• Title/Summary/Keyword: construction case

Search Result 6,334, Processing Time 0.038 seconds

A CONSTRUCTION PROCESS IMPROVEMENT MODEL USING CONSTRUCTION FAILURE INFORMATION

  • Yongseok Jeon;Chansik Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1065-1069
    • /
    • 2005
  • The construction failures can be decreased through continuous improvement of construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor for identifying and enhancing various ineffective construction processes that can prevent failures. This research proposes a process model for the continuous improvement of construction processes by using construction failure information. Extensive reviews and analyses of literatures related to construction failures are performed to investigate its definition, type, cause, and lessons learned. This research adapts process modeling methodology and case-based reasoning for the development of the proposed CIMCP(continuous improvement model of construction process), and then suggests its framework that contains modules of case retrieval, case index, and case adaptation.

  • PDF

Case Frames of the Old English Impersnal Cnstruction: Conceptual Semantic Analysis

  • Jun, Jong-Sup
    • Language and Information
    • /
    • v.9 no.2
    • /
    • pp.107-126
    • /
    • 2005
  • The impersonal or psyc-predicate construction in Old English (=OE) poses a special challenge for most case theories in generative linguistics. In the OE impersonal construction, the experiencer argument is marked by dative, accusative, or nominative, whereas the theme is marked by nominative, genitive, or accusative, or by a PP. The combinations of possible cases for experiencer and theme are not random, bringing about daunting complexity for possible and impossible case frames. In this paper, I develop a conceptual semantic case theory (a la Jackendoff 1990, 1997, 2002; Yip, Maling, and Jackendoff 1987) to provide a unified account for the complicated case frames of the OE impersonal construction. In the conceptual semantic case theory, syntax and semantics have their own independent case assignment principles. For impersonal verbs in OE, I propose that UG leave an option of determining either syntactic or semantic case to lexical items. This proposal opens a new window for the OE impersonal construction, in that it naturally explains both possible and impossible case frames of the construction.

  • PDF

An Evaluation on a calculation the increased cost of construction according to the Depth change of Concrete Slabs in Apartment Building by executing the law of floor impact sound (공동주택 슬래브 두께변화에 따른 공사비 증가 산정 평가 - 바닥충격음 법제화 시행에 따른 표준바닥구조를 중심으로 -)

  • Lee, Won-Yeul;Jeong, Sang-Min;Shin, Duck
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.2 s.16
    • /
    • pp.161-166
    • /
    • 2005
  • This study is to evaluate on the increased cost of construction according to the depth change of concrete slabs in apartment building. When we increased the depth of concrete slab from 150mm to 180, 210mm, the qualitative and cost of construction were calculated by the high-rise type, the unit-size type. As a result of this study, in 32 Pyong type, increment of construction cost rate appeared by $5.1\%$ in case of increase from slab 150mm to 180mm, and $10.0\%$ in case of increase from slab 150mm to 210mm. In 45 Pyong type, Increment of construction cost rate appeared by $5.7\%$ in case of increase from slab 150mm to 180mm, and $10.2\%$ in case of increase from slab 150mm to 210mm. In 55 Pyong type, Increment of construction cost rate appeared by $2.4\%$ in case of increase from slab 150mm to 180mm, and $8.9\%$ in case of increase from slab 150mm to 210mm.

Case Study of Small and Medium-Sized Construction Firms on the Cost Type Lien Suits (공사비 유형의 유치권 소송에 대한 중·소기업 건설업체 사례분석)

  • Yun, Ha-Jung;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.137-138
    • /
    • 2011
  • Mainly in construction liens to four contractors do not receive your order is caused by construction. This construction does not receive construction compunction to protect the contractor, I guess. On the other hand, the medium and small construction companies and contractors that could threaten the order four can be a problem. In this study, small construction companies to the lien of the lien claim on the issue of case studies have looked for the study. Small construction companies, in your case through the litigation between the lien of the lien litigation perspective, the cause of four orders after the analysis step by step construction was listed in chronological order. Identifying problem was the result of a lien. This study to previous studies regarding the lien on the issue through case studies of one kind of lien was derived for the problem. A follow-up studies and more case studies and interviews are considered necessary in the study.

  • PDF

A Study on the Framework of the Continuous Improvement Model of Construction Process using Construction Failure Information (건설실패정보를 활용한 건설 프로세스의 지속적 개선 모델의 개념적 틀에 관한 연구)

  • Jeon Yong-Seok;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.195-204
    • /
    • 2005
  • The construction failures can be decreased by continuously improving the construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor far identifying the ineffective process and providing the improved construction process that can prevent failures. The objective of this research is to suggest a model for improving construction process continuously by using the information of construction failures. An extended review and analysis of literatures related to the construction failure are performed to investigate the definition, type, cause, and lesson teamed of failure. This research also identifies that process modeling methodology and case-based reasoning are applicable to the construction process improvement, and then it suggests a framework of CIMCP(continuous improvement model of construction process based on the module of case-based reasoning such as case retrieval, case index, and case adaptation.

Reasoning Model of the Case-Based Construction Safety Management System (사례기반 건설안전 관리시스템의 추론 모형)

  • 예태곤;이재용;이현수
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.1
    • /
    • pp.167-176
    • /
    • 1999
  • Construction accidents occur reiteratively in similar fashions. There have been several attempts to develop a safety program for preventing construction accidents on sites. It will be very effective to use previous accident cases for establishing proper safety plan and managing safety process. This research develops a case-based construction safety management system which enables construction managers or safety managers to prevent potential accidents during the construction process. The case-oriented approach is performed through the representation of previous accident cases in accordant with the similarity to the conditions of current site. It uses a case-based reasoning which is one of the reasoning methods of an expert system. A prototype system for the reasoning model was implemented using one of the case based system development tools. The system was applied to a real construction site to verify its capability and validity. It was founded that the causes of accidents were successfully removed, so the proposed model proved to be reasonable. Additional research is needed to resolve the technical problem how to adapt the countermeasures for accident prevention provided by the reasoning model.

  • PDF

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Design and Implementation of Case-Based Reasoning System for Knowledge Management : The Case Study of Plant Construction Division of 'H' Cooperation (지식경영을 위한 사례기반추론 시스템의 설계 및 구축 : 'H'기업의 플랜트 건설 프로젝트 적용사례)

  • Jang, Gil-San
    • The Journal of Information Systems
    • /
    • v.18 no.3
    • /
    • pp.231-249
    • /
    • 2009
  • Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing case-based reasoning(CBR) system for managing knowledge like lessons learned and various documents accumulated in performing power plant construction projects which are receiving a lot of order from foreign countries such as the Middle East, etc. Our methodology is consisted of 10 steps : user requirement gathering, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface implementation, integration test. Also, to illustrate the effectiveness of proposed methodology, the real CBR system is implemented for the plant business division of 'H' company which has international competitiveness in the field of plant construction industry. At present, the implemented CBR system is successfully utilizing as storing, sharing, and reusing knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  • PDF

Derivation of the Safety Management Classification System for Modular Construction through Case Study (사례분석을 통한 모듈러 건축의 현장 안전관리 분류체계(안) 도출)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.173-174
    • /
    • 2020
  • In modular construction, safety management is required to prevent the occurrence of risk factors such as lifting work and high place work due to the characteristics of the construction method. Therefore, this study is a basic study for safety management of modular construction, and the purpose of this study is to compare and analyze the classification system of modular construction derived by analyzing the construction process of the existing case. Based on the results of this study, the safety management classification system will be used in future research to derive safety management factors in modular construction.

  • PDF

A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management (건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례)

  • Park, Young-Jin;Song, Kyung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF