• 제목/요약/키워드: construction equipment

검색결과 2,757건 처리시간 0.033초

건설장비 개발과정에서 신뢰성성장관리 적용방법에 대한 연구 (Application of Reliability Growth Management for Construction Equipment Development Process)

  • 소영국;전영록;류병진
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제13권3호
    • /
    • pp.175-190
    • /
    • 2013
  • This study considers reliability growth management as the excellent method for construction equipment development with the effect on decreasing COPQ(Cost of Poor Quality Cost) of new products. MIL-HDBK-189A(1981) and RADC-TR-84-20(1984) standards provide a general concept of reliability growth management including to reliability growth test, models and FRACAS(Failure Reporting and Corrective Action System). There is no study how to apply reliability growth management to construction equipment(or machine) development. This paper propose the method to apply it to construction equipment development process from the reliability target setting for developing products to launching them at market. It is expecially showing how to set target reliability for new developing equipment and the development risk to reach the reliability target in detail.

사업비 절감을 위한 기계설비 건설기준 개선 항목 도출에 관한 연구 (The Study on Items derived of Machine Equipment Construction Standards for Project Cost Savings)

  • 김경훈;김태송
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.60-61
    • /
    • 2014
  • the reference values are high, because the Korean construction standards quote the foreign construction standars indiscriminately. Therefore ten experts were consulted to draw the items about the machine equipment construction standards for project cost saving in this study.

  • PDF

건설기계 연간표준가동시간 산정에 관한 연구 (A Study on Estimating Construction Equipment Annual Standard Operating Hours)

  • 이중석;허영기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.219-224
    • /
    • 2007
  • 최근 건설공사의 대형화와 복합화로 인해 건설기계의 사용은 지속적으로 증가하고 있으며 전체공사비 중 기계경비가 차지하는 비율 또한 점차 높아지고 있다. 하지만 현행 '건설공사 표준품셈'은 기상조건으로 인한 작업불가능일, 법정공휴일, 공사관리조건에 따른 작업중지일 등을 고려하지 않고 있어 실제 운전시간과는 많은 차이를 보이고 있는 실정이며, 따라서 현실적이고 합리적인 건설기계경비 산출기준을 제시해주지 못하고 있다. 본 연구에서는 견설기계의 현실적인 연간표준가동시간을 산정하기 위하여 우선 표준품셈 상의 건설기계를 각 공종별로 분류하고, 각 공종의 작업이 불가능한 기상조건을 설정하였다. 한편 2004${\sim}$2006년의 서울과 부산의 일일 기상자료를 분석하여 기상조건 및 법정공휴일에 의해서 연간 각 작업이 불가능한 일수를 산출하고, 중복일수를 공제하여 각 장비의 연간표준가동시간을 산정하였다. 그 결과 연간표준가동시간은 토공장비, 다짐장비, 기초공사장비는 1,430시간, 운반 및 하역기계(양중장비로 한정)는 2,124시간, 콘크리트 포장기계는 1,156시간, 아스팔트 포장기계는 1,188시간, 콘크리트기계는 1,688시간, 골재생산장비는 2,152시간으로 산정되었다.

  • PDF

다중선형회귀분석 기반 건설장비 이산화탄소 배출량 예측모델 개발 (Development of prediction methodology from CO2 emissions of construction equipment based multiple linear regression)

  • 권재민;이재학;조민도;최영준;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.38-39
    • /
    • 2019
  • Environmental problems caused by GHG emitted by various industries are emerging around the world, and accordingly, relevant regulations are being applied by countries around the world. Korea is operating a carbon credit system that trades GHG in industry for money, which is expected to be applied to the construction industry. In addition, construction equipment using fossil fuels accounts for the largest portion of $CO_2$ emissions in the construction industry, and the importance of $CO_2$ reduction and prediction is increasing. However, there is a lack of data on the directly measured $CO_2$ emissions of construction equipment and there is no accurate methodology for measuring methods. Therefore, in this study, independent variables were derived based on the $CO_2$ emission data. In addition, multiple linear regression is performed for each independent variable to derive a predictive model of carbon dioxide emission by work type of construction equipment. It is expected that the construction process plan based on environmental factors in the construction industry can be established in the future.

  • PDF

EVALUATING MANAGEMENT STRATEGIES THROUGH ECONOMIC MODELING OF HEAVY EQUIPMENT FLEETS

  • Tyler Johnson;John Hildreth;Scott Capps
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.219-225
    • /
    • 2013
  • State transportation agencies utilize fleets of heavy equipment to construct and maintain roadways. Equipment cost models can be developed to forecast economic life, which is the point at which the average unit cost to date reaches a minimum. A calculated economic life and cost models can be used to quantify the impacts of management strategies applied to a fleet. The purpose of this research was to develop an accurate method of quantifying the results of management strategies applied to a fleet of heavy construction equipment. The strategies evaluated are related to the annual usage of the fleet and the size of the fleet. More specifically the methodology is used to adjust the economic model to consider a limit to the annual decline in machine usage and a reduction in the number of machines in the fleet. When limiting annual machine usage, a specified rate is applied to the usage of the fleet, while total usage is held constant. This causes aging at a modified rate. A reduction in fleet size also causes a change to the usage of a fleet as the fleet must use fewer machines to produce the same total usage.

  • PDF

일반 굴삭기 장착 가능한 머신 컨트롤 키트 개발 및 성능 평가 (Development and performance evaluation of Machine Control Kit mountable to general excavators)

  • 이길수;김경수;정진범;박은성;고재일;박정종;주상현
    • 드라이브 ㆍ 컨트롤
    • /
    • 제21권1호
    • /
    • pp.31-37
    • /
    • 2024
  • In this study, to prevent accidents in underground facilities during excavation, we developed a Lv.3 automated control system that can be configured as an electronic control system without changing the existing hydraulic system in a general excavator and utilized digital map information of underground facilities. We aimed to develop a strategy to prevent accidents caused by operator error. To implement this, a real-time excavator bucket end position recognition and control system was developed through angle measurement of the boom, arm, and bucket using an electronic joystick, RTK-GPS, and angle sensors. In addition, excavators are large, machine-based equipment, and it is difficult to control overshoot due to inertia with feedback control using position recognition information of the bucket tip. Therefore, feed-forward control is used to calculate the moving speed of the bucket tip in real-time to determine the target position. We developed a technology that can converge and verified the performance of the developed system through actual vehicle installation and field tests.

건설기계산업의 선진화를 위한 관리체계의 개선 방안 (A Study on the Construction Equipment Management System for Strengthening Global Competitiveness)

  • 이준복;김성근;서종원;김영석
    • 한국건설관리학회논문집
    • /
    • 제9권1호
    • /
    • pp.55-65
    • /
    • 2008
  • 노동인력 중심의 건설생산방식이 기술집약방식으로 전환하기 시작되면서 건설기계에 대한 중요성이 인식되었으며 기계, 전기, 전자분야의 기술진보에 따른 건설기계의 기능 및 성능 또한 눈부신 발전을 거듭하고 있다. 2005년 건설기계의 등록대수가 32만대를 넘어서고 있으며, 기계화시공이 촉진되면서 건설생산의 안전성뿐 아니라, 생산성 및 품질의 향상을 도모하고 있다. 국내의 건설기계 관련 관리 및 산업육성을 위한 제도적 장치로서 건설기계관리법이 있다. 본 연구의 목적은 건설기계 산업의 선진화를 도모하기 위하여 건설기계의 범위, 등록, 형식승인 및 신고, 대여사업, 조종사면허 등 제도상의 각 항목별 현황, 문제점 및 개선방안을 도출하여 제시하고 있다. 이를 위하여 국내 전문가를 대상으로 설문조사를 실시하였으며, 국내 유사관련 제도의 검토 및 선진외국의 유사사례를 분석하였다. 본 연구의 결과로 도출된 20여 가지의 개선방안은 단기적 적용, 중장기적 추진 내용으로 구분될 수 있으며, 향후 지속적이고 심도 있는 연구 및 검토를 통하여 정책적 반영을 할 수 있는 매우 중요한 자료로서 활용될 수 있을 것이다.

