• 제목/요약/키워드: construction facilities

검색결과 2,712건 처리시간 0.029초

현장 적용성을 향상시킨 건설현장 소음예측프로그램 개발 (Development of the Noise Prediction Program to apply in Construction Site)

  • 오진균;박혜나;손장열
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2009년도 춘계학술대회 논문집
    • /
    • pp.302-309
    • /
    • 2009
  • Nowadays, the construction sites are growing in city every year, so complaints for construction noise have increased more and more. To analyze this noise scientifically, construction noise prediction program was developed in 1998 and 2005 but it is too difficult to apply program in field because there is few soundproof facilities and it can't understand the coordinate system and so on. The aim of this study is to develop noise prediction program to apply in construction sites. For this, the problems of existing program was analyzed and survey was performed to get requestion of field overseer and upgraded program. To get reliability of program, it was compared with sound measurement value in field. As a result, construction sound prediction program have various soundproof facilities data than existing program. It can also analyze multi receiver point at the same time for several construction machinery. Most of all, it is more powerful to set receiver or source in the axis of X, Y, Z. so program user can make use of it easily. An average of difference is -0.9$\sim$1.8dB.

  • PDF

현장 적용성을 향상시킨 건설현장 소음예측프로그램 개발 (Development of the Noise Prediction Program to apply in Construction Site)

  • 오진균;박혜나;손장열
    • 한국소음진동공학회논문집
    • /
    • 제19권4호
    • /
    • pp.409-417
    • /
    • 2009
  • Nowadays, the construction sites are growing in city every year, so complaints for construction noise have increased more and more. To analyze this noise scientifically, construction noise prediction program was developed in 1998 and 2005 but it is too difficult to apply program in field because there is few soundproof facilities and it can't understand the coordinate system and so on. The aim of this study is to develop noise prediction program to apply in construction sites. For this, the problems of existing program was analyzed and survey was performed to get requestion of field overseer and upgraded program. To get reliability of program, it was compared with sound measurement value in field. As a result, construction sound prediction program have various soundproof facilities data than existing program. It can also analyze multi receiver point at the same time for several construction machinery. Most of all, it is more powerful to set receiver or source in the axis of X, Y, Z. so program user can make use of it easily. An average of difference is -0.9~1.8 dB.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • 제10권3호
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

조선 후기 원유의 영선체제와 과정에 관한 연구 (A Study on the System and Process of the Construction and Management for the Royal Garden and Landscape in the Late Choson Dynasty)

  • 전영옥
    • 한국조경학회지
    • /
    • 제26권2호
    • /
    • pp.73-90
    • /
    • 1998
  • The construction and management of the royal garden and landscape were the most significant project in Choson Dynasty. The kind of the royal garden and landscape were the rear garden of the palace, the groves of the royal shrine and orchard, etc. As the important project of the country, these constructions were controlled by the administrative system without division into the fields of engineering, building and landscaping. The purpose of this study is to investigate the administrative system. In particular, this study is focused on the construction and management of the royal garden and landscape in Hanyang from the 18th century to the late 19th century. This study is based on the analysis of historic documents and a survey of the relics. The results were summarized as follows : 1) The administrative system of the construction and management of the royal garden and landscape was composed of the government offices under Industry Board as a permanent organization - Yongjosa, Santaeksa, Chunchonsa, Songonggam, Changwonso - and Togam as a temporary organization. In addition to these organizations, there were Revenue Board, Ceremony Board, Military Board, which served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and Songonggam. The high cost works were carried out through Togam and normal repairing works were completed by Songonggam. In case of planting, those works were carried out through Chunchonsa and the military. The management in the 3rd step; This process was done by two parts like the process of works. In case of facilities, management was done 효 the officers of Pongshim. In case of groves of newly - planted trees, this management was done by Tongsanbyonlgam and Tongsanjik who served cultivation and harvest of fruit trees as an expert.

