• Title/Summary/Keyword: construction ability

Search Result 948, Processing Time 0.024 seconds

Planting-Ability Properties of Porous Concrete as Gradation and Void Ratio (포러스콘크리트의 골재입도 및 공극률에 따른 식생능력평가)

  • 윤덕열;김정환;조영수;표구영;박승범
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.243-248
    • /
    • 2002
  • As a notion of environment protection changes throughout the world, construction engineers, as part of the effort to resolve environmental problems, have been actively doing research on environmental friendly porous concrete using large and non-uniform aggregate. Porous Concrete enables water and air to pass through a firmly hardened material and allows required nutrients to reach roots of plants. The purpose of this study is to analyze planting ability when the change of aggregate gradation and void ratio. The results of an experiment from the planting ability of the porous concrete to its influence on the compressive strength are reported in this paper. As a result of the experiment, the compressive strength is higher when the gradation of aggregate is smaller, and it also goes higher when the void ratio gets smaller The planting ability of porous concrete is decided by the germination and the grass length of Indigofera pseudo-tinctoria(IPT). The length of IPT is longer when the gradation of aggregate is greater and the void ratio gets smaller.

  • PDF

Research about Competitive Power High Position of Food-Service Industry - Laying Stress on Eating Out Company Interior Factor - (외식기업의 경쟁력 강화 요인에 관한 연구 - 외식기업 내부요인을 중심으로 -)

  • 유택용;박면애
    • Culinary science and hospitality research
    • /
    • v.10 no.3
    • /
    • pp.83-96
    • /
    • 2004
  • According to construction of global administration environment, all over the world was ended up in infinite competition period. Because eating out company also competes with another company, it must enjoy competitive power high position to secure high position continuously, classified by formation constituent's individuation and two aspects of organic special quality by the factor. Individuation classified by formation constituent's business ability, personal relations, age factors of Information Technology, and organic special quality classifies by factor of formation culture and result that analyze eating out company's business condition competitive power reinforcement effect factor is same as following. First, was construed by company culture, personal relations, business ability period of ten days with family Restaurant, and Information Technology showed that do not influence. Competitive power reinforcement effect factor with special restaurant was construed by company culture, personal relations, business ability period of ten days, and fast food company culture and Information Technology factor with hotel restaurant company culture by competitive power reinforcement effect factor construe.

  • PDF

A Case Study On The Core Construction Method Applied to the Kolon Tripolis Project (코오롱 트리폴리스 코아 선행공법 시공사례 분석)

  • 이성진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.13-20
    • /
    • 2002
  • Recently, as the tripolis where the construction of the high-rising building is actively advanced domestic, it will be able to resist in the various horizontal load with the resistance system against hereupon to arrange R.C wall in Core Portion in order, like this building the core construction must preceding from the steel structure and it will reduce using of steel frame amount and it will be able to reduce a whole construction cost with a horizontal resistance ability from the report which provides a reference data to the similar project after to analyze the application of the mivan formwork system which relates in Tripolis.

  • PDF

A study on the Analysis of Building Information Modeling Factors of Construction Firms Using an Analytic Hierarchy Process (계층분석법을 이용한 BIM(Building Information Modeling)이 건설사에 미치는 영향요인 분석에 관한 연구)

  • Shim, Jin Kyu;Yi, Hye In;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.123-130
    • /
    • 2010
  • A lot of construction companies in overseas markets of construction try to change 2D CAD to 3D CAD for improving business ability and change to Building Information Modeling(BIM) for integrating information produced from construction life cycle. In America, GSA(General Service Administration) requires a design drawing planed by BIM and in Singapore and Europe, the government encourages architectures to use this tool. Recently in the domestic market, many organizations related construction industry are aware of importance of 3D CAD integrated information, and try to use BIM. Therefore, this research would analyze how does BIM affect construction industry and derive influence factors and provide basic data for using BIM.

A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique (서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Kim, Gwang-Hee
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.11 no.3
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

A Current Status Study on the Introduction of CM at Risk on the Domestic Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 도입 현황 분석)

  • Yoo, Seung-Kyu;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.5-8
    • /
    • 2009
  • This paper investigated the qualitative introduction status of domestic major construction company. And that focused on a point of suggestions about CM at Risk introduction. The survey analysis showed that three importan suggestions. First, the biggest obstacles factors to CM at Risk introduction that related laws is lagging amendment. Second, we have to improve the available hands ability in domestic major construction company. And last, we have to do that using uncomplicated design and standard design form. Consequently, environmen analysis for the introduction and example project is urgently required.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

Scenario-based Learning: Experiences from Construction Management Courses

  • Lim, Benson Teck-Heng;Oo, Bee Lan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.583-587
    • /
    • 2015
  • Scenario-based learning (SBL) has been used in a variety of training situations across different disciplines. Despite its seemly widespread use in construction management discipline, very few attempts have been made to explore its effectiveness and the respective students' learning experience. Using a survey research design, this study aims to investigate students' perceptions on SBL approach in construction management courses. The specific objectives are: (i) to identify the characteristics of a favourable SBL environment, and (ii) to explore the students' learning experience and effectiveness of the SBL approach. The results show that the four characteristics of a favourable SBL environment are: effective team formulation, constant engagement with lecturer, working in a group, and incorporation of motivational incentive for participation. The students really appreciated the opportunities to apply concepts learnt in the lectures in their SBL group work. Also, they perceived that the SBL approach is effective in developing their reflective and critical thinking skills, analytic and problem-solving skills and their ability to work as a team. These findings should facilitate more critical approaches to similar form of teaching methods.

  • PDF

A Study on Construction of Multiplication Knowledge with Low Reasoning Ability (추론 능력이 열등한 초등학교 2학년 학생의 곱셈 지식 구성 능력에 관한 연구)

  • Lee, So-Min;Kim, Jin-Ho
    • Journal of the Korean School Mathematics Society
    • /
    • v.12 no.1
    • /
    • pp.47-70
    • /
    • 2009
  • The purpose of this research was to confirm one of constructivists' assumptions that even children 조o are with low reasoning ability can make reflective abstracting ability and cognitive structures by this ability can make generation ability of new knowledge by themselves. To investigate the assumption, learner-centered instruction were implemented to 2nd grade classroom located in Suseong Gu, DaeGu City and with lesson plans which initially were developed by Burns and corrected by the researchers. Recordings videoed using 2 video cameras, observations, instructions, children's activity worksheets, instruction journals were analyzed using multiple tests for qualitative analysis. Some conclusions are drawn from the results. First, even children with low reasoning ability can construct mathematical knowledge on multiplication in their own. ways, Thus, teachers should not compel them to learn a learning lesson's goals which is demanded in traditional instruction, with having belief they have reasoning ability. Second, teachers need to have the perspectives of respects out of each child in their classroom and provide some materials which can provoke children's cognitive conflict and promote thinking with the recognition of effectiveness of learner-centered instruction. Third, students try to develop their ability of reflective and therefore establish cognitive structures such as webs, not isolated and fragmental ones.

  • PDF

DEVELOPMENT OF IDEA HIERARCHY MODEL FOR IDEA GENERATION OF CONSTRUCTION VE

  • Jinkook Yang;Sungwoo Moon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.504-509
    • /
    • 2011
  • Recently, construction projects are very complicated and diverse such as high-rise buildings and big bridges, etc. These complicated projects call for a system which can effectively generate productive ideas and activities. Value Engineering (V.E.) activity within construction projects is a necessity for systematic design management and to improve construction ability. This need in the construction industry has required a regular implementation of VE into construction projects. For this reason; America, South Korea, and some other nations have adopted VE applications which control the baseline investments of the construction projects. The process of VE activity is a preferred system and a reasonable alternative. In particular, idea generation within these projects is an important stage in the VE job plan. In this study, VE idea patterns are extracted through best practice analysis from VE cases of road construction projects. Next, we suggest an idea hierarchy model to be used in conjunction with VE idea patterns. This model is supported by reasonable idea generation in VE activity of construction projects. Finally, this model could possibly be the outcome of successful VE results.

  • PDF