시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발 (An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1)

  • 안방률;태용호;김대영;허영기
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.397-404
    • /
    • 2015
  • 국내 공공건설사업의 건설기계경비 손료 선정 시 사용되는 건설기계가격표는 급변하는 현실을 제대로 반영하지 못하고 있다. 본 연구에서는 현실이 반영된 기계경비 산정을 위해 "기계장비 시가표준액표"를 활용하여 표준품셈의 건설기계가격이 지속적으로 제 개정될 수 있는 체계화되고 선진화된 상시관리시스템의 방안을 개발하여 제시하고, 대표적인 장비에 이를 적용하여 건설기계가격의 변화가 정부예산에 미치는 영향을 분석하였다. 본 연구의 결과는 투명하고 공정한 공사비 산정기준을 정립하는 데 도움이 될 것으로 기대한다.

토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발 (Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project)

  • 김성훈;윤영철;주철범;윤동주
    • 한국전산구조공학회논문집
    • /
    • 제30권3호
    • /
    • pp.223-230
    • /
    • 2017
  • 토목시설물 건설사업에 BIM(building information modeling)이 적극적으로 도입되면서 시설물의 생애주기 동안의 활용도를 극대화할 수 있는 방안이 모색되고 있으며, 그 중, 시설물 공사 중 건설장비의 동적 거동을 반영한 검토 사례는 드물고 관련 기술 수준도 낮은 상황이다. 본 연구에서는 BIM 기반으로 구성된 가상현장 내에서 동적인 가상건설 장비 모델을 이용하여 공사단계에서 발생하는 장비운용의 안전성과 효율성을 검토할 수 있는 시뮬레이션 시스템을 개발하고 이를 실제 토목 현장에 적용하여 그 효용성을 분석하였다. 개발된 시뮬레이션 시스템이 건설장비에 대한 효과적인 3D 라이브러리 구축을 통해 공사관리자가 최적의 장비를 선정하고 경제적인 공사를 실현하기 위한 계획수립을 지원할 뿐 아니라 안전한 공사가 수행되도록 다각도의 분석을 가능케 해준다는 것을 확인할 수 있었다.

도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안 (A methodology for an effective utilization of construction equipment for highway construction projects)

  • 송호정;최재현
    • 한국건설관리학회논문집
    • /
    • 제15권6호
    • /
    • pp.26-34
    • /
    • 2014
  • 도로공사는 선형적이고 반복적인 공사로 공사의 특성상 건설장비에 대한 의존도가 높기 때문에, 건설장비의 효율적 운용에 의한 생산성 향상 및 공사비 절감 효과가 크다. 또한, 도로공사는 시공순서, 현장상황, 적용 공법에 따라 다양한 건설 장비의 선택이 가능하기 때문에 공정계획 시, 공종 간 연계에 따른 세부 작업 및 공법을 고려하여야 한다. 시공자는 현장조건에 맞는 작업을 선택하고 투입될 장비의 종류 및 성능, 수량 등을 사전에 파악하여, 적절한 건설장비 운용계획의 수립을 통한 경제성 향상 방안을 마련해야 한다. 하지만 한정된 유사 공사의 실적정보 및 체계적인 공사계획 방법의 부재로, 적정한 공정계획 수립이 용이하지 않으며, 공법 및 건설장비의 선정에 있어 대부분 경험과 직관에 의존한 공사를 수행하고 있다. 그 결과 시공 이전 공정계획단계에서 수립된 계획은 실행단계에서의 충분한 타당성을 확보하지 못하여 그 활용도가 제한적이다. 본 연구는 일반적인 도로공사의 초기 공정계획 수립단계에서 적용가능한 주요 공종별 공정로직을 개발하고, 공종 별 세부 시공절차 분석을 통하여 현장상황 및 공종에 적용 가능한 건설장비 운용 방안을 제시하였다. 또한 공정로직에 따른 다양한 건설장비 대안들을 대상으로 프로세스 시뮬레이션을 활용하여 경제성 기반의 최적화 장비조합 방안을 개발하였다. 개발된 방법을 이용하여, 계획단계에서의 수립된 다양한 공정계획에 대해 효율성을 평가하고 최적의 자원 선정을 위한 의사결정에 도움을 줄 것으로 판단된다.