  • PDF

중국의 정신의료시설 및 지원체계에 관한 법제도 연구 (A Study on the Regulation for Mental Healthcare Facility and Delivery System in China)

  • 고문매;윤우용;채철균
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제24권1호
    • /
    • pp.7-14
    • /
    • 2018
  • Purpose: This study analyzes mental healthcare delivery services and types of facilities, the status of installation and operation, and planning standard. The purpose of the study is to propose a basic data for the performance of related research and work tasks, along with an understanding of the Chinese mental healthcare facility type and support system. Furthermore, it will show a lack of current function management as the changes of mental health concept and demand for services increases, and it is intended to provide implications for the construction of mental health facilities. Methods: This study was conducted by a research on law and regulation of China's mental healthcare delivery service system and mental healthcare facility. The analyzed data are the national standard GB, the optional national standard GB/T, the building construction standard JGJ, and the report issued by the Health Planning and Development Committee. Results: At present mental healthcare facility construction in China is in the period of rapid development and it exposes the layout of medical facilities, which is not currently reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of mental healthcare service. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese Mental healthcare system and facilities, and can promote construction of Chinese mental healthcare facility theory in perfect condition.

중소규모 교량시설물의 유지관리를 위한 전자매뉴얼 구성 (A Study on the Electronic Manual of Maintenance System for Bridge Facilities on Local Area)

  • 정원명;장경태;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.581-584
    • /
    • 2003
  • 최근 건설분야에서는 시설물의 사용을 극대화하기 위한 유지관리분야에 많은 관심이 집중되고 있는 추세이며, 특히 여러 시설물 중 교량과 같은 경우는 일반인의 사용빈도가 많으므로 시공상의 결함이 발생할 경우, 치명적인 피해는 물론 많은 경제적인 손실이 예상되는 부분이라 할 수 있다. 본 연구에서는 교량 시설물의 안전한 사용과 품질향상을 위해 국내 중소규모 교량에 대한 유지관리 현황 및 교량 관리시스템을 분석하여 새로운 형태의 유지 관리시스템인 BF\_IETM (Bridge Facility\_Interactive Electronic Technical Manual)을 제안하여 그 활용효과를 살펴보았다. $BF\_IETM$은 그 이름에서 알 수 있듯이 일반 IETM의 기능과 역할을 포함하고 있는 것으로, 기존의 종이 기반의 건설기술문서를 컴퓨터를 이용한 전자문서체계로의 전환을 이룸과 동시에 첨단의 정보기술매체를 통한 시설물의 유지관리 업무 활동을 지원할 수 일도록 구성된 시스템이라 할 수 있다.

  • PDF

농촌시설물 시공 및 유지관리 정보화 시스템 구축을 위한 작업분류체계 구축에 관한 연구 -비닐하우스, 유리온실, 축사를 중심으로- (A Study on the Work Breakdown Structure of Agricultural Facilities for Developing a Construction and Maintenance Information System -Focused on Vinyl house, Glass greenhouse, Cattle shed-)

  • 최오영;김태희;김재엽;김광희;최응규
    • 한국건축시공학회지
    • /
    • 제9권4호
    • /
    • pp.147-155
    • /
    • 2009
  • 최근 들어 농촌에서는 농업규모의 증가, 기술적 복합성 증가, 대량 생산으로 시설물이 점차 다양화, 대형화, 복잡화 되고 있다. 또한 농업의 국제 경쟁력을 갖추기 위해 새로운 관리기술이 필요시 되고 있는 실정이다. 따라서 본 연구는 농촌시설물을 관리할 수 있는 정보시스템 구축을 위한 분류체계를 설정하고자 한다. 시설물에 대한 분류체계 및 코드부여 작업을 통해 PCM(조달-시공-유지관리)정보시스템 구축을 할 수 있을 것이다. 연구의 내용은 국내 건설정보 분류체계의 시설물(Facilities), 공간(Spaces), 부위(Elements), 공종(Works), 자원(Resources)의 5가지 자료를 분석하였으며, 농촌시설물에 적합한 항목들을 도출하였다. 농촌시설물 중 가장 높은 비율을 차지하는 비닐하우스, 온실, 축사 순으로 위계를 설정하여 연구를 진행하였으며, 그 결과, 비닐하우스는 프레임 공간과 시설물 마감공간으로 구분하여 자재코드를 부여하였다. 온실의 경우는 창호의 형태에 따라 코드를 부여하였으며, 축사는 H-beam축사, Pipe축사로 구분지어 코드를 부여하였다. 본 연구에서 설정된 분류코드는 향후 조달 시공 유지관리 시스템의 기초 데이터로 활용 될 것으로 사료된다. 시스템이 구축되면 제품의 부품화와 모듈화를 통해 전문가의 도움 없이 농민이 직접 설치 시공 할 수 있으며, 유지관리 및 교체부품의 정확한 구분으로 인해 폐기물을 최소할 것으로 판단된다.

