A Basic Study on the Improvement for Liquidated Damages at Construction Delay (지체상금 개선방안에 관한 기초연구)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.458-461
    • /
    • 2006
  • With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.

  • PDF

A Case Study of Dispute Mediations on Construction Noise and Vibration Damages for Environmental Dispute Mediation (환경조정분쟁에 의한 건설소음.진동 피해분쟁조정 사례분석)

  • Jung, Eun-Jung;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.258-262
    • /
    • 2007
  • Recently people have come to demand more pleasant environments as the quality and right of life have been improved. Along with industrial development, the tendency is causing a growing number of disputes concerning environmental damages. Of many kind of environmental damages, noise and vibration pollution rising at construction fields are particularly the most common subjects of public grievance. Thus the government launched the Environments Dispute Mediation Committee in 1991, purposing to utilize fully the promptness and expertise of administrative institutes and to resolve environmental damage disputes promptly and fairly by interfering in them actively. With the prompt and fair dispute mediations of the committee, people came to be able to get fair and prompt remedies for damages in their health and fortune by environmental pollution. Therefore, by analyzing dispute mediation cases on construction noise and vibration damages, we will suggests basic material on which efficient actions can be takes for public grievances happening in the future.

  • PDF

A Case Study of Dispute Mediations on Construction Noise and Vibration Damages (건설소음진동 피해분쟁조정 사례분석에 관한 연구)

  • 곽광수;김재수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11a
    • /
    • pp.108-113
    • /
    • 2001
  • Recently people have come to demand more pleasant environments as the quality and right of life have been improved. Along with industrial development, the tendency is causing a growing number of disputes concerning environmental damages. Of many kinds of environmental damages, noise and vibration pollution rising at construction fields are particularly the most common subjects of public grievance. Thus the government launched the Environmental Dispute Mediation Committee in 1991, purposing to utilize fully the promptness and expertise of administrative institutes and to resolve environmental damage disputes promptly and fairly by interfering in them actively. With the prompt and fair dispute mediations of the committee, people came to be able to get fair and prompt remedies for damages in their health and fortune by environmental pollution. Therefore, by analyzing dispute mediation cases on construction noise and vibration damages, we will suggest basic material on which efficient actions can be taken for public grievances happening in the future.

  • PDF

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

An Empirical Study on Education Process Improvement for Effective Job Training of Construction Safety Manager (건설안전관리자 직무교육 과정 개선에 관한 연구)

  • Ji, Jun Seok
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.1
    • /
    • pp.23-31
    • /
    • 2018
  • Industrial disasters cause lots of damages from individuals to companies and country. Especially, damages caused by constructional disasters take very large portion in the whole industry and are accompanied by huge personal physical damages. For the prevention of disasters, roles of safety manager are very important and especially, effects of disaster prevention can be changed by occupational ability of construction safety manager. To improve job abilities of safety manager, job education is very important. This research suggested a model for job education management of construction safety manager and proposed improvements as a study on improvement of curriculum for vitalization of job education of construction safety manager so as to improve occupational ability of safety manager. To achieve them, this research examined standard and operation status of current job education of safety manager and the problems and suggested a model materializing job educational contents as a measure to vitalize job education system of safety manager.

Risk Analysis Considering Structural Damages of Stone Pagoda Structure (석탑구조물의 구조적 손상을 고려한 위험도 분석)

  • Kim, Ho-Soo;Kim, Dong-Kwan;Jeon, Geon-Woo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.20 no.4
    • /
    • pp.101-110
    • /
    • 2020
  • In case of stone pagoda structures, the various construction types appear, and various damages occur due to exposure to the outdoors for a long time. Such damages can be classified into non-structural damages and structural damages. However, studies for the effects of structural damages on stone pagoda structures are insufficient. Accordingly, this study intends to perform structural modeling and structural analysis according to structural damages of stone pagoda structure, and to perform risk analysis through the fragility curve. So, we expects that this study gives a great contribution to the preservation and maintenance of stone pagoda structures under the various structural damages.

A Study on Bridge Construction Risk Analysis for Third-Party Damage (교량공사 제3자 피해 손실에 의한 리스크 분석 연구)

  • Ahn, Sung-Jin;Nam, Kyung-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.137-145
    • /
    • 2020
  • The recent bridge construction projects demand thorough and systematic safety and risk management, due to the increase of risk factors following the introduction of new and complex construction methods and technologies. Among many types of damages that can occur in bridge construction projects, the damages to third parties who are not directly related to the existing property of the contractor construction project can also bring about critical loss in the project in order to compensate the damages. Therefore, risks that could be caused by the loss occurred to indemnify the third party damages should be clearly analyzed, although there are not subsequent amount of studies focusing on the issue. Based on the past record of insurance payment from domestic insurance companies for bridge construction projects, this study aimed to analyze the risk factors of bridge construction for loss caused to compensate the third-party damages happened in actual bridge construction projects and to develop a quantified and numerical predictive loss model. In order to develop the model, the loss ratio was selected as the dependent variable; and among many analyzed independent variables, the superstructure, foundation, flood, and ranking of contractors were the four significant risk factor variables that affect the loss ratio. The results produced can be used as an essential guidance for balanced risk assessment, supplementing the existing analysis on material losses in bridge construction projects by taking into account the third-party damage and losses.

Case Study of Construction Management in Damage due to Soil Particle Migration Using Inclinometer Incremental Deflection (경사계를 이용한 토립자 유출 관련 피해 시공 관리 사례 연구)

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.268-275
    • /
    • 2006
  • Excavation works of cylindrical shafts and tunnels for the construction of a variety of infrastructures have been frequently going on in the urban areas. When ground excavations of cylindrical shafts and shallow tunnels proceed in the ground condition of high water level and silt particle component, ground water drawdown involving soil particle migration causes loosening of ground around tunnels and shafts, causes settlement and deformation of ground. Damages due to ground sinking and differential settlement can occur in the adjacent ground and structures. The extent and possibility of damage relevant to ground water drawdown and soil particle migration can't be so precisely expected in advance that we will face terrible damages in case of minor carefulness. This paper introduces two examples of construction management where using incremental deformation graph of inclinometer, we noticed the possibility of soil migration due to ground water drawdown in the excavation process of vertical shaft and shallow tunnel, analysed a series of measurement data in coupled connection, properly prepared countermeasures, so came into safe and successful completion of excavation work without terrible damages. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Apportionment of Liquidated Damages and Compensation for Delay Damages in Domestic Construction Project : Analysis and Improvement (국내 현행 공기지연 책임에 따른 지체상금 및 손실보상의 문제점 및 개선방안)

  • Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.12-20
    • /
    • 2023
  • To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.