• Title/Summary/Keyword: commissioning process

Search Result 50, Processing Time 0.023 seconds

Continuous Commissioning Process and Application (Continuous Commissioning의 절차와 적용)

  • Cho, Young-Hum
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.5
    • /
    • pp.77-84
    • /
    • 2010
  • This paper presents the continuous commissioning process, information on the case study facility, improved system operation, and building energy consumption measures before and after continuous commissioning implementation. Continuous commissioning is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. Continuous commissioning process consists of two phases. The first phase is the project development phase and the second phase implements and verifies project performance. Results of a case study show that continuous commissioning implementation can reduce energy costs. The energy reports show the electricity savings of 22% and gas savings of 47% on an average.

Bayesian Theorem-based Prediction of Success in Building Commissioning

  • Park, Borinara
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.523-526
    • /
    • 2015
  • In recent years, building commissioning has often been part of a standard delivery practice in construction, particularly in the high-performance green building market, to ensure the building is designed and constructed per owner's requirements. Commissioning, therefore, intends to provide quality assurance that buildings perform as intended by the design and often helps achieve energy savings. Commissioning, however, is not as widely adopted as its potential benefits are perceived. Owners are still skeptical of the cost-effectiveness claims by energy management and commissioning professionals. One of the issues in the current commissioning practice is that not every project is guaranteed to benefit from the commissioning services. This, coupled with its added cost, the commissioning service is not acquired with great acceptance and confidence by building owners. To overcome this issue, this paper presents a unique methodology to enhance owner's predicting capability of the degree of success of commissioning service using the Bayesian theorem. The paper analyzes a situation where a future building owner wants to use a pre-commissioning in an attempt to refine the success rate of the future commissioned building performance. The author proposes the Bayesian theorem based framework to improve the current commissioning practice where building owners are not given accurate information how much successful their projects are going to be in terms of energy savings from the commissioning service. What should be provided to the building owners who consider their buildings to be commissioned is that they need some indicators how likely their projects benefit from the commissioning process. Based on this, the owners can make better informed decisions whether or not they acquire a commissioning service.

  • PDF

The Feasibility Study on the Monte Carlo Based RTP Commissioning

  • Kang, Sei-Kwon;Cho, Byung-Chul;Park, Suk-Won;Oh, Do-Hoon;Park, Hee-Chul;Bae, Hoon-Sik
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2004.11a
    • /
    • pp.43-46
    • /
    • 2004
  • The commissioning of a treatment planning system of model-based dose calculation algorithm requires a lot of parameters to be selected to fit measured data, in which process physical insights for the parameters are often forgotten. We present the photon beam commissioning of Pinnacle$^3$ with the help of Monte Carlo (MC) simulation and evaluate the parameters Pinnacle$^3$ demands. Even though the MC calculation produces reasonable values for the commissioning, the thorough physical basis of the Pinnacles$^3$'s commissioning process is needed to use the MC derived parameters directly.

  • PDF

Building Commissioning Management Framework from the Case Study of Green Building (녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출)

  • Jeong, Jin-Hak;Park, So-Yeon;Song, Dong-Hun;Ahn, Yong-Han
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.8
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

Monitoring-Based Building Energy Commissioning Technology (모니터링 기반 건물 에너지 커미셔닝 기술)

  • Lee, Sang-hak
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.7
    • /
    • pp.765-767
    • /
    • 2016
  • Building Energy commissioning is a process in which verifying and making the document during entire lifetime including planning, design, construction, test run of equipment, and maintenance to minimize the operational problems of building energy efficiency. The general commissioning is replacing the equipment or reconstructing the skin to achieve the performance for the design. This process is expensive and has the disadvantage of taking a long payback period by one operation. In this paper, we studied the monitoring-based commissioning (MBCx) to increase the energy efficiency of buildings through analyzing energy use data. MBCx is modeling a building energy, comparing the real energy use with it, detecting the cause of falling the efficiency, and running the optimal operation regularly.

A Study on Building Integrated Design and Commissioning of GHP System (지열히트펌프 시스템의 건물통합설계 및 커미셔닝에 관한 연구)

  • Kim, Ji-Young;Jang, Jea-Chul;Kang, Eun-Chul;Chang, Ki-Chang;Lee, Euy-Joon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.169.1-169.1
    • /
    • 2010
  • Geothermal heat pump(GHP)system has been extensively disseminated due to the recent increasing demand over new and renewable energy. However, the economics and system reliability has been key issues and barriers to insure a better system performance as designed originally. The building integrated designs of geothermal heat pump system are test and optimize GHP system by evaluating its performance in virtual reality. System design is an iterative process that will help optimize the cost efficiency of the system. One of the primary goals is to minimize the energy imbalance between the