• Title/Summary/Keyword: construction detail

Search Result 772, Processing Time 0.024 seconds

Analyzing the ODA Construction Project Competence based on IPA (IPA 기반의 공적개발원조 건설사업 역량 분석)

  • Kim, Hwarang;Jung, Mincheol;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.66-72
    • /
    • 2021
  • Participation in official development assistance (ODA) construction projects can be proposed as a way to revitalize Korean small and medium-sized construction companies' entry into the overseas construction market. To this end, the necessary competency items were derived for the execution of the project, and a survey was conducted and an analysis of importance-current competency was performed. 24 out of a total of 32 competency items were analyzed as having a low level of competency compared to their importance, indicating that it is urgent to strengthen corporate-level capabilities for the smooth execution of related projects in the future. In detail, it is judged that it is necessary to seek to establish a preferential capacity-strengthening plan for contract management-related items such as the 'Construction-related fundamental laws, Contract management method, and International administration negotiation'.

Analysis of Thermal Cycles and Microstructure of Heat Affected Zone for a Low Alloy Carbon Steel Pipe under Multipass Weld (저합금 탄소강 배관재의 다층용접 열영향부의 미세조직 및 열이력 해석)

  • Kim, Tae-Wan;Ha, Jun-Uk;Kim, Dong-Jin;Kim, Jeong-Tae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.26 no.3
    • /
    • pp.497-504
    • /
    • 2002
  • The purpose of this study is to analyze thermal cycles and to investigate microstructures of heat affected zones for a low alloy carbon steel pipe under a multipass weld. The commercial finite element code SYSWELD is used to compute thermal cycles during multipass weld. The numerical results such as thermal cycles and size of heat affected zone are compared with those of the experiment and the two results show a good agreement. In addition, the microstructure and hardness are investigated from the weldment in detail. The weakest location is founded at intercritical region near the base metal.

Site Investigation and stability analysis for water tunnel being neighboring construction (근접시공에 대한 수로터널 지반조사 및 안정성 분석)

  • Jeon, Je-Sung;Kim, Ki-Young;Lee, Sang-Duk;Kim, Doo-Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.550-555
    • /
    • 2005
  • In vicinity of Seoul, there has been water service tunnel that classified into 1st grade facility by special act for the safety control of public structures and with providing capacity equals to $1,543{\times}10^3$(ton/day) and inner pressure equals to $2.5-3.5kg/cm^2$. In this research, site investigation and stability analysis for water tunnel caused by new construction of road tunnel were carried out. the ground near water tunnel were zoned into spatial area having similar geotechnical characteristics and estimating geotechnical properties for each area. The site for analysis consists of banded biotite gneiss, biotite schist and granite gneiss with spatial non-homogeneity, and for that reason weathering and fault zone were distributed with large scale. It's important thing to consider spatial ground zone and their geotechnical properties properly into stability analysis at design and construction stage. Also, using results of site investigation, stability of existing tunnel have been analyzed for Hydraulic Fracture/Jacking and deformation in detail.

  • PDF

Analysis of needs and providing coping strategies for efficient promotion of the u-City IT Infra Construction (u-City IT 인프라구축의 효율적인 추진을 위한 요구사항 분석 및 대응방안 연구)

  • Kim, Jeong-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.6
    • /
    • pp.2276-2283
    • /
    • 2010
  • This study investigated the needs of u-City related civil servants upon guideline which is constituted for efficient promotion of the u-City IT infra construction. It utilized explanatory design in mixed method as a research design. In the research result, respondents needed as follows : 1)law and institutions involved in construction processes, 2)information about engineering techniques with general terms in u-City constructions, 3)reference service models. It proposed implications of constructing the new guideline based upon research results.

Use of Output Specifications in PFI Housing Projects - How They Differ from Prescriptive Specifications

  • Lam, Patrick T.I.;Chan, Albert P.C.;Akintoye, Akintola;Javed, Arshad Ali
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.43-48
    • /
    • 2011
  • In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

A Research on the Construction of TUTU on the Korean Market (국내 시판 튀튀(TUTU)의 구성 실태조사)

  • 김선영;최영순;이병홍
    • Journal of the Korean Society of Costume
    • /
    • v.53 no.6
    • /
    • pp.63-74
    • /
    • 2003
  • The first objective of this study is to investigate and analyze the construction of TUTU and secondly, to propose a systematic research background on a sewing method of TUTU. The final objective is to provide the exquisiteness and the comfort for customer when wearing a stage costume. The research method to investigate the TUTU construction in detail is by renting or buying three major TUTU brands, which are selling in Korea. The results of this study can be summarized into four categories. Firstly, the Bustier composes into 8 to10 patches, and the external material or accessory differs by the work of art and its characteristics. Moreover, the cotton is used for the inner material. which depends on dancer's vital activities. Secondly, a skirt layer ranges from 6 to 12 layers with laces. In addition, the gather or the pleats is used to form a crease. Thirdly, lace or cotton is the material used for culottes because it is stretchy and lightweight. For the waist part. a rubber band is used since its wearability plus functionality. Lastly, an adjusting part for a stage costume varied for each dressers physical feature and can be corrected with inner hems together a hook, a thread loop or a zip. In conclusion, the results of this study can provide the quality improvement for TUTU and furthermore can propose a framework for an understanding and a practical use of TUTU construction.

