• 제목/요약/키워드: construction alternatives

검색결과 451건 처리시간 0.022초

공동주택 습식 진공 외단열시스템 성능 평가 (Performance Evaluation of Adhesively Fixed External Insulation and Finish System Using Vacuum Insulation Panels for Apartment Buildings)

  • 박시현;임재한;송승영
    • KIEAE Journal
    • /
    • 제13권6호
    • /
    • pp.45-53
    • /
    • 2013
  • For the target goal of Zero-energy House construction in 2025, the government announced that the insulation regulations will be continuously enhanced. It has been predicted that high-performance insulation materials, such as vacuum insulation panel (VIP), should be used to decrease the thickness of outer walls. The aim of this study was to evaluate the performance of adhesively fixed external insulation and finish system (EIFS) with VIP. The energy performance of a base model with conventional internal insulation system and three alternatives of EIFS with VIP were analyzed by three-dimensional heat transfer simulation. Construction cost and convenience of each alternative were also evaluated and compared. As results, effective alternatives in terms of each performance as well as overall performance considering the weighting factors of each performance were suggested.

도시계획에 따른 개발밀도에 근거한 도시 대기오염 확산분석 - 네덜란드 Delft시를 사례로 - (Emission Dispersion Analysis based on the Development Density associated with Urban Planning (a case study of the Delft city on Netherlands))

  • 김인수;양충헌;허혜정;성정곤
    • 한국도로학회논문집
    • /
    • 제16권3호
    • /
    • pp.21-33
    • /
    • 2014
  • PURPOSES : This study presents a specific methodology for air dispersion analysis of urban areas methodology in accordance with urban planning and transport policy. METHODS : This study performed three alternatives including development density and public transit applying integrated urban model for the Delft city on Netherlands. Based on this result, the two types of air pollutant emissions($PM_{10}$, NOx) were calculated and analyzed the emission dispersion on that City. RESULTS : As a result, the quality of air near the City is better than that of current conditions showed that approximately from 2.1 to 7.9% according to alternatives. CONCLUSIONS : Air quality assessment in urban areas can be reasonably performed by applying a methodology when urban development and transport policy are considered.

Automatic Arrangement Algorithm for Tower Cranes Used in High-rise Apartment Buildings

  • Lim, Chae-Yeon;Kim, Sun-Kuk;Seo, Deok-Seok;Son, Ki-Young
    • 한국건축시공학회지
    • /
    • 제12권3호
    • /
    • pp.358-368
    • /
    • 2012
  • On most construction sites, the arrangement of tower cranes is decided by site engineers based on their own experience, which can cause cost overruns and delays in the lifting work. Although many researchers have conducted studies on tower crane arrangement using computer modeling and knowledge-based expert systems as well as mathematical models, no research has aimed to develop an algorithm to identify an optimum solution among several alternatives for installation areas of tower cranes satisfying the conditions of lifting work. The objective of this study is to develop an automatic arrangement algorithm for tower cranes used in high-rise apartment construction. First, as a new concept, a possible installation area of tower cranes was suggested. Second, after proposing several alternatives based on the installation points suggested in this study, an algorithm analyzing the economic feasibility of tower cranes was developed considering the rental, installation and removal costs. Third, a case study was conducted to prove the validity of the developed algorithm for selecting and installing an effective set of tower cranes at minimum cost.

Alternative Strategies to Central Heating Ventilation and Air Conditioning

  • Shrestha, Pramen P.;Prgada, Mythili
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.401-407
    • /
    • 2022
  • Central heating, ventilation and air conditioning (HVAC) is one of the largest consumers of energy in the residential sector. This project explores the use of multiple HVAC units and/or Zoning in a single residence to reduce energy loads. The energy consumption data of a detached single-family home using two HVAC units, one primary for the main house and a secondary HVAC for a casita, was collected for the same month for two consecutive years, along with details related to the outdoor temperature and the square footage being air-conditioned by each HVAC. A regression algorithm was trained using the above details to find the relation between the parameters. Next, based on the occupancy and usage patterns, the HVAC was redesigned assuming more area under the secondary HVAC unit. The trained algorithm was then used to make energy usage predictions for the revised primary HVAC area, with the assumption that the secondary HVAC unit was turned off. The results were compared with existing energy usage data. It was determined that there were significant energy savings in the second scenario. It is expected that this study and its findings will help future research projects explore more ideas as alternatives to central HVAC, in improving the economic viability of existing options, and in developing a savings calculation tool that will help consumers make informed decisions on their best alternatives to central HVAC.

  • PDF

건설공사 민원 최소화를 위한 민원분류체계 기반 설계성능향상 (Improvement of Design Performance for the Minimization of Public Grievances Based on a Construction Public Grievance Breakdown Structure)

  • 문성우;조화니
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.12-20
    • /
    • 2018
  • 건설사업은 사회적 그리고 경제적으로 파급효과가 크기 때문에 프로젝트 추진과정 중 다수의 민원이 발생된다. 이와 같은 현실에서 건설사업을 성공적으로 완료하기 위해서는 계획 및 설계과정에서 민원요인을 분석하고, 민원을 최소화하기 위해서 노력해야 한다. 본 논문은 건설사업의 민원을 평가하기 위한 민원분류체계를 제시하고, 민원분류체계를 바탕으로 설계기능을 개선하여 민원을 최소화하는 것을 목적으로 한다. 논문목적 달성을 위해 연구과정에서는 1) 건설사업 유형별 특성에 따른 민원요인을 분석하고; 2) 민원요인을 기반으로 민원분류체계를 개발했으며; 3) 민원분류체계를 체크리스트로 사용하여 설계대안 창출을 위한 절차를 제시했다. 사례분석에서는 실제 건설사업 설계를 대상으로 민원사전예방을 위한 설계대안을 창출하여 민원대응수준을 향상시켰다.

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

기술개발 투자안의 최적 포트폴리오 구성에 관한 연구

  • 이현정;이정동;김태유
    • 한국기술혁신학회:학술대회논문집
    • /
    • 한국기술혁신학회 2000년도 추계 학술대회(The 2000 Autumn Conference of korea Technology Inovation Society)(한국기술혁신학회)
    • /
    • pp.259-277
    • /
    • 2000
  • In this paper, we suggest theoretical grounds on the problem of R&D portfolio with different option premiums utilizing the Real Options Model, which has received intensified attention as the method of assessment of R&D project with high risk. Even though there have been many studies focused on the evaluation of option value of single project from technology valuation's perspective. there are few study on the portfolio of multiple technology investment by option value using. This paper bears practical importance by showing simple examples with the option value of investment alternatives and the valuation of related risk, the construction of optimum portfolio in technology investment alternatives.

  • PDF

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • 제71권2호
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • 김현정;이진국
    • 한국실내디자인학회논문집
    • /
    • 제24권5호
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.