• Title/Summary/Keyword: construction damages

Search Result 521, Processing Time 0.027 seconds

Basic Research on Revetments Development of Erosion Protection for Coastline Creation of Hydrophilic Environment by Field Observation (현장관측에 의한 친환경 해안조성을 위한 침식방지 호안공 개발에 관한 기초적 연구)

  • Lee, Jong-Seok;Han, Jae-Myung
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.10
    • /
    • pp.983-993
    • /
    • 2008
  • In recent times, sea level increasing caused by abnormal weather and global warming, sea-sand dredging and complex development causes various kind of erosion damages onto the coastal area in the world. The various types of erosion control and protection methods are applied but there are no signs of fruitful effectiveness. The PC concrete protection block for shore protection structure is practically installed in globally but most of structures in the present day became villainous because of bad accessability. In this study, hydrophilic revetments for control and protection of coastline erosion will be developed in order to make up for a faculty of the shore erosion protection block with better accessibility and excellent protection ability. Experimental measurements were researched to insure for the capacity and facility on reflection coefficient, overtopping volume, and overtopping height characteristics of newly developed shore erosion protection block in model tests. As the result, hydraulic model tests show much excellent than the general step block. Field tests were carried out also to verify through vegetative test on an affinity and construction work test of control-protection on coastline erosion with actual utilization. In the latter case, deposition of sand accumulation occurred in fairly short time at the established reaches and then we can be confirmed to utilize for newly developed block as the revetments for control and protection of coastline erosion.

A Study for cost of road traffic accident taken offender's PTSD in consideration (교통사고 가해자의 외상 후 스트레스 장애를 고려한 도로교통사고 비용 연구)

  • Jang, Seok-Yong;Jeong, Heon-Yeong;Go, Sang-Seon
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.5
    • /
    • pp.17-29
    • /
    • 2010
  • The main objective of this study is to consider the necessity of introducing owner expenses in estimating the cost of traffic accidents, as is done in some advanced countries. It is known as "owner cost" in the U.S, "enterprise project price" in Japan, and "human cost" in the U.K. To achieve this, the seriousness and present state of post-traumatic stress disorder (PTSD) of traffic accident offenders, which is generally not observed when traffic accidents occur, are evaluated; countermeasures reflecting personal characteristics are prepared according to degree of affliction. The results could be summarized as follows. First, the present condition and seriousness of PTSD from traffic accidents that has been estimated only within the accidents offenders are evaluated through a survey. Second, a distinction analysis model is developed. 'Insomnia caused by accidents' and 'mental daunting in accident situations or similar ones during driving' are chosen as the variables of the discriminant. Third, as a result of the construction of an Ordered Probit Model to comprehend the seriousness of PTSD, the variables turns out in the order of 'seriousness of the most damaged victim, 'nightmare about the accident', 'insomnia experience', 'mental daunting during driving', 'gender', and 'major driving area'. Finally, the cures reflecting characteristics of gender and region are suggested, which are preferred for degree of seriousness of PTSD. The analysis shows that the method to minimize the damage, such as decline of work efficiency, by moving ahead the rehabilitation of the offenders would be suggested and this could minimize the direct and indirect damages that could happen to business owners for whom the drivers work.

Radiosensitivity of Lentil Bean (Lens culinaris L.) to Gamma-irradiation (감마선 조사가 렌틸(Lens culinaris L.)의 감수성에 미치는 영향)

  • Lee, Min-kyu;Ryu, Jaihyunk;Jeong, Sang Wook;Kim, Jin-Baek;Kang, Si-Yong;Kwon, Soon-Jae
    • Journal of Radiation Industry
    • /
    • v.10 no.4
    • /
    • pp.211-217
    • /
    • 2016
  • We examined damages from gamma-irradiaion and determined the optimal gamma-ray dose for mutation breeding in lentil (Lens culinaris L.) bean. Four individual lines (L-C, L-2, L-8 and L-9), that have remarkable adaptability in South Korea were gamma-irradiated at doses of 50, 70, 100, 200, 300, 400, and 500 Gy. The germination rate of seed decreased as the dose increased over 50 Gy in all lines. However, $LD_{50}$ and $RD_{50}$ were different among lines. The median lethal doses($LD_{50}$) were approximately 127 (L-C), 74 (L-2), 95 (L-8), and 144 (L-9) Gy. The median reduction doses($RD_{50}$) for plant height, number of leaves, root length, and flash weight were 156, 176, 150, and 180 Gy for L-C, 253, 198, 127, and 142 Gy for L-2, 188, 175, 200, and 190 Gy for L-8, and 162, 210, 224, and 184 for L-9, respectively. The growth characteristics of the $M_1$ generation decreased as the dose increased over 70 Gy. The optimal doses of gamma irradiation for mutation breeding of lentil were determined to be 70 Gy (L-2, L-8) and 100 Gy (L-C, L-9). We performed the comet assay to observe nuclear DNA damage induced by gamma-irradiation. In comet assay, a clear difference was identified over 100 Gy treatments. With increasing doses of gamma-ray in the range of 50 to 500 Gy, the rate of head DNA was decreased significantly from 97.5% to 81.6%. Tail length was consecutively increased from $1.9{\mu}m$ to $17.4{\mu}m$. Our result provides basic information for construction of mutant pools in lentils.

Analysis of Landslide Characteristics of Inje Area Using SPOT5 Images and GIS Analysis (SPOT5영상과 GIS분석을 이용한 인제 지역의 산사태 특성 분석)

  • Oh, Che-Young;Kim, Kyung-Tag;Choi, Chul-Uong
    • Korean Journal of Remote Sensing
    • /
    • v.25 no.5
    • /
    • pp.445-454
    • /
    • 2009
  • Localized unprecedented torrential rain and heavy rainfall cause repeated damages and make it difficult to detect and predict the landslide caused by heavy rainfall. To analyze the landslide characteristics of Inje area this study used satellite images photographed after the occurrence of landslide caused by the typhoon Ewiniar occurred in July, 2006, and for GIS analysis purpose, interpreted the satellite images (SPOT5) visually to digitize into developing parts, water traveling parts and sediment parts. For analysis of spatial characteristics, landslide areas obtained from visual interpretation of digital map, 3rd & 4th forest vegetation maps and detailed soil map and grids were overlaid and analyzed. As a result, in regard to topographic features, landslide occurred at places, of which average slope is $26.34^{\circ}$, had south, south-east, south-west aspects and average altitude of 627m. From hydrological analysis, it was found out that water traveling area rapidly spread approaching water traveling area and sediment area. From forest type analysis, it was found out that landslide occurrence was high in pine woods, and in terms of girth class attribute, landslide occurred in small-sized woods, in which the crown occupancy of trees that have the diameter at breast height, 6~16cm, was greater than 50%. From the analysis of soil series, landslide areas constitute 37.85% of OdF and 37.35% of SmF, which had sandy loam soil and excellent drainage capacity. Through this study, landslides in Inje area were characterized and SPOT5 images of 2.5m resolution could be used. But there was a difficulty in determining water traveling parts adjacent to urban area.

A Study on the Volcanic Ash Damage Sector Selection based on the Analysis of Overseas Cases and Domestic Spatial Information (해외 사례 분석과 국내 공간정보 분석을 통한 화산재 피해 분야 선정)

  • Han, Hyeon-gyeong;Baek, Won-kyung;Jung, Hyung-sup;Kim, Miri;Lee, Moungjin
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.5_1
    • /
    • pp.751-761
    • /
    • 2019
  • Mt. Baekdu, Mt. Aso, Mt. Sakurajima, Mt. Kikai and etc are distributed around the Korean Peninsula. Recently signs of eruption of Mt. Baekdu are increasing, raising concerns over possible damage to volcanic ash from seasonal winds during the winter eruption. Therefore, detailed procedures for investigation and countermeasures for volcanic ash spread and damage are required. But the standards for the warning and alarm signal of volcanic ash presented by Korea Ministry of Government Legislation are vague, with "when damage is expected" and "when serious damage is expected". In this study, to analyze the damage threshold and to apply the cases of overseas damage to the country, a survey was conducted on the establishment of domestic spatial information by public institutions with public confidence. As a result of the investigation of damage from volcanic ash overseas, the details of the damage cases were different depending on the type of life or income sources of each country. Therefore, instead of applying the volcanic ash damage cases abroad in Korea, spatial information analysis was performed to reflect domestic social and natural characteristics. In addition, we selected the areas to be considered in the event of volcanic ash damage in Korea. Finally, domestic volcanic ash damages should be classified as health, residential, road, railroad, aviation, power, water, agriculture, livestock, forest, and soil. When establishing the volcanic ash alarm optimized for Korea in the future, overseas volcanic ash damage cases and domestic spatial information construction in this study will be helpful in policy establishment.

Assessing 3D seismic damage performance of a CFR dam considering various reservoir heights

  • Karalar, Memduh;Cavusli, Murat
    • Earthquakes and Structures
    • /
    • v.16 no.2
    • /
    • pp.221-234
    • /
    • 2019
  • Today, many important concrete face rockfill dams (CFRDs) have been built on the world, and some of these important structures are located on the strong seismic regions. In this reason, examination and monitoring of these water construction's seismic behaviour is very important for the safety and future of these dams. In this study, the nonlinear seismic behaviour of Ilısu CFR dam which was built in Turkey in 2017, is investigated for various reservoir water heights taking into account 1995 Kobe near-fault and far-fault ground motions. Three dimensional (3D) finite difference model of the dam is created using the FLAC3D software that is based on the finite difference method. The most suitable mesh range for the 3D model is chosen to achieve the realistic numerical results. Mohr-Coulomb nonlinear material model is used for the rockfill materials and foundation in the seismic analyses. Moreover, Drucker-Prager nonlinear material model is considered for the concrete slab to represent the nonlinearity of the concrete. The dam body, foundation and concrete slab constantly interact during the lifetime of the CFRDs. Therefore, the special interface elements are defined between the dam body-concrete slab and dam body-foundation due to represent the interaction condition in the 3D model. Free field boundary condition that was used rarely for the nonlinear seismic analyses, is considered for the lateral boundaries of the model. In addition, quiet artificial boundary condition that is special boundary condition for the rigid foundation in the earthquake analyses, is used for the bottom of the foundation. The hysteric damping coefficients are separately calculated for all of the materials. These special damping values is defined to the FLAC3D software using the special fish functions to capture the effects of the variation of the modulus and damping ratio with the dynamic shear-strain magnitude. Total 4 different reservoir water heights are taken into account in the seismic analyses. These water heights are empty reservoir, 50 m, 100 m and 130 m (full reservoir), respectively. In the nonlinear seismic analyses, near-fault and far-fault ground motions of 1995 Kobe earthquake are used. According to the numerical analyses, horizontal displacements, vertical displacements and principal stresses for 4 various reservoir water heights are evaluated in detail. Moreover, these results are compared for the near-fault and far-faults earthquakes. The nonlinear seismic analysis results indicate that as the reservoir height increases, the nonlinear seismic behaviour of the dam clearly changes. Each water height has different seismic effects on the earthquake behaviour of Ilısu CFR dam. In addition, it is obviously seen that near-fault earthquakes and far field earthquakes create different nonlinear seismic damages on the nonlinear earthquake behaviour of the dam.

Material Characteristics, Provenance Interpretation and Deterioration Diagnosis of Shilla Stone Monuments in Jungseongri and Naengsuri, Pohang (포항 중성리신라비와 영일 냉수리신라비의 재질특성과 산지해석 및 훼손도 진단)

  • Lee, Myeong Seong;Han, Min Su;Kim, Jae Hwan;Kim, Sa Dug
    • Korean Journal of Heritage: History & Science
    • /
    • v.43 no.3
    • /
    • pp.122-143
    • /
    • 2010
  • The Shilla Stone Monument in Jungseongri was found during the road-construction in Pohang. It has approximately two hundreds of letters inscribed on the surface of one side, and it is estimated to be older than Shilla Stone Monument in Naengsuri which had been known for the oldest stele in Shilla Period. This monument is made of fine to medium-grained biotite granite, while the Shilla Stone Monument in Naengsuri is made of fine-grained granodioritic porphyry bearing feldspar and amphibole phenocrysts. Both rock types of the monuments are interpreted to be cognate with biotite granite in Shinkwangmyeon, and with granodioritic porphyry in Gigyemyeon. They are characterized by xenolith and miarolitic cavity. Damage aspects in both monuments are discoloring, cracking and breaking. These damages do not cause structural instability of the monuments, but attenuate aesthetic value. Black and brown discoloring contaminants on the surface of the Jungseongri Monument contain a high amount of manganese and iron. As a result of ultrasonic test, both monuments were evaluated to be medium-weathered (MW), although the velocity of the Shilla Monument in Jungseongri was slightly lower than the Shilla Monument in Naengsuri. This is because the Monument in Juengseongri had been exposed to outdoor environment for long time until the discovery. It is necessary for Shilla Monuments to be protected by appropriately environmental control and management.

Estimation of Frequency of Storm Surge Heights on the West and South Coasts of Korea Using Synthesized Typhoons (확률론적 합성태풍을 이용한 서남해안 빈도 해일고 산정)

  • Kim, HyeonJeong;Suh, SeungWon
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.31 no.5
    • /
    • pp.241-252
    • /
    • 2019
  • To choose appropriate countermeasures against potential coastal disaster damages caused by a storm surge, it is necessary to estimate the frequency of storm surge heights estimation. As the coastal populations size in the past was small, the tropical cyclone risk model (TCRM) was used to generate 176,689 synthetic typhoons. In simulation, historical paths and central pressures were incorporated as a probability density function. Moreover, to consider the typhoon characteristics that resurfaced or decayed after landfall on the southeast coast of China, incorporated the shift angle of the historical typhoon as a function of the probability density function and applied it as a damping parameter. Thus, the passing rate of typhoons moving from the southeast coast of China to the south coast has improved. The characteristics of the typhoon were analyzed from the historical typhoon information using correlations between the central pressure, maximum wind speed ($V_{max}$) and the maximum wind speed radius ($R_{max}$); it was then applied to synthetic typhoons. The storm surges were calculated using the ADCIRC model, considering both tidal and synthetic typhoons using automated Perl script. The storm surges caused by the probabilistic synthetic typhoons appear similar to the recorded storm surges, therefore this proposed scheme can be applied to the storm surge simulations. Based on these results, extreme values were calculated using the Generalized Extreme Value (GEV) method, and as a result, the 100-year return period storm surge was found to be satisfactory compared with the calculated empirical simulation value. The method proposed in this study can be applied to estimate the frequency of storm surges in coastal areas.

Study on Damage Information Management Plan for Maintenance and Operation of River Facilities (하천시설 유지운영을 위한 손상정보 관리방안 연구)

  • Joo, Jae-Ha;Nam, Jeung-Yong;Kim, Tae-Hyung
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.9-18
    • /
    • 2021
  • Recently, the rapid proliferation, introduction, and application of the fourth industrial revolution technology has emerged as a trend in the construction market. Building Information Model (BIM) technology is a multidimensional information system that forms the basis of the fourth industrial revolution technology. The river sector utilizing this information-based system is also being actively reviewed, for example, the current measures for maintenance. In recent years, active research and current work should be done to reflect the need for river experts to introduce BIM into the river field. In addition, the development of tools and support software for establishing various information systems is essential for the activation of facility maintenance information systems reflecting advanced technology and to establish and operate management plans. A study on the maintenance of river facilities involves using existing drawings to build a three-dimensional (3D) information model, check the damage utilizing it, and inform it, and utilize it as the data for maintenance reinforcement. This study involved determining a method to build a river facility without the existing information system and using the property maintenance information with 3D modeling to provide a more effective and highly utilized management plan to check maintenance operations and manage damages.

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF