Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

Analysis of 3D Building Construction Applications in Augmented Reality

  • Khan, Humera Mehfooz;Waseemullah, Waseemullah;Bhutto, Muhammad Aslam;Khan, Shariq Mahmood;Baig, Mirza Adnan
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.10
    • /
    • pp.340-346
    • /
    • 2022
  • Construction industry is considered as one of the oldest industries in the world since human came into being and the need of their own space is realized. All this led to make the world a space of many beautiful constructive ventures. As per the requirements of today's world, every industry is recognizing the need for use and adoption of modern as well as innovative technologies due to their benefits and timely production. Now construction industry has also started adopting the use of modern and innovative technologies during their projects but still the rate of adoption is so slow. From design to completion, construction projects take a lot to manage for which technology based solutions have continuously been proposed. These include Computer Aided Design (CAD), building information modeling (BIM) and cloud computing have been proved to be much successful until now. The construction projects are high budgeted, and direly require timely and successful completion with quality, resource and other constraints. So, the researchers observe the need of more clear and technology based communication between the construction projects and its constructors and other stakeholders is required before and during the construction to take timely precautions for expected issues. This study has analyzed the use of Augmented Reality (AR) technology adopting GammaAR, and ARki applications in construction industry. It has been found that both applications are light-weighted, upgradable, provide offline availability and collaborative environment as well as fulfil most of the requirements of the construction industry except the cost. These applications also support different screen size for better visualization and deep understanding. Both applications are analyzed, based on construction's application requirements, usability of AR and ratings of applications user collected from application's platform. The purpose of this research is to provide a detail insight of construction applications which are using AR to facilitate both the future developers and consumers.

Weights for Construction Performance Impact Factors of Public Construction Project (공공건설사업 건설성과 영향요인 가중치 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.373-379
    • /
    • 2012
  • Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.

Characterization of Runoff Properties of Non-point Pollutant at a Small Rural Area considering Landuse Types (토지이용 특성을 고려한 소규모 농촌유역의 비점오염물질 유출특성 해석)

  • Bae, Sang-ho;Kim, Weon-jae;Yoon, Young H.;Lim, Hyun-man;Kim, Eun-ju;Park, Jae-roh
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.4
    • /
    • pp.654-663
    • /
    • 2010
  • Attention has increasingly focused on the pollutant load discharged from rural area since the enforcement of total maximum daily loads (TMDLs) in korea. As one of the methods to control the inflow of pollutant load during wet weather events, local governments are attempting to apply non-point source control facility. To design those facilities appropriately, it is essential to understand the runoff characteristics of pollutants such as TSS, $BOD_5$, $COD_{Cr}$, TP and TN. In the paper, the quantitative analyses for pollutant runoff characteristics were examined in a small rural watershed with the area of about 53 hectares. For a dry weather day and wet weather events, variation patterns of dry weather flow and runoff characteristics of wet weather flows were monitored and investigated. The runoff model using XP-SWMM reflecting the landuse types of the watershed in detail was simulated to perform the sensitivity analyses for several factors influencing on their hydrograph and pollutographs. As a result, for the case of medium and small rainfall events (i. e. total rainfall of 35.8 and 17.5 mm), the impervious area including green house, roof and road which covers relatively low portion of total area (i. e. 16%) caused substantial first flush and the majority of total runoff load. Therefore, it has been concluded that the runoff characteristics of each pollutant and distribution of impervious area should be considered for the establishment of the control strategy of non-point pollutant runoff at a rural area.

Design of an Information System Prototype for Generating and Linking Ultra-precision Digital Maps of Construction Sites (건설 현장의 초정밀 디지털 맵 생성 및 연계를 위한 정보체계 프로토타입 설계)

  • Kim, Jong-Hyeop;Yeom, Dong-Jun;Ko, Hyun-A;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.6_2
    • /
    • pp.1015-1024
    • /
    • 2020
  • By nature, smart construction technology is a convergence technology, therefore aptly constructing and running an information system is needed in order to effectively develop and maintain it. Thus, in this study, an information system prototype was developed for the creation and linking of high precision digital maps at road construction sites for the effective performance of the development of the Information Collecting and Analyzing Techniques in the Construction Site (ICAT). For this, (1) defined input/output (I/O) data of each technical detail of ICAT, (2) analyzed the data flow, (3 ) proposed an information system prototype for high precision digital maps development and connection. Based on the information system prototype constructed in this study, it was inferred that each technique and its information for the Smart Construction Technique Development Business was in a consistent flow. Developed information system prototype would enable effective cooperation between subjects directly involved in the technique development, by defining I/O data in advance. Moreover, it would be of value to practitioners for refining the output data from each technique, thereby linking databases and forming Entity Relationship Diagram.

An Experimental Study on the Hysteresis Behavior of WUF-B Beam-Column Connection using SN Steel (건축구조용강재(SN490) 조립 H형강 기둥-보 접합부의 이력거동에 관한 실험적 연구)

  • Kim, Sun Hee;Lee, Seong Hui;Kim, Jin Ho;Kim, Dae Jung;Choi, Sung Mo
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.6
    • /
    • pp.807-815
    • /
    • 2008
  • The brittle failure where is occurred the welding position of column-beam flange of WUF-B connection that consider about a seismic detail possess a superior ductility capacity before Northridge earthquake 1994, require newly study about WUF-B connection. SAC Steel Project suggests a seismic detail to FEMA-350 by supporting of FEMA. It revise shape of weld access holes of WUF-B connection, welding processand welding material etc, In spite of these revision, AISC Seismic Provisions (2005) prescribe WUF-B connection using an only OMF. Recently in Korea, as the earthquake of about seismic intensity 5 occur, the necessity of revision for connection seismic detail comes to the front in Korea and FEMA-350 connection seismic details are going to include in KBC-2008 as it is. In this study, two column-beam connection specimens were marked by using SM490, SN490 built-up H-section, and based on WUF-B detail prescription of FEMA350. The parameters of the specimens are types of steel (SM, SN), and evaluate the capacities of structure and seismic by experiment. Finally we confirm a superior ductility capacity aboutspecimens JB-1 and JB-2, using SM490 and SN490,and these specimens had sufficient OMF and SMF seismic capacity, as indicated in AISC Seismic Provisions (2005).

Improvement Plan for the Payment Standard of Rental Fee in Construction New Technology (건설신기술 사용료 지급기준 개선방안)

  • Park, Hwan-Pyo;Oh, Un-O
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.193-201
    • /
    • 2006
  • The Evaluation system of Excellent Construction Technology has been operated for 15 years from 1990 in Korea. 443 technologies have been certified as Excellent Construction Technology(ECT) and those ECTs are adapted over 20,000 times into the construction projects. As a result of investigation, new technology evaluation system became a stable stage because new technology evaluation system has assigned about 433 and also applied more than 20,000 times in construction sites in 2004. However, it was indicated to a large problem that there aren't still detail criteria of cost assessment for using ECTs. Therefore, we analyzed the status and problems of the cost of using ECTs and suggested some useful ideas which are reviewed by various aspects. Specially we suggested specified criteria for the cost assessment of using ECTs. It is based on the scheduled construction cost and determined the rate $({\bullet}{\cdot})$ of using ECTs. To adapt ECTs into construction projects nationwide not only it is very important to certify better new technologies but also it is required to make the criteria of cost assessment for using ECTs.

Recent Status on the Recycling of Construction Waste and Research Trends - The Current Situation of Recycling Technology for Waste Resources in Korea(4) - (건설폐기물(建設廢棄物)의 리싸이클링 현황(現況)과 연구동향(硏究動向) - 국내자원(國內資源)의 유효이용(有效利用)을 위한 처리(處理) 및 회수기술동향(回收技術動向)(4) -)

  • Oh, Jae-Hyun;Kim, Mi-Sung;Shin, Hee-Duck;Min, Ji-Won
    • Resources Recycling
    • /
    • v.17 no.2
    • /
    • pp.16-29
    • /
    • 2008
  • According to the statistical data of the Ministry of Environment, 47million tons of construction waste were generated, and 96.7% of them was recycled in 2005. However, the recycled products seem to be remained under low quality. Because mixed demolition and construction waste, so called DC Waste, including concrete, brick, plaster, lumber, plastics building materials, paper and some dirt and stone, is very variable and difficult to estimate its exact composition, it is regarded as having little or no value to the construction industry. 'The Research group on recycling of construction waste' was started by the Housing & Urban Research Institute(KNHC), which is sponsored as a large scale national project by the Ministry of Construction and Transportation. This research group intends to establish recycling system through planing, processing, developing practical technology, and eventually contribute to save natural resource and to vitalize the industry. In this paper an overview of DC waste management and recycling technology is given in some detail. Particularly, "recycling law of construction waste" and recent research trends on recycling of construction waste are discussed.

A Study on Practices and Troubles of Reinforced Soil Wall (국내 보강토 옹벽 적용 현황 및 문제점 조사 연구)

  • Park, Jong-Kwon;Lee, Kwang-Wu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.1
    • /
    • pp.65-75
    • /
    • 2012
  • Since the modem reinforced soil wall technology was introduced in domestic civil engineering society in the year 1980, the reinforced soil walls have been extensively used because these technologies have advantages such as economical efficiency, graceful appearance, and easy construction. This paper describes the application of reinforced soil wall, design criteria, and construction problems. Many cases of troubles, which include a severe deformation of facing, cracks of facing block, overall sliding failure and so on, have been reported. Inappropriate design and construction management mainly induce these problems. The technological level of design and quantity control for reinforced soil wall is not sufficiently supported to cope with the growth quantity of reinforced soil wall construction market and the increasing number of construction companies. The unified standard design and construction criteria of reinforced soil wall should be established with the detail consideration of overall performance and stability. The quality control of design and construction, and cost of construction must be seriously executed to construct a high quality of reinforced soil wall.

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF