• 제목/요약/키워드: construction case

검색결과 6,334건 처리시간 0.032초

Adding AGC Case Studies to the Educator's Tool Chest

  • Schaufelberger, John;Rybkowski, Zofia K.;Clevenger, Caroline
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1226-1236
    • /
    • 2022
  • Because students majoring in construction-related fields must develop a broad repository of knowledge and skills, effective transferal of these is the primary focus of most academic programs. While inculcation of this body of knowledge is certainly critical, actual construction projects are complicated ventures that involve levels of risk and uncertainty, such as resistant neighboring communities, unforeseen weather conditions, escalating material costs, labor shortages and strikes, accidents on jobsites, challenges with emerging forms of technology, etc. Learning how to develop a level of discernment about potential ways to handle such uncertainty often takes years of costly trial-and-error in the proverbial "school of hard knocks." There is therefore a need to proactively expedite the development of a sharpened intuition when making decisions. The AGC Education and Research Foundation case study committee was formed to address this need. Since its inception in 2011, 14 freely downloadable case studies have thus far been jointly developed by an academics and industry practitioners to help educators elicit varied responses from students about potential ways to respond when facing an actual project dilemma. AGC case studies are typically designed to focus on a particular concern and topics have thus far included: ethics, site logistics planning, financial management, prefabrication and modularization, safety, lean practices, preconstruction planning, subcontractor management, collaborative teamwork, sustainable construction, mobile technology, and building information modeling (BIM). This session will include an overview of the history and intent of the AGC case study program, as well as lively interactive demonstrations and discussions on how case studies can be used both by educators within a typical academic setting, as well as by industry practitioners seeking a novel tool for their in-house training programs.

  • PDF

건설산업재해 저감 대책에 관한 사례분석 연구 (Case analysis study on measures to reduce accidents in the construction industry)

  • 강경하;소승영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.94-95
    • /
    • 2021
  • With the recent advancement of the construction industry, interest in it is growing as the accident rate in the construction industry continues to increase due to the enlargement and complexity of the construction scale. These social issues are focused on the safety of construction work, and research on construction industrial accidents is continuously being conducted, but research on measures to reduce construction industrial accidents is surprisingly insufficient. Therefore, in this study, research on reduction measures to increase the safety of construction industrial accidents conducted for 5 years from 2017 to 2021 is investigated and compared, and it is intended to be used as basic data for future construction industrial accident reduction measures.

  • PDF

사례분석에 의한 HPC공법의 공사비 분석 (Construction Cost Analysis of HPC Method by PC Construction Project Cases)

  • 노주성;김재엽
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰 (A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage)

  • 조성민;조성희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

설계변경에 의한 공사비의 증감에 관한 연구 (The Research about Increase and Decrease of the Construction Cost by the Alteration of Design)

  • 임칠순;이규철
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.106-113
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36$\%$) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose tool cost amounts to 2,009,000,000 won (1.37$\%$) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher material cost Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

사례기반추론을 이용한 강박스거더교의 개략공사비 산정 및 검증 (Computation and Verification of Approximate Construction cost of Steel Box Girder Bridge by Using Case-Based Reasoning)

  • 정민선;경갑수;전은경;권순철
    • 한국강구조학회 논문집
    • /
    • 제23권5호
    • /
    • pp.557-568
    • /
    • 2011
  • 공공 건설공사에서 공사 단계별 합리적인 공사비를 산정하는 것은 국가 예산의 효율적 확보 및 집행 등에 있어 매우 중요한 요소이다. 본 논문에서는 사업 초기단계의 가용정보가 제한된 조건에서 사례기반을 적용하여 강박스거더교의 개략공사비 추정 방안을 제시하였다. 또한 공사비 예측모델을 기존 설계사례에 대해 적용하여 본 논문에서 제시한 개략공사비 추정 모델의 정확성을 검증하였다. 연구 결과, 오차율은 비교적 안정적인 결과를 도출할 수 있었다. 따라서 국가 예산의 집행이나 수립에서 개략공사비 추정을 효율적으로 제시 할 수 있을 것으로 판단된다.

Applications of Product Process Analysis For Improving the Construction Process of Structural Steel

  • 이승현
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.101-108
    • /
    • 2004
  • A construction process consists of value adding activities and non-value adding activities, necessary or unnecessary. If construction personnel can eliminate inefficient and/or unnecessary activities within the process, they may have a great opportunity to improve their construction process. The Product Process Analysis (PPA) technique, which was developed in the manufacturing industry, can be applied for identifying wastes in the construction process and ultimately improving the process itself. It provides useful tools, such as a process chart worksheet and flow diagram, for mapping the flow of construction activities with predetermined standardized symbols. These tools make people understand the flow of activities more easily, identify value adding/non-value adding activities within the process, and areas where the process can be improved. The example applications of PPA are demonstrated in the paper through the case studies implemented on the construction process of structural steel. The results of case studies indicate that PPA technique was effective at identifying and removing wastes in the steel construction process. It is also found that PPA technique is more effective for improving highly repetitive construction processes.

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF

가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구 (A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area)

  • 박창욱;문승윤;윤석현
    • 한국건축시공학회지
    • /
    • 제8권4호
    • /
    • pp.61-69
    • /
    • 2008
  • The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.