Investigation on Ongoing Tideland Reclamation Projects in Western Coast of North Korea using Satellite Image Data (인공위성 화상데이터를 이용한 북한 서해안지역의 미완공 간척지 조사)

  • 조병진;안기원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.43 no.1
    • /
    • pp.75-86
    • /
    • 2001
  • North Korea reported that tideland reclamation projects had been successfully constructed and/or under construction during the period of the third development scheme(1987∼1993), which were 28,400ha in 9 project areas: 8 projects along the western coast and one in the eastern coast. In this study eight projects located in western coast were investigated in order to confirm the detail of works, construction stages and difference from our project formulation methods using the topographic maps published in different years and the recent sattelite image data especially Lansat TM and SPOT PN. Intensity-hue-saturation (IHS) method was adopted to merge two sattelite data for the image enhancement of remote sensing. Construction stages of sea-dikes, land consolidation for paddy and salt pan, reservoir for irrigation and desalinization and the present land use were investigated and estimated the acreage of the development areas. The total gross project areas of 38,105 ha: 16,555 ha completed for paddy or salt pan, 16,826 ha under construction, and 4,724 ha under planning were confirmed, although the area of 27,100 ha in 8 projects were reported to be completed or ongoing on the bimonthly journal of N. Korean Trend published in 1994.

  • PDF

A Study on the Control of the Floor Vibration in a Research Building (연구소(硏究所) 건물(建物)의 슬래브 진동(振動) 성능개선(性能改善) 연구(硏究))

  • Baik, In-Whee;Kang, Ho-Sub;Sohn, Young-Kyoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.75-82
    • /
    • 2007
  • A vibration in the building occurs by influences of the facility equipment and the structural system. As the building recently becomes higher and bigger, the vibration in the floor slab is issued. Specially, the vibration with $4{\sim}8Hz$ frequency is harder to control than any other range of frequency. This vibration easily affects human sensibility and often makes the resonance phenomenon by corresponding with the floor slab's natural frequency when people and heavy equipments move. Moreover, the permission regulations for the vibration of the building are established by building's purposes. However, it is not subdivided in detail and sometimes ambiguous to each client. Even though the vibration could cause negative influences in a research building, there is not the vibration criterion for a research building. Therefore, it is necessary to set up its own vibration criterion with the client before building and to keep checking this vibration criterion under the construction. This study proposes the reasonable control methods and the vibration criterion for floor slab's vibration which are adapted to the R4-project. The R4-project is a research building and a high-rise building also. Accordingly, this study could help to the next similar project in the design and the construction phase.

Evaluation on Flexural Behavior of Double-tee Slabs with the Least Depth from Optimization Process (최적이론에 의하여 설계된 최소 깊이 더블티 슬래브의 휨거동 평가)

  • 유승룡;김대훈;유재천
    • Journal of the Korea Concrete Institute
    • /
    • v.11 no.3
    • /
    • pp.141-152
    • /
    • 1999
  • Precast prestressed double-tee slab may be designed by the PCI Design Handbook. It is based on the bridge construction and is required for reorganization for the use of buildings in the domestic construction environments. Much enhanced sections are developed from the reforming process on the determined design factors in the previous experimental works on double tees. Pre-determined shape, reinforcement detail, and 5000 psi concrete strength can not be expected as the best solution for the domestic construction requirements because large amount of use on that systems are anticipated. Flexural tests are performed on four full-scale 12.5m proto-type models, "least depth double tee", which are resulted from the optimization process. Domestic superimposed live load regulation, domestic material properties which is available to product, building design requirements and economy in construction are considered as the main factors to establish. the first two sections are double tee section for 1.2 ton/$\m^2$ market live load with straight and one-point depressed strands and the second two are for 0.6 ton/$\m^2$ parking live load with those strand types. All of the specimens tested fully comply with the flexural strength requirements as specified by ACI 318-95. However, the research has shown that following improved considerations are needed for better result in practice. The locations and method of connection for the lowest bottom mild bar, connection method between precast and cast-in-place concrete, and dap-end reinforcement are need to be improved.

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF