• Title/Summary/Keyword: construction facilities

Search Result 2,712, Processing Time 0.034 seconds

The Development of an On-line Supervision System (전기수용설비 상시 감시 시스템 개발)

  • Moon, Hak-Yong;Ryu, Seung-Ki;Choi, Do-Hyuk;Kim, Se-Dong;Rim, Seong-Jeong;Yoon, Yong-Han;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 1997.07b
    • /
    • pp.513-515
    • /
    • 1997
  • The main purpose of this study was to develope the prototypes of on-line supervision system for maintenance to protect the confidence of operation of electric facilities in buildings. The influence of the harmonics on the electric facilities in building, which is recently growing more and more serious, were also analysed, and finally the essential techniques on the condition supervision, diagnosing method of facilities were proposed.

  • PDF

Methodologies for Effective Construction Information Management of Railway Facilities through Linking 4D CAD to IETM (4D CAD와 IETM 연계를 통한 철도시설의 효율적인 공사정보관리 방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Kim, Hyun-Soo;Ahn, Jae-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.139-142
    • /
    • 2008
  • Construction Management by using 4D CAD system analyzes operations information based on 3D and 4D objects. But it is difficult to provide a variety of documents linked by 4D objects in a lump from 4D CAD system based on visual object, and to get an optimal decision-making information to conduct business. Therefore, it is necessary to construct effective construction information management systems and to organize integrated information through linking non-objects to objects. This study suggests methodologies of effective construction management for railway facilities through building of framework for practical application and methodologies to link 4D objects to IETM documents. Accordingly, it is possible to establish a systematic decision-making for an effective construction management of railway facilities, and this provide integrated methodology for linking non-objects to objects.

  • PDF

Functional Analysis for P-C-M support System Design in Agricultural Facilities (농촌시설물 P-C-M Support System 범위를 위한 기능 분석)

  • Gim, Mi-Gyeong;Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee;Kim, Jun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.127-130
    • /
    • 2009
  • Recently agricultural productivity innovation projects are increasing all over the farming countries. To reform and improve the productivity of agricultural industry is important factors. This research is to do the functional Analysis for P-C-M support System Design in Agricultural Facilities. By analyzing the for P-C-M support System modules in the agricultural construction process, P-C-M support System factors are derived and defined. The result of this study would widely be used as a fundamental research guide to develop the agricultural P-C-M support System in the agricultural construction process.

  • PDF

A STUDY ON CULTURAL PRACTICES IN CONSTRUCTION CONTRACTING ORGANIZATIONS IN MALAYSIA

  • H. Abdul-Rahman;Wang Chen;Halimatun. Othman
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.169-178
    • /
    • 2007
  • This paper has investigated the cultural practices influencing business performance and integrity in selected Malaysian contractors and has discussed culture related issues to improve the management of cultural capitals in the Malaysian construction industry. Issues of current enterprise culture and applicable cultural practices, leadership styles, enterprise axiology and integrity, cultural practices and loyalty, and identification of organizational culture are discussed during the semi-structured interviews and questionnaire survey. Conclusions has been drawn that the people oriented and task oriented management style have a similar quantity of supporters in Malaysian contractors. The integrity and profit are respectively identified as the enterprise axiology in the ethical and economic perspective. The monkey culture is considered as the most applicable type for the cultural practice and the current enterprise cultures applied in the Malaysian contractors are mostly positive to both the organizations and society.

  • PDF

Analysis of the Effect of Construction of Public Cremation Facilities in Jeongeup City on Cremators Number Using E-Haneul Funeral Information System in Jeollabukdo and on Cremation Rate

  • Choi, Jae-sil;Kim, Jeong-lae
    • International journal of advanced smart convergence
    • /
    • v.10 no.1
    • /
    • pp.117-124
    • /
    • 2021
  • Based on a result of we research and analysis of this study, it was analyzed that the average annual cremators number using E-Haneul Funeral Information System among the five public cremation facilities in Jeollabukdo was 9,713 in total before the opening of public creation facilities in Jeongeup City (2013-2015), while the number was 12,159 after the opening of public cremation facilities in Jeongeup City (2016-2019); the number was increased by 2,446, compared to the opening period (2013-2015), with a large increase rate of 25.2%. In addition, the average annual cremation rate before the opening of public cremation facilities in Jeongeup City (from 2013 to 2015) was 71.6%, but the average annual cremation rate during the period after the opening (from 2016 to 2019) was 81.5%, which was a large increase rate of 9.9% compared to period before the opening of the facilities. Based on research results above, we have presented policy suggestions in order to increase the efficiency of operation and management of public cremation facilities by local governments as follows. First, in order to prepare for the increase in demand for cremation due to the increase in cremators number, a policy promotion for the expansion of "public cremation facilities" should be carried out as soon as possible, focusing on local governments whose supply has reached the limit. Second, in order to support the expansion and construction of public cremation facilities, the government subsidy rate and government subsidy at the level of current 70%, provided by the central government, should be further expanded. Third, overcoming theNIMBY conflict overlocation for public cremation facilities, theutilization rate should be enhanced, through the joint construction and facility operation of the public cremation facilities between local governments, and the ef iciency of the project implementation should be improved through the jointsharing of the facility operation cost.

Comparison Analysis of Construction Costs according to LEED and non-LEED Certified Educational Buildings (교육시설물의 LEED 인증유무에 따른 공사비 비교연구)

  • Ha, Sun-Geun;Son, Kiyoung;Kim, Ji-Myong;Kim, Taihui
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.6
    • /
    • pp.3-10
    • /
    • 2017
  • The efforts for sustainable development in building construction is widely applied by global organizations, governments, etc. However, according to the researchers, if the green rating systems on the building, it is reported that construction costs and durations are increased compared to conventional buildings. In this respect, the objective of this study is to identify the construction costs between LEED and non-LEED buildings. The scope of this study is limited in 21 university buildings of Canada. The methodology is as follows: First, the data of LEED and non-LEED buildings are collected in every university building. Second, the average construction costs per square meter is collected and normality check is conducted. Third, to identify statistical significance, the difference of average construction costs is analyzed by using T-test. As a result, it is concluded that the construction costs of LEED buildings are increased by approximately 3.8% more than non-LEED buildings. In the future, the results of this study can be applied to analyzing the additional costs according to the LEED grade in educational buildings.

Community Resident's Use of Elementary School Facilities (지역사회인의 초등학교시설 이용)

  • Min, Chang-Kee
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.5 no.3
    • /
    • pp.98-106
    • /
    • 1998
  • This paper is to find out a possibility that, adapting article 81 of regional finacing law, the community develops community facilities such as gymnagiums, swimming pools, and parking facilities in school site. The study requires an agreement about managements between the mayor and the superintendent of education. This paper also surveys community's needs with respect to use of school facilities before and after class, willingness to pay for the school use, and use of school facilities by private institutions. This paper adopts two experimental case studies to find a feasibility of community building construction in school sites. It also adopts dscriptive analysis of the statistics to find out the degree of willingness to use by community people. It is found, first, that regional finacing law permits community facilities' development in school sites and an agreement between the mayor and the superintendent of education about usage and profits should be made by the rate of construction fee and land cost. The second is that 65.8% of community people want to use school facilities such as gymnasium and school ground. And favorite series of physical exercise is swimming, baminton, tennis in order. The third is that 66.4% of community people have willingness to pay for the use of school facilities. The fourth is that school facilities such as class room, special class room, and computer room can be used by private institutions. 75% of community people agree to use school facilities by the private institutions. Favorite series on these are classes for reviewing the lessons, language classes, classes for playing musical instruments in order.

  • PDF

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

A Safety Evaluation on Play Facilities for Children -In Terms of Construction Work and Maintenance- (어린이 놀이시설의 안전성 평가 -시설물의 시공관리 상태를 중심으로-)

  • 신병철
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.27 no.5
    • /
    • pp.120-129
    • /
    • 2000
  • This main study was the subject of the play facilities of children picnicking place which was installed in apartment complex. As to the production period of the facilities, the materiality and the materials of the play facilities, we examined the safety estimation about them. And we drew up a plan which could build and manage the children play facilities improved the better. According to the installation place, the result of safety estimation, the safety of play facilities in Ga-Kyeong-dong apartment complex which built up after 1997 years was the most excellent, the play facilities of Sa-Gik-Dong apartment Complex which built long ago have showed even poorer in all items of safety estimation. According to the materiality of play facilities, though the safety of association play rod in the safety estimation was the most excellent, the safety of swing was the very poor. According to the materiality of materials, the association of wood, stainless in the safety estimation was the safest. Especially, even though wood is soft and kind materials, as it has a shortcoming, the practical use depreciates. If iron materials like stainless associates with wood, we have thought that they have the good effect of the practical use. We have judged that the distance of contiguity facilities and the safety of corrosion or rottenness within the item of safety estimation as a subordination variable were the poorest. The arrangement of play facilities and the selection of materials happened to these problems. And we have known that they should get accomplished the construction work to make a plan thoroughly from it early.

  • PDF