• Title/Summary/Keyword: construction improvement

Search Result 4,138, Processing Time 0.028 seconds

Analysis of Requirements for Improvement of the Work-Life Balance of Construction Managers (건축공사 현장관리자의 워라밸 개선에 대한 요구사항 분석)

  • Lim, Hyeong-Eun;Noh, Ju-Seong;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.124-125
    • /
    • 2018
  • The objective of this study is analyzing of requirements for improvement of the work-life balance of construction managers working in Korean construction companies. A survey has been conducted to analyze the requirements for improvement of construction managers. The survey was conducted on construction managers working in the field of architectural construction. 59 field managers working in 18 Korean construction companies responded to the survey. Upon analysis of the survey, the working hours were excessive and recreational time was very poor for the construction managers. There were differences in the answers regarding the areas that require improvement in the working conditions based on the age groups of the construction managers. A majority of young technicians selected that the recreational time and content of work require improvement, and technicians with a lot of experience selected that the stability of occupation and wage require improvement.

  • PDF

THE PRIORITIZATION OF IMPROVEMENT NEEDS FOR UNDERGROUND CONSTRUCTION ENVIRONMENT

  • Sanggyu Lee;Goune Kang;Chang-Won Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.111-114
    • /
    • 2013
  • Underground construction requires long construction duration and a variety of equipment, and environmental management and improvement of its activities are considered necessary. For the purpose of the environmental improvement of underground construction activities, the appropriate development of technologies to reduce generated pollutants is mandatory. However, the analysis of the needs of technology development and the evaluation of development priorities should take precedence. In this research, the needs for the improvement of each construction activity are analyzed as a preliminary study for a proposed technology development plan to improve the environmental performance of underground construction. Firstly, environmental problem factors caused by underground construction activities are determined while underground construction types, methods, and activities are classified. A questionnaire survey to determine the needs for the improvement of each activity is then carried out. The survey indicated that the most urgent activity to be improved is that of cutting excavation, which causes environmental problems associated with flying dust. This study could be used as a basis for a technology development plan for the environmental improvement of underground construction activities. The result of this study, the priority of improvement needs, contributes to the effective allocation of a limited Research and Development (R&D) budget.

  • PDF

A CONSTRUCTION PROCESS IMPROVEMENT MODEL USING CONSTRUCTION FAILURE INFORMATION

  • Yongseok Jeon;Chansik Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1065-1069
    • /
    • 2005
  • The construction failures can be decreased through continuous improvement of construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor for identifying and enhancing various ineffective construction processes that can prevent failures. This research proposes a process model for the continuous improvement of construction processes by using construction failure information. Extensive reviews and analyses of literatures related to construction failures are performed to investigate its definition, type, cause, and lessons learned. This research adapts process modeling methodology and case-based reasoning for the development of the proposed CIMCP(continuous improvement model of construction process), and then suggests its framework that contains modules of case retrieval, case index, and case adaptation.

  • PDF

Economic Feasibility Analysis on Construction Facility Improvement Project of North Korea Considering Technology Application Period (국내 기술의 적용시기를 고려한 북한 건축시설 개선사업의 경제적 타당성 분석)

  • Kim, Min Ju;Kim, Chang-Won;Lee, Dongyoun;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.68-69
    • /
    • 2016
  • North Korean market created by reunification of the Korean Peninsula is expected to serve as a new growth engine to the already-developed construction industry of South Korea. Improvement on deteriorated construction facility of North Korea is a project in urgent need at the initial stage of reunification. Prior to market entry of the Korean peninsula under these circumstances, economic feasibility analysis on construction technology application must be preceded by considering reunification period. Therefore, this study conducts an economic feasibility analysis on construction facility improvement project of North Korea considering application period of technology developed by South Korea. Results of this study are expected to be utilized in future reunification process as the basis for establishing relevant guidelines for construction facility improvement project of North Korea.

  • PDF

Analysis of Quality Improvement Priority for Construction PMIS

  • An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.10-21
    • /
    • 2012
  • As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.

Perception Based Definition of Construction Quality in Pakistan

  • Awan, Muhammad Yousaf Sadiq;Awan, Dr Muhammad Maqbool Sadiq
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.24-34
    • /
    • 2015
  • The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Improvement Index and Characteristic for the Safety Management Level of Domestic Construction Companies (국내 건설회사의 안전관리수준 향상지수 및 특성 분석)

  • Son, Chang-Baek;Lee, Dong-Eun;Choi, Seung-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.4
    • /
    • pp.51-56
    • /
    • 2007
  • In order to present basic data for the balancing improvement of safety management level in domestic construction companies the improvement index and characteristic of safety management level are offered by comparing the year 2006's safety level with the year 2001's one. The companies under concern are classified into 51 large scale companies and 61 middle and small scale ones. The safety management level of both head office and construction sites is improved for all companies without regard to the scale. Specially, the improvement index of middle and small scale companies shows the higher rate than large ones and head office higher than construction sites.

An Analysis on the Professional Perception of the Construction Worker and Its Improvement Measures (건설 근로자의 직업의식 실태분석 및 향상방안)

  • Shin, Won-Sang;Kim, Min-Jae;Lee, Kang-Hyup;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.210-211
    • /
    • 2014
  • This study was conducted to present the improvement in professional perception among construction workers engaged in domestic construction sites by analyzing the reality of their professional perception. The results are as follows: First, with regard to professional perception of the construction industry, managerial workers made their positive reply to items regarding construction and construction workers but had their negative attitude towards construction as a job and as a recommendable job for others; whereas production workers showed their negative reply to all the items. Second, with respect to factors for construction being firmly regarded as an 3D industry, managerial workers selected 'long working hours' and production workers replied with 'low wages and income insecurity.' Third, as for improvement activities for professional perception of construction, most of construction workers simply knew about activities being performed but expressed their intention to participate in the activities.

  • PDF

Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

A study on the Improvement for Organization Management of Small & Medium Construction Firms (중소건설업체의 조직관리 개선방안에 관한 연구)

  • Kim, Yong-Bum;Park, Gang-Sung
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.601-616
    • /
    • 2009
  • Small & Medium construction firms have been faced with demand of environmental changes. construction firms have been required to improve their structures to reinforce the competitiveness. so, these firms are making desperate efforts, which are reorganization, renovation, improvement. this study would be emphasized the Quality Management in construction work. For this, It must be supposed a plan to improve a construction organization. The Construction Firm would be executed Quality Management learning, leadership, understanding of Quality Management to construction workers.

  • PDF