The cause of crack on reinforced concrete structures is varied, while the studies, which have intended to analyze this in the material side, have been the mainstream so far. Therefore, in this study, we intended to suggest the proposals for enhancement of the system to reduce crack and to improve the quality of the reinforced concrete structures, by reviewing the cause of crack mainly in the structural aspect and analyzing the practices and the system. The result has been shown as following. (1) As one of the measures for improving the constructional system related to the structure, it is to enhance the relevant system so that design on construction, structure, and equipment, can be separately ordered or jointly ventured, and the owner or the agent of the owner can discuss and mediate the business in each specialized field. (2) Importance on construction supervision and new establishment of regulations related to structure supervision.
The International Atomic Energy Agency (IAEA) entails independent decision-making for the safety supervision of civil nuclear facilities. To evaluate and review the safety of nuclear facilities, the national regulatory body usually consults independent institutions or external committees. Technical Support Organizations (TSOs) include national laboratories, research institutions, and consulting organizations. Support from professional organizations in other countries may also be required occasionally. Most of the world's major nuclear power countries adopt an independent nuclear safety supervision model. Accordingly, China has continuously improved upon the construction of such a system by establishing the National Nuclear Safety Administration (NNSA) as the decision-making department for nuclear and radiation safety supervision, six regional safety supervision stations, the Nuclear and Radiation Safety Center (NSC), a nuclear safety expert committee, and the National Nuclear and Radiation Safety Supervision Technology R&D Base, which serves as the test, verification, and R&D platform for providing consultation and technical support. An R&D system, however, remains to be formed. Future endeavors must focus on improving the technical support capacity of these systems. As an enhancement from institutional independence to capability independence is necessary for ensuring the independence of China's nuclear safety regulatory institution, its regulatory capacity must be improved in the future.
In order to maintain and protect professionalism in color planning, the present study examined the process at the time of realization of color through color inspection and supervision in the actual construction site and suggested plans for improvement. Reflecting the characteristics that the governing body of the construction site is not a private person but an organization, the present study aims to provide institutional measures so that the supervisor of color construction at the actual site of construction can propose concerns related to proper construction at the right time, and the matters cannot be decided from the perspective of a layman. The institutional measures are proposed through the case of application of a process at the construction stage of the color planning at the construction site of Muju Taekwondo Park. First, the process clarified where the responsibility lies by specifying special conditions concerning color inspection on the field guide and color contract. Second, the sample for building materials was selected after obtaining it from a company capable of supply and is appropriate for the planned unit cost so that it could play an important role in realizing colors at the stage of basic design. Third, the process of construction was ensured not by temporary selection of colors but by continuous approval of colors in consideration of the conditions of construction site through letter of approval of color at each stage and point of time. Fourth, coordination of various color elements of other fields including landscape, interior, and electricity ensured construction of the whole structure in one color concept. Fifth, color inspection through the mock up of the site will minimize erroneous construction and reconstruction and prevent decrease in productivity. Sixth, this study also suggested more comfortable and positive color environment through evaluation by experts and users. The researcher of this study expects that color experts actively participate in the stage of construction to contribute to improvement of the color environment.
대한민국 건설업의 사망자 수는 전 사업 사망자의 50%가 넘는 비중을 차지하고 있다. 이는 OECD 국가 중 최상위에 위치하는 수준으로 그동안 정부에서는 이에 대한 다양한 해법을 제시하였으나, 유의미한 효과를 보지 못하였다. 지난 문재인 정부에서는 건설산업에서 가장 큰 권한과 영향을 가진 발주자를 비롯한 처벌의 사각지대에 있던 기업의 최고경영자에게 안전에 관한 책임과 의무를 강화하고자, 중대재해처벌법 입법화를 비롯하여 다양한 법제를 강화하였다. 그러나 반년이 지난 현 시점에서 이러한 처벌성의 강화와 단편적 대책으로 인한 효과를 발휘했는지는 여전히 의문이 생긴다. 본 논문에서는 건설산업의 여러 주체 중 CM/감리의 업역에서 중대사고를 저감에 기여하기 위해 현 제도의 문제점과 향후 개선방안에 대한 입법정책적 방향을 제시하고자 하였다.
