• Title/Summary/Keyword: concrete road

Search Result 1,003, Processing Time 0.027 seconds

A Study on Speeding Behavior Propensity Analysis by Theory of Planned Behavior (계획행동이론을 통한 과속운전 성향분석에 관한 연구)

  • Lee, Chang Hee;Kum, Ki Jung;Kim, Myung Soo
    • International Journal of Highway Engineering
    • /
    • v.17 no.5
    • /
    • pp.83-92
    • /
    • 2015
  • PURPOSES : Traffic accidents and damage due to speeding should be recognized as a problem which harms society and the economy as well as the parties to the accidents. It is time to seek more detailed and concrete customized alternatives than the existing policies for the prevention of traffic accidents. METHODS: In this study, we identified the characteristics driver behavior and psychological factors that lead to speeding, and a study was carried out to verify the causality models developed from the factors we identified. RESULTS : Driving behavior variables have a significant effect on speeding behaviors in order of Lapse, Violation, and Mistake. And the violation which is defined as intentional violation showed the result which supports the research hypothesis as it has the significant effect on speeding intention and behaviors. CONCLUSIONS: The result of this study can be utilized to develop educational problems concerning speeding and previous response with the main objective of eliminating speeding driver behavior.

Analysis of Texture Characteristics of Asphalt Pavements (아스팔트 포장의 노면조직 특성 분석)

  • Hong, Seong Jae;Lee, Seung Woo
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.1-6
    • /
    • 2017
  • PURPOSES : Pavement textures can be categorized into four according to wavelength: microtexture, macrotexture, megatexture (roads), and roughness. Pavement surface texture influences a number of aspects of tire-pavement interaction such as wet-weather friction, tire-pavement noise, splash, spray, tire-wear, and rolling resistance. In particular, macrotexture is the pavement surface characteristic that considerably impacts tire-pavement noise. In general, it can be demonstrated that tire-pavement noise increases with the increase of texture depth and wavelength. Recently, mean profile depth (MPD) and wavelength have been used to evaluate tire-pavement noise. This study aimed to identify the relationship between mean profile depth and average wavelength for asphalt pavement based on the information obtained on a number of asphalt pavement sections. METHODS : Profile data were collected from a number of expressway sections in Korea. In addition, mean profile depth and average wavelength were calculated by using this profile data. Statistical analysis was performed to determine the correlationship between mean profile depth and average wavelength. RESULTS:This study demonstrates a linear relationship between mean profile depth and average wavelength for asphalt concrete pavement. CONCLUSIONS :The strong relationship between mean profile depth and average wavelength of asphalt pavement was determined in this study.

A Study on legislation for Bimodal Tram Construction and Operation (바이모달 트램 도입을 위한 제도 개선 연구)

  • Min, Jae-Hong;Chung, Byung-Hyun;Shin, Hae-Mi
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1799-1804
    • /
    • 2009
  • Bimodal Tram is spotlighted for alternative public transportation system which have punctualness, efficiency, and convenience running between capacity of bus and light rail transit. It have the advantage of automatic operation system when it runs at exclusive right-of-way as like as railway, runs as same as a bus at road concurrently. However, concrete construction plan is not established since the law as well as government subsidy are not defined. For activating bimodal tram construction, this paper analyzed as below. 1) understanding obstacles of activating construction through current status of local governments' bimodal tram promotion plan, 2) finding essential elements for legislation through transportation mode characteristics comparison and system rules analysis, 3) related foreign law analysis.

  • PDF

초등수학 기하문제해결에서의 시각화 과정 분석

  • Yun, Yea-Joo;Kim, Sung-Joon
    • East Asian mathematical journal
    • /
    • v.26 no.4
    • /
    • pp.553-579
    • /
    • 2010
  • Geometric education emphasize reasoning ability and spatial sense through development of logical thinking and intuitions in space. Researches about space understanding go along with investigations of space perception ability which is composed of space relationship, space visualization, space direction etc. Especially space visualization is one of the factors which try conclusion with geometric problem solving. But studies about space visualization are limited to middle school geometric education, studies in elementary level haven't been done until now. Namely, discussions about elementary students' space visualization process and ability in plane or space figures is deficient in relation to geometric problem solving. This paper examines these aspects, especially in relation to plane and space problem solving in elementary levels. Firstly we propose the analysis frame to investigate a visualization process for plane problem solving and a visualization ability for space problem solving. Nextly we select 13 elementary students, and observe closely how a visualization process is progress and how a visualization ability is played role in geometric problem solving. Together with these analyses, we propose concrete examples of visualization ability which make a road to geometric problem solving. Through these analysis, this paper aims at deriving various discussions about visualization in geometric problem solving of the elementary mathematics.

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

Improved definition of dynamic load allowance factor for highway bridges

  • Zhou, Yongjun;Ma, Zhongguo John;Zhao, Yu;Shi, Xiongwei;He, Shuanhai
    • Structural Engineering and Mechanics
    • /
    • v.54 no.3
    • /
    • pp.561-577
    • /
    • 2015
  • The main objective of this paper is to study the dynamic load allowance (DLA) calculation methods for bridges according to the dynamic response curve. A simply-supported concrete bridge with a smooth road surface was taken as an example. A half-vehicle model was employed to calculate the dynamic response of deflection and bending moment in the mid-span section under different vehicle speeds using the vehicle-bridge coupling method. Firstly, DLAs from the conventional methods and code provisions were analyzed and critically evaluated. Then, two improved computing approaches for DLA were proposed. In the first approach, the maximum dynamic response and its corresponding static response or its corresponding minimum response were selected to calculate DLA. The second approach utilized weighted average method to take account of multi-local DLAs. Finally, the DLAs from two approaches were compared with those from other methods. The results show that DLAs obtained from the proposed approaches are greater than those from the conventional methods, which indicate that the current conventional methods underestimate the dynamic response of the structure. The authors recommend that the weighted average method based on experiments be used to compute DLAs because it can reflect the vehicle's whole impact on the bridge.

Seismic performance of a resilient low-damage base isolation system under combined vertical and horizontal excitations

  • Farsangi, Ehsan Noroozinejad;Tasnimi, Abbas Ali;Yang, T.Y.;Takewaki, Izuru;Mohammadhasani, Mohammad
    • Smart Structures and Systems
    • /
    • v.22 no.4
    • /
    • pp.383-397
    • /
    • 2018
  • Traditional base isolation systems focus on isolating the seismic response of a structure in the horizontal direction. However, in regions where the vertical earthquake excitation is significant (such as near-fault region), a traditional base-isolated building exhibits a significant vertical vibration. To eliminate this shortcoming, a rocking-isolated system named Telescopic Column (TC) is proposed in this paper. Detailed rocking and isolation mechanism of the TC system is presented. The seismic performance of the TC is compared with the traditional elastomeric bearing (EB) and friction pendulum (FP) base-isolated systems. A 4-storey reinforced concrete moment-resisting frame (RC-MRF) is selected as the reference superstructure. The seismic response of the reference superstructure in terms of column axial forces, base shears, floor accelerations, inter-storey drift ratios (IDR) and collapse margin ratios (CMRs) are evaluated using OpenSees. The results of the nonlinear dynamic analysis subjected to multi-directional earthquake excitations show that the superstructure equipped with the newly proposed TC is more resilient and exhibits a superior response with higher margin of safety against collapse when compared with the same superstructure with the traditional base-isolation (BI) system.

Asphalt Sealant Containing the Waste Lubricant Oil (폐윤활유를 이용한 아스팔트 실란트)

  • Kim, Seog-Jun;Ko, Kum-Jin
    • Elastomers and Composites
    • /
    • v.44 no.1
    • /
    • pp.69-75
    • /
    • 2009
  • Asphalt sealants for the crack repair of asphalt concrete road were prepared using waste lubricant oil in this work. The waste lubricant oil was compounded with asphalt(AP-5), SBS triblock copolymer, a tackifying agent(petroleum resin), and antioxidants. Cone penetration, softening point, ductility, elongation by tensile adhesion, and resilience of asphalt sealant compounds were measured. Cone penetration of asphalt sealant compounds increased with the increase of waste lubricant oil content while their softening point, ductility, and resilience decreased. By the addition of talc as an extender, softening point and resilience of asphalt sealants increased, but cone penetration, ductility, and elongation by tensile adhesion of those decreased with the proportion of talc content. The most economic asphalt sealant which could pass an ASTM specification could be manufactured by the big decrement of petroleum resin content.

150 W LED Streetlight Optimal Design Using 21 W LED Engine (21 W LED 엔진을 이용한 150 W급 가로등의 최적설계)

  • Shin, Wang-Soo;Lee, Seung-Min;Kim, Beom-Su;Park, Dae-Hee
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.29 no.1
    • /
    • pp.62-67
    • /
    • 2016
  • In this paper, the IES file was measured by applying a secondary optical lens to a 21 W LED engine, and the lighting calculation software RELUX was used to perform simulations with the data file of this measurement. For two-lane (two way) concrete paved roads, six LED engine are applied to each streetlight and simulation results show that Uo (uniformity) 0.56, UI (longitudinal uniformity) 0.86 and TI (threshold iIncrement) 9% which satisfies the required standards. RELUX was also used to LED streetlights by designing them in three dimensions, that is ${\pm}25%$ of the arm length of 2.8 m standardized by the road lighting standards of the Korea Expressway Corporation. Comparative analysis was carried out on adjustments were made in increments of 0.1 m that Uo, UI, and TI values in the range of arm lengths from 2.1 m~3.5 m. For the arm length range of 2.1 m~2.4 m, Uo was high, whereas UI was low. Therefore, we present the optimal light distribution values designed for an arm length of 2.5 m.

Case Study on Deciding a Time for Repairing Asphalt Pavement of Incheon International Airport (인천국제공항 아스팔트 포장 보수시기 결정 사례 연구)

  • Lee, Jae-Ho;Kim, Jang-Rack;Mun, Hyung-Chul;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.49-60
    • /
    • 2013
  • PURPOSES : The evaluation of the pavement condition of the asphalt concrete pavement of No. 2 runway of Inchon International Airport through PMS, a supporting system for making a decision of pavement, maintenance and repair, was made, and the proper time for repair according to the PCI reduction rate was suggested. METHODS : By comparing and analyzing the evaluation results of pavements built in 2009, 2010, 2011, PCI change in each facility (No. 2 runway, C parallel taxiway, connection taxiway) was calculated. By applying the calculated change to PCI deduction rate model, the pavement condition of the target sections was estimated, and then the necessary section and time for repair were chosen. RESULTS : After careful consideration of the time for pavement and maintenance, based on the result of PCI prediction, it was estimated that the southern takeoff and landing section of No. 2 runway was required to be repaired in 2012; connection taxiway in 2013; and C parallel taxiway in 2014; however, the section which is the main moving route of connection taxiway and C parallel taxiway was needed to be repaired in 2012. CONCLUSIONS : For maintenance and repair of airport pavements, the optimal alternative should be chosen by considering economics and operability, via examining the time for repair and the aspect of management all together on the basis of this study.