• 제목/요약/키워드: completion of work

검색결과 279건 처리시간 0.03초

이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템 (An Estimating System for the CO2 Emissions using Discrete Event Simulation)

  • 이창용;곽한성;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

지연된 국방 연구개발 프로젝트의 일정 예측방식 개선 연구 (Research on Improving Schedule Forecasting Method for Delayed Defense Research & Development Project)

  • 조정호;임재성
    • 한국군사과학기술학회지
    • /
    • 제23권3호
    • /
    • pp.286-293
    • /
    • 2020
  • Since Dr. Lipke announces earned schedule management(ESM) in 2002, it has been used in project management to make up for the insufficient schedule management function of earned value management technique. However, it is difficult to accurately forecast the schedule of delayed defense research and development(R&D) projects with the ESM technique. Therefore, this paper proposes a new schedule forecasting method considering the progress of delayed work in ESM technique. This concept can also be adopted to the traditional project progress management (PPM) technique. We verify the effectiveness of the proposed concept through several defense R&D projects and prove that it is possible to supplement the schedule forecasting of the ESM and PPM technique.

추가자원제약을 갖는 Job Shop 작업계획의 성능 비교 (A Comparison of Dispatching Rules for Auxiliary Resource Constrained Job Shop Scheduling)

  • 배상윤
    • 산업경영시스템학회지
    • /
    • 제28권1호
    • /
    • pp.140-146
    • /
    • 2005
  • This study presents the new dispatching rules of job shop scheduling with auxiliary resource constraint to improve the schedule performance measures related to completion time and due dates. The proposed dispatching rules consider the information of total work remaining and machine utilization to decrease mean flowtime and mean tardiness. The results of computer experiments show that those schedule performances are significantly improved by using the new dispatching rules. The results provide guidance for the researchers and practitioners of auxiliary resource constrained job shop scheduling to decrease mean flowtime and mean tardiness.

A Study on Coding Education for Non-Computer Majors Using Programming Error List

  • Jung, Hye-Wuk
    • International Journal of Advanced Culture Technology
    • /
    • 제9권1호
    • /
    • pp.203-209
    • /
    • 2021
  • When carrying out computer programming, the process of checking and correcting errors in the source code is essential work for the completion of the program. Non-computer majors who are learning programming for the first time receive feedback from instructors to correct errors that occur when writing the source code. However, in a learning environment where the time for the learner to practice alone is long, such as an online learning environment, the learner starts to feel many difficulties in solving program errors by himself/herself. Therefore, training on how to check and correct errors after writing the program source code is necessary. In this paper, various types of errors that can occur in a Python program were described, the errors were classified into simple errors and complex errors according to the characteristics of the errors, and the distributions of errors by Python grammar category were analyzed. In addition, a coding learning process to refer error lists was designed to present a coding learning method that enables learners to solve program errors by themselves.

An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong
    • 한국소프트웨어감정평가학회 논문지
    • /
    • 제16권1호
    • /
    • pp.21-26
    • /
    • 2020
  • The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

Proteomic Studies in Plants

  • Park, Ohk-Mae K.
    • BMB Reports
    • /
    • 제37권1호
    • /
    • pp.133-138
    • /
    • 2004
  • Proteomics is a leading technology for the high-throughput analysis of proteins on a genome-wide scale. With the completion of genome sequencing projects and the development of analytical methods for protein characterization, proteomics has become a major field of functional genomics. The initial objective of proteomics was the large-scale identification of all protein species in a cell or tissue. The applications are currently being extended to analyze various functional aspects of proteins such as post-translational modifications, protein-protein interactions, activities and structures. Whereas the proteomics research is quite advanced in animals and yeast as well as Escherichia coli, plant proteomics is only at the initial phase. Major studies of plant proteomics have been reported on subcellular proteomes and protein complexes (e.g. proteins in the plasma membranes, chloroplasts, mitochondria and nuclei). Here several plant proteomics studies will be presented, followed by a recent work using multidimensional protein identification technology (MudPIT).

감성 전달을 위한 UCC 동영상 편집 방안에 관한 연구 (A Study on UCC Video Editing for Sensibility Delivery)

  • 김기범;김경수
    • 디지털콘텐츠학회 논문지
    • /
    • 제12권4호
    • /
    • pp.449-456
    • /
    • 2011
  • UCC(User Created Contents) 동영상은 온라인상에서 사용자가 상업적인 의도없이 제작한 '감성 전달' 매체로서 최근 인터넷 대중문화의 핵심 콘텐츠로 급부상하였다. '감성 전달'은 UCC 동영상의 궁극적인 목적으로 '기 승 전 결'의 스토리텔링(Storytelling)이 뒷받침되어야 가능하다. 그러나 비상업적인 UCC 동영상은 불안정한 제작 환경, 다양한 변수들로 인하여 완성도 높은 작품을 기대하기 어렵다. 따라서 본 논문에서는 불안정한 UCC 동영상의 문제점을 최소화하기 위해 편집 단계에서 '세부적인 스토리텔링 편집' 과정을 제안하였다. 연구자의 실무 결과물과 UCC 동영상 공모전 수상작품을 토대로 연구한 이 제안은 공감대를 키우고, 창의적인 변화를 유도하며, 통일성있는 마무리 편집으로 작품의 완성도를 높임으로서 '감성 전달'의 기능을 확대할 수 있다.

한국 건설 산업 생산성의 국제경쟁력 분석 (An Analysis of the International Competitiveness of Productivity in the Korean Construction Industry)

  • 원종성;이강
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.75-83
    • /
    • 2008
  • 2003년 이전 국내 건설 국제경쟁력 비교연구에서 우리나라 건설 생산성이 미국, 영국, 일본 등의 선진국에 비하여 낮은 것으로 보고되었다. 그러나 2003년 이후 우리나라 해외 건설수주 물량도 매년 크게 늘고 있으며, Petronas Tower, Burj Dubai와 같은 세계 최고층 건물을 수주, 건설하는 등 양적 질적으로 괄목할 만한 발전을 이루고 있다. 이 시점에서 우리나라 건설생산성의 현주소를 재평가할 필요성이 있다. 본 연구에서는 우리나라와 해외선진국과의 건설생산성을 비교하여 우리나라 건설산업의 국제경쟁력을 평가하고자 한다. 국내 통계자료와 외국 통계자료를 바탕으로 노동자 1인 기준 단위시간동안 생산하는 총 공사액을 분석하여 각 국의 건설노동생산성을 측정하고 한국과 일본의 완공된 건축물을 대상으로 층당 소요되는 공사일수와 건축물의 지하층비율을 분석하여 시공경쟁력을 평가하였다. 분석결과, 우리나라의 건설생산성이 아직 건설 선진국인 미국이나 일본보다는 뒤쳐져 있으나 영국보다는 앞서는 것으로 분석되었다.

반복적인 작동을 위한 형상기억합금의 특성 실험과 거동 전산 모사 (Experimental Test and Numerical Simulation on the SMA Characteristics and Behaviors for Repeated Actuations)

  • 김상헌;조맹효
    • 대한기계학회논문집A
    • /
    • 제31권3호
    • /
    • pp.373-379
    • /
    • 2007
  • In this study, we observe the application of shape memory alloy(SMA) into smart structures for repeatable actuation, because SMA changes its material properties and characteristics progressively under cyclic loading conditions and finally reaches stable path(state) after a certain number of stress/temperature loading-unloading cycles, so called 'training'. In this paper, SMA wires that have been in a stable state through the training are used. Stress-strain curve of the SMA wire at different temperature levels are measured. In addition, we observe other important effects such as the rate effect according to strain rates for rapid actuation response. The current work presents the experimental test using SMA wire after training completion by mechanical cycling. Through these tests, we measure the characteristics of SMA. With the estimated SMA properties and effects, we compare the experimental results with the simulation results based on the SMA constitutive equations.