• Title/Summary/Keyword: construction detail

Search Result 769, Processing Time 0.029 seconds

PDM Construction Instance For Automotive Company -Samlip Ind. PDM (자동차 부품 업체 PDM 구축 사례 -(주)삼립산업 PDM)

  • 사공극;함현욱
    • CDE review
    • /
    • v.9 no.3
    • /
    • pp.31-35
    • /
    • 2003
  • Product Data Management(PDM) is a tool that helps engineers and others manage both data and the product development process. Now a day, automotive industry is interested in PDM for their product's quality and cost. In this study, we introduce about samlip PDM construction instance. This case explains the demanded function of PDM and the detail implementation methodology for automotive company.

  • PDF

The Analysis of Routes and Construction Technologies in the Korean Grand Waterway (경부운하의 노선분석과 건설기술)

  • Jeong, Dong-Seok
    • Journal of the Korean Professional Engineers Association
    • /
    • v.41 no.2
    • /
    • pp.51-58
    • /
    • 2008
  • In this paper is described "the water resources policy, a new paradigm of water resources control. the characteristic of rainfall in Korea and the compatibility of a new water routes opening in natural river". Also the construction of the Korean grand waterway in the view of disaster prevention, flood control, irrigation and environment-friendly transportation is needed eventually. And I detail a routes of Korean grand waterway, using of a flood gate, supply of irrigation water. cruse duration, activating under developed region and economic efficiency.

  • PDF

FOLIATIONS FROM LEFT ORDERS

  • Baik, Hyungryul;Hensel, Sebastian;Wu, Chenxi
    • Journal of the Korean Mathematical Society
    • /
    • v.59 no.4
    • /
    • pp.699-715
    • /
    • 2022
  • We describe a construction which takes as an input a left order of the fundamental group of a manifold, and outputs a (singular) foliation of this manifold which is analogous to a taut foliation. We investigate this construction in detail in dimension 2, and exhibit connections to various problems in dimension 3.

The study on characteristic of efflorescence phenomenon and reduction plan through research (사례 조사를 통한 백화현상의 특징 및 저감 방안 연구)

  • 박영민;이희두;이해진;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.1-6
    • /
    • 2002
  • The study offer a suggestion that from result in being a case to efflorescence for decrease a plan: $\circled1$ A efflorescence of concreat a structure will be the prograss plan; In the materials, depress use to the water-sand in the construction, admonish unification of front and rear in the environment, consideration requisite concreat don't the occurrence efflorescence. $\circled2$ Ma sonry building efflorescence establish a ventilation opening and a waterway to ma sonry the times avoid the winter or the rainy season. Ma sonry building efflorescence will be make good among a brick to a brick interval closely mortar. $\circled3$ Tile building, tile of plasticity temperature is appropriate, reduce the deviation, parapet part of efflorescence will be make good closely mortar. A construction material part a meterial developing need Perfection of construction a efflorescence occurrence is the minimum, a plan Part developed so on, composition of a ommection field systematic effort need a efflorescence Prevention a kind of detail.

  • PDF

삼각형에서 n제곱 직선의 작도 방법에 대한 연구

  • Kim, Ji-Hoon;Cho, Seong-Hun;Lee, Dong-Chan;An, Seung-Min;Lee, Seong-Hyun;Han, In-Ki
    • East Asian mathematical journal
    • /
    • v.26 no.2
    • /
    • pp.267-280
    • /
    • 2010
  • In this paper we study construction methods of $n^{th}$ line in triangle. Russian Mathematician Zetel suggested some construction methods of $n^{th}$ line in triangle 80 years ago. We find Zetel's papers, in detail explain the Zetel's construction methods, and suggest two elementary construction methods. Our results are received in the process of Research and Education program in science high school.

A Study on Factors Affecting Changes in Estimating Standards in Plaster Work (미장공사의 품기준 변화 요인에 관한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.232-233
    • /
    • 2019
  • The plater work in the standard of estimate presents a variety of construction types. However, there is a part that does not fit the change of specification standards and on-site construction status, and it was revised in 2019's standard of estimate. In this study, we analyzed in detail the factors affecting the changes in estimating standards in the plater work. There were changes in the specification standards previously presented as primary coat, secondary coat, and formal coat as well as changes in on-site construction status such as thickness according to the number of plastering. Therefore, it is analyzed that the estimating standards can be classified by the number of finishes according to the site conditions by reflecting the analysis of the specification standards and site application status, and suggesting the finishing standards according to the number of plastering.

  • PDF

Construction Methods Review of Freeform Envelope Using 3D Scanning (3D SCANNING을 활용한 비정형 외장재의 시공 공법 검토)

  • Kim, Sung-Jin;Park, Sung-Jin;Choi, Young-Jae;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.100-101
    • /
    • 2014
  • The generation of 3D models for freeform buildings is an important task while continuous monitoring of the related spatial information at different time phases. Realistic models of freeform building have to provide high geometric accuracy and detail at an effective data size.(Al-kheder, S. 2008) The efficiency of this image-based technique has been increased considerably by the development of digital technologies. Furthermore, 3D data collection based on laser scanning has become an high quality 3D models for construction site. Therefore, in this research, we have an effort to review construction methods to make freeform envelope of building using 3D scanning technology.

  • PDF

Application of Reliability Growth Management for Construction Equipment Development Process (건설장비 개발과정에서 신뢰성성장관리 적용방법에 대한 연구)

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.13 no.3
    • /
    • pp.175-190
    • /
    • 2013
  • This study considers reliability growth management as the excellent method for construction equipment development with the effect on decreasing COPQ(Cost of Poor Quality Cost) of new products. MIL-HDBK-189A(1981) and RADC-TR-84-20(1984) standards provide a general concept of reliability growth management including to reliability growth test, models and FRACAS(Failure Reporting and Corrective Action System). There is no study how to apply reliability growth management to construction equipment(or machine) development. This paper propose the method to apply it to construction equipment development process from the reliability target setting for developing products to launching them at market. It is expecially showing how to set target reliability for new developing equipment and the development risk to reach the reliability target in detail.

Generating a Simplistic 3D Model for Mobile Platform Applications

  • Ahmed, Naveed;Park, Jee Woong;Morris, Brendan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1093-1099
    • /
    • 2022
  • The number of buildings is increasing day by day. The next logical footstep is tackling challenges regarding scarcity of resources and sustainability, as well as shifting focus on existing building structures to renovate and retrofit. Many existing old and heritage buildings lack documentation, such as building models, despite their necessity. Technological advances allow us to use virtual reality, augmented reality, and mixed reality on mobile platforms in various aspects of the construction industry. For these purposes, having a BIM model or high detail 3D model is not always necessary, as a simpler model can serve the purpose within many mobile platforms. This paper streamlines a framework for generating a lightweight 3D model for mobile platforms. In doing so, we use an existing structure's site survey data for the foundation data, followed by mobile VR implementation. This research conducted a pilot study on an existing building. The study provides a process of swiftly generating a lightweight 3D model of a building with relative accuracy and cost savings.

  • PDF

Profession and strategy of BIM managers in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.167-175
    • /
    • 2017
  • Building Information Modeling (BIM) comes to be implemented into architectural design, construction, and maintenance in Japan in order to convert design information thoughout a construction project. However, various problems are taking place in data transaction. It is not also clear about the role and the responsibility of the architects and the enginners in charge.There is a movement to establish a BIM manager as a general coordinator concerning BIM in Singapore and other countries, though it is not yet popular in Japan. This paper deals a BIM manager as a new profession in a construction project. The function and skills necessary to a BIM manager is analyzed, and the strategy of Japanese general contractors is discussed. General contractors from Japan are operating BIM in Singapore compatible with open system of supply chain. This style is different from the one in Japan even they belong to the same company. In this paper it is analyzed based on the survey in detail.

  • PDF