국내 대다수의 토목 CM을 포함해 특히 도로부문 CM은 근 10여 년 간 다양한 시범 사업을 수행하고 있으나, 현재 건설시장의 안착에 상당한 어려움을 겪고 있으며 감독, 감리, CM이 과도기적으로 운영되는 여건 속에서 다양한 문제점에 노출되어 있다. 이러한 상황 속에서 부실시공 및 안전문제 등으로 대변되어 온 건설 산업에 대한 부정적인 시각을 극복하고 건설 산업 전반에 걸친 비용절감 및 품질향상을 이룩하여야 하는 당면과제는 필수적이다. 이를 위해 각 주체와 효율적으로 융화될 수 있는 CM의 정착은 매우 중요하다고 볼 수 있으며, 현재까지 다양한 분야에서 토목 CM의 정착화 방안에 대한 검증을 추진 중에 있다. 하지만 아직까지 수행성과에 대한 정확한 측정이 이루어지지 않고 있는 실정이며, 발주자를 위해 CM에 대한 객관적인 이해를 돕는 문헌이 매우 부족하다고 판단된다. 본 연구는 이러한 문제를 해결하고 발주처의 관점에서 바라본 CM 제도 활성화를 추진하기 위해 현재 수행되고 있는 다양한 CM의 업무 및 제도분석을 실시하였으며, 이를 통해 빈번하게 발생되는 문제점의 해결방안을 다각도로 제시하였다. 또한 발주처를 대상으로 설문조사를 실시하여 발주처의 관점에서 바라본 CM 제도 활성화 방안을 다양한 측면에서 제시 하였다. 이를 통해 얻어진 연구 결과는 향후 CM의 제도적 정립에 있어 중요한 기여를 할 것으로 판단된다.
This study is to find out primary factors through the punch list in the large scale apartment housing complex, to prevent repeatedly occurring defects of construction and to gain quality management. The following are the findings of the research. (1) The positive strengthening of supervision for the workers can contribute to prevent defects of apartment construction and make better quality of the construction. (2) A solution should be made for the poor of surface join and the damage of work element showing a lot in the apart construction, which prevent defects and improve construction quality. (3) Indirect factors such as negligence and carelessness of the management should be improved to advance construction quality, and the caution and control strengthening of the management should be followed. It is revealed that hitch, omission, and heedlessness come from the defects, and the shortage of skill and checking appear as indirect factors. Therefore, to get quality improvement, the enhancement of the management factors, employment of excellent workers, and enhancement of working attitude and construction management are needed.
The Reason of collapse accidents, Seongsu bridge Accident in 1994 and Sampung department store Accident in 1995 and so on, that is found out to the shortage construction. Consequently, depending on orderer's self-regulating judgement the meanwhile, Electricity Technique Administration Law in 1995 owes at the public opinion to need the plan of a law system device about the electricity design and supervision and is born. This various issue problem, the combined ordering with Constructing, Electricity, fire-fighting, Information & Communication and so on, field problem, low cost services, the problem about the selection procedure of the design and supervision businessman, the business range between general and specialized, which the system appears as are carried out have been risen. Therefore basic solution plan about this have been desired. We consider a domestic current situation about an electricity design supervision system in this paper, and try to present the plan for healthy upbringing development of the electricity industry through this.
For the introduction of the electricity of the special design and supervision system to Protect the faulty-workmanship of the electricity equipment and to reserve the electricity safety, last 1995 "Electricity Technology Management Act" were carried out enactment. March 2002, we introduced the pre-Qualification system that is selected the competent company about the electricity design and supervision service over so much capacity which is ordered by the Public institution such as the nation, local autonomous entity, government investment institute and so on. December 2005, the electricity equipment over so much capacity was taken the housing construction plan's approval by the housing act in case, the municipal or district governor with the authority to approve who selected the electricity supervision company according to the pre-Qualification system. Due to the introduction of the system, we could expect the rights and interests increase of the consumer by eradicating dumping of the close relationship between supervision company and the builder, reduction and concurrent position of the supervisor, according to confirm the quality of the electricity equipment and electricity safety. In spite of introducing of the system, the problems occured as reducing the electricity designer's task range compared with different field, modifing the supervisor's rank system rationally, because of researching about the electricity design and supervision technique lacks. Also, KEEA(Korea Electric Engineers Association) manage the caller of the electricity design and supervisor(company or people), but the problems occured as opening to the public about the curler management, introducing automatic bidding system and We need the solution plan about this. Consequently, we consider the present situation of the domestic and outside and problem about the electricity design and supervision system in this paper, try to present rational operation plan through this.
In this study, the legal and institutional status of construction supervising and construction inspector was identified. As a result of examining the definitions of construction supervision terms, focusing on domestic construction-related laws, it was found that there were no consistency between each laws regarding 'terminology' and 'definitions'. In addition, the scope of construction inspector's work continues to expand through the delegation provisions to lower statutes, however, responsibility, authority, and inspection cost are not taken into account properly. In addition in order to introduce digital technology to the smart construction site, which is currently active under way, it is judged that the law and institutional contents need to be improved further.
The 6th International Conference on Construction Engineering and Project Management
/
pp.415-419
/
2015
Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.