• Title/Summary/Keyword: construction facilities

Search Result 2,712, Processing Time 0.037 seconds

Development of the Noise Prediction Program to apply in Construction Site (현장 적용성을 향상시킨 건설현장 소음예측프로그램 개발)

  • Oh, Jin-Kyun;Park, Hye-Na;Sohn, Jang-Ryul
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.302-309
    • /
    • 2009
  • Nowadays, the construction sites are growing in city every year, so complaints for construction noise have increased more and more. To analyze this noise scientifically, construction noise prediction program was developed in 1998 and 2005 but it is too difficult to apply program in field because there is few soundproof facilities and it can't understand the coordinate system and so on. The aim of this study is to develop noise prediction program to apply in construction sites. For this, the problems of existing program was analyzed and survey was performed to get requestion of field overseer and upgraded program. To get reliability of program, it was compared with sound measurement value in field. As a result, construction sound prediction program have various soundproof facilities data than existing program. It can also analyze multi receiver point at the same time for several construction machinery. Most of all, it is more powerful to set receiver or source in the axis of X, Y, Z. so program user can make use of it easily. An average of difference is -0.9$\sim$1.8dB.

  • PDF

Development of the Noise Prediction Program to apply in Construction Site (현장 적용성을 향상시킨 건설현장 소음예측프로그램 개발)

  • Oh, Jin-Kyun;Park, Hye-Na;Sohn, Jang-Ryul
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.19 no.4
    • /
    • pp.409-417
    • /
    • 2009
  • Nowadays, the construction sites are growing in city every year, so complaints for construction noise have increased more and more. To analyze this noise scientifically, construction noise prediction program was developed in 1998 and 2005 but it is too difficult to apply program in field because there is few soundproof facilities and it can't understand the coordinate system and so on. The aim of this study is to develop noise prediction program to apply in construction sites. For this, the problems of existing program was analyzed and survey was performed to get requestion of field overseer and upgraded program. To get reliability of program, it was compared with sound measurement value in field. As a result, construction sound prediction program have various soundproof facilities data than existing program. It can also analyze multi receiver point at the same time for several construction machinery. Most of all, it is more powerful to set receiver or source in the axis of X, Y, Z. so program user can make use of it easily. An average of difference is -0.9~1.8 dB.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

A Study on the System and Process of the Construction and Management for the Royal Garden and Landscape in the Late Choson Dynasty (조선 후기 원유의 영선체제와 과정에 관한 연구)

  • 전영옥
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.73-90
    • /
    • 1998
  • The construction and management of the royal garden and landscape were the most significant project in Choson Dynasty. The kind of the royal garden and landscape were the rear garden of the palace, the groves of the royal shrine and orchard, etc. As the important project of the country, these constructions were controlled by the administrative system without division into the fields of engineering, building and landscaping. The purpose of this study is to investigate the administrative system. In particular, this study is focused on the construction and management of the royal garden and landscape in Hanyang from the 18th century to the late 19th century. This study is based on the analysis of historic documents and a survey of the relics. The results were summarized as follows : 1) The administrative system of the construction and management of the royal garden and landscape was composed of the government offices under Industry Board as a permanent organization - Yongjosa, Santaeksa, Chunchonsa, Songonggam, Changwonso - and Togam as a temporary organization. In addition to these organizations, there were Revenue Board, Ceremony Board, Military Board, which served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and Songonggam. The high cost works were carried out through Togam and normal repairing works were completed by Songonggam. In case of planting, those works were carried out through Chunchonsa and the military. The management in the 3rd step; This process was done by two parts like the process of works. In case of facilities, management was done 효 the officers of Pongshim. In case of groves of newly - planted trees, this management was done by Tongsanbyonlgam and Tongsanjik who served cultivation and harvest of fruit trees as an expert.

  • PDF

A Study on the Regulation for Mental Healthcare Facility and Delivery System in China (중국의 정신의료시설 및 지원체계에 관한 법제도 연구)

  • Gao, Wen Mei;Yun, Woo Yong;Chai, Choul Gyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.24 no.1
    • /
    • pp.7-14
    • /
    • 2018
  • Purpose: This study analyzes mental healthcare delivery services and types of facilities, the status of installation and operation, and planning standard. The purpose of the study is to propose a basic data for the performance of related research and work tasks, along with an understanding of the Chinese mental healthcare facility type and support system. Furthermore, it will show a lack of current function management as the changes of mental health concept and demand for services increases, and it is intended to provide implications for the construction of mental health facilities. Methods: This study was conducted by a research on law and regulation of China's mental healthcare delivery service system and mental healthcare facility. The analyzed data are the national standard GB, the optional national standard GB/T, the building construction standard JGJ, and the report issued by the Health Planning and Development Committee. Results: At present mental healthcare facility construction in China is in the period of rapid development and it exposes the layout of medical facilities, which is not currently reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of mental healthcare service. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese Mental healthcare system and facilities, and can promote construction of Chinese mental healthcare facility theory in perfect condition.

A Study on the Electronic Manual of Maintenance System for Bridge Facilities on Local Area (중소규모 교량시설물의 유지관리를 위한 전자매뉴얼 구성)

  • Jeong Won-Myung;Chang Kyung-Tae;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.581-584
    • /
    • 2003
  • Recently, construction industry has an interest on the maintenance area of construction facilities to maximize utilization of the each facility. This study suggests an interactive electronic technical manual for bridge facility to improve quality and to ensure safety of the bridge facility. The improvement method of bridge maintenance system consists of the basic information ell the facilities, maintenance manuals and measurement system. And the suggested system is based on the facilities, maintenance manuals and measurement system. And the suggested system is based on IETM (Interactive Electronic Technical Manual), and this study defines and develops a $BF\_IETM (Bridge Facility\_ITEM$ as the bridge maintenance system.

  • PDF

A Study on the Work Breakdown Structure of Agricultural Facilities for Developing a Construction and Maintenance Information System -Focused on Vinyl house, Glass greenhouse, Cattle shed- (농촌시설물 시공 및 유지관리 정보화 시스템 구축을 위한 작업분류체계 구축에 관한 연구 -비닐하우스, 유리온실, 축사를 중심으로-)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee;Choi, Eung-Kyoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.147-155
    • /
    • 2009
  • Recently, the scale and technical complexity of agricultural production has been growing. Therefore, agricultural facilities are being gradually diversified, expanded, and made more complex. To furnish Korea's agricultural industry with international competitiveness, it is thus necessary to introduce new management techniques. The PCM (procurement-construction-maintenance) information management system for agricultural facilities is established by setting up its WBS (work breakdown structure). In this study, the WBS of a facility such as facility, space, element, works, and resources is analyzed. Following this analysts, a WBS of an agricultural facility that is appropriate for the PCM information system of an agricultural facility, is proposed by deriving it from actual WBS.

A Study on Assesment of Aalidity of Introducing of Design·Construction·Supervision Register Criteria Measures for Hazardous Materials Facilities (위험물시설의 설계·시공·감리업 등록제 도입에 대한 타당성 검토에 관한 연구)

  • Cha, Jung-Min;Lee, Yong-Jae;Kim, In-Beom;Hyun, Seong-Ho
    • Fire Science and Engineering
    • /
    • v.29 no.1
    • /
    • pp.27-37
    • /
    • 2015
  • This study is to analyze current inadequate status of installing hazardous materials facilities, and to propose rational standards by researching validity for implementing registration for design, construction, supervision for installing fire safety facilities. By studying installation of registering designing, constructing, supervising industry on hazardous material facilities, professional and higher level of stability measures for national hazardous material facility was provided. For above reasons, necessity of institutionalizing of registering standards for construction and supervising industry became clear. Much more gradual institutionalization is needed for construction industry. Moreover, new national qualification should be reconsidered, in order to rebuttal the above and also to cultivate and acquire technical power.

A Case Study on Public Building Construction Method by Public-Private Partnership in Japan (일본의 민관협력에 의한 공공건축 조성방식 사례 연구)

  • Youm, Chirl-Ho
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.12
    • /
    • pp.3-12
    • /
    • 2018
  • The purpose of this study is to draw implications for revitalizing public-private partnership system that can reduce the financial burden of the government and utilize the creative know-how of the private sector by analyzing the cases of public building construction projects by public-private partnership method in Japan. In this study, first of all, I looked at the current state of public-private partnership policy in Japan and then selected 8 representative projects as an analysis target. Next, in order to grasp the specific situation that is aimed at securing publicity and revitalizing private participation, I analyzed the role sharing between public and private sectors in the maintenance and management of public buildings, and examined the conditions for private revenue facilities. As a result of the analysis, the following implications were drawn. First, the methods of public building construction by public-private partnership in Japan are largely divided into BTO method based on the PFI method, and the method of installing public facilities and private revenue facilities based on the term leasehold rights system. Second, measures were taken to mitigate the burden of the state and local governments in establishing public facilities. Third, the public has delegated to the private sector actively about the role that the private sector can play, expanding the role of private sector widely from design to operation in the public building construction projects. Fourth, in order to actively participate in private sectors and promote regional revitalization, private profit-making projects are widely accepted, but consideration has been given to guarantee a certain level of publicity.

Study on the Operation and Status of Private Sewage Treatment Facilities (개인하수처리시설 운영 및 실태 연구)

  • Lee, Jang-Hown;SHIN, Hyun-Gon
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.28 no.2
    • /
    • pp.31-40
    • /
    • 2020
  • As private sewage treatment facilities in Korea are constantly concerned about the distribution and poor construction of defective products, minimum standards for each unit process applicable to the planning and design of sewage treatment facilities are deemed necessary. The problems and requirements of the analysis results of the operation status discussed in this study are as follows. 1) Strengthening education of supervisor of private sewage treatment facility. 2) Poor operation and management of Sewage treatment facilities. 3) A mandatory review of sewage treatment facilities for less than 2 ㎥/day of facilities other than sewage treatment zones. 4) Necessity of management of sewage treatment facility in feedstocks. 5) As a result of the technical review, Improvement plans for Ineligible facility are needed. It is also necessary to prepare a guidebook for design construction and maintenance by investigating and analyzing guidelines and data related to domestic and foreign private sewage treatment facilities.