or decreased quality of temporary works equipment because the regulation and restriction of reuse in them is not strict. Currently, safety rules such as related government laws, standards, and regulations for quality control of temporary works equipment have not been established. Additionally, the inspection results were often different according to the inspector's level of training. To overcome these limitations, a method based with AI and image processing technology was developed. In addition, it was devised by applying explainableartificial intelligence (XAI) technology so that the inspector makes more exact decision with resultsin damage detect with image analysis by the XAI which is a developed AI model for analysis of temporary works equipment. In the experiments, temporary works equipment was photographed with a 4k-quality camera, and the learned artificial intelligence model was trained with 610 labelingdata, and the accuracy was tested by analyzing the image recording data of temporary works equipment. As a result, the accuracy of damage detect by the XAI was 95.0% for the training dataset, 92.0% for the validation dataset, and 90.0% for the test dataset. This was shown aboutthe reliability of the performance of the developed artificial intelligence. It was verified for usability of explainable artificial intelligence to detect damage in temporary works equipment by the experiments. However, to improve the level of commercial software, the XAI need to be trained more by real data set and the ability to detect damage has to be kept or increased when the real data set is applied.

A Study on the Actual Condition of Electrical Construction Supervision and Countermeasure of It (전기분야감리제도의 운영실태 및 개선방안에 관한 연구)

  • 고선환;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.147-150
    • /
    • 2002
  • Domestic electrical construction inspection system was introduced into building site in 1963 by registered architects' law, meanwhile, inspector appointed by ministry of owners lake charge of Government managing building site. Afterwards several systems has been adopted to heal some problems each of them has revealed. These times Government granted authority for inspection on surveillancer, furthermore, formulate a supervising system which articulate the responsibilities of supervision and put it in effect as of 1st, January, 1994. This supervision system gets rid of factors causing faulty work to a considerable extent. However, as it is still in early stage, the system has various problems to overcome, For example, actual state of handling modifications of design in accordance with supervision system in field shows a difference between process provided by law and field process. Thus this study inquire and analyze actual condition of supervision system, at the same time, problems occuring in modifications of design under supervision, and then propose a way to improve it

  • PDF