위험물시설의 설계·시공·감리업 등록제 도입에 대한 타당성 검토에 관한 연구 (A Study on Assesment of Aalidity of Introducing of Design·Construction·Supervision Register Criteria Measures for Hazardous Materials Facilities)

  • 차정민;이용재;김인범;현성호
    • 한국화재소방학회논문지
    • /
    • 제29권1호
    • /
    • pp.27-37
    • /
    • 2015
  • 본 연구에서는 현재의 미흡한 위험물시설설치에 대한 실태를 분석하고 소방시설설치를 위한 설계 공사 감리업에 대한 등록제 도입에 대한 타당성을 조사하여 합리적 기준안을 제안하고자 하며, 위험물시설에 대한 설계 시공 및 감리업 등록제 도입방안 연구를 통해 국가적으로 위험물 시설에 대한 전문적이고 높은 수준의 안전성 확보방안을 제안하였다. 이를 위하여 위험물시설의 설치와 관련하여 설계업과 감리업에 대한 등록기준을 제도화할 필요성이 있는 것으로 파악되었으며 공사업의 경우는 보다 점진적인 제도마련이 필요할 것으로 파악되었다. 또한 이를 뒷받침하기 위한 기술력의 육성과 확보를 위해 국가자격의 신설을 고려할 필요성이 있을 것으로 판단된다.

일본의 민관협력에 의한 공공건축 조성방식 사례 연구 (A Case Study on Public Building Construction Method by Public-Private Partnership in Japan)

  • 염철호
    • 대한건축학회논문집:계획계
    • /
    • 제34권12호
    • /
    • pp.3-12
    • /
    • 2018
  • The purpose of this study is to draw implications for revitalizing public-private partnership system that can reduce the financial burden of the government and utilize the creative know-how of the private sector by analyzing the cases of public building construction projects by public-private partnership method in Japan. In this study, first of all, I looked at the current state of public-private partnership policy in Japan and then selected 8 representative projects as an analysis target. Next, in order to grasp the specific situation that is aimed at securing publicity and revitalizing private participation, I analyzed the role sharing between public and private sectors in the maintenance and management of public buildings, and examined the conditions for private revenue facilities. As a result of the analysis, the following implications were drawn. First, the methods of public building construction by public-private partnership in Japan are largely divided into BTO method based on the PFI method, and the method of installing public facilities and private revenue facilities based on the term leasehold rights system. Second, measures were taken to mitigate the burden of the state and local governments in establishing public facilities. Third, the public has delegated to the private sector actively about the role that the private sector can play, expanding the role of private sector widely from design to operation in the public building construction projects. Fourth, in order to actively participate in private sectors and promote regional revitalization, private profit-making projects are widely accepted, but consideration has been given to guarantee a certain level of publicity.

개인하수처리시설 운영 및 실태 연구 (Study on the Operation and Status of Private Sewage Treatment Facilities)

  • 이장훈;신현곤
    • 유기물자원화
    • /
    • 제28권2호
    • /
    • pp.31-40
    • /
    • 2020
  • 국내 개인하수처리시설은 불량제품의 유통과 부실시공의 우려가 끊이지 않아 오수처리시설의 계획 및 설계에 적용 가능한 단위공정별로 최소한의 기준은 필요할 것으로 판단된다. 본 연구에서 살펴본 운영실태 분석결과의 문제점 및 필요사항은 1) 개인하수처리시설 관리감독자의 교육 강화, 2) 오수처리시설 운영관리 미흡, 3) 하수처리구역 외 2 ㎥/day 미만 시설의 오수처리시설 의무화 검토, 4) 음식점 오수처리시설에 대한 관리방안 필요, 5) 기술검토결과 부적정 시설에 대한 개선안 마련이 필요하다. 또한 국내·외 개인하수처리시설 관련 지침 및 자료 등을 조사·분석하여 설계·시공 및 유지관리 가이드북을 마련할 필요성이 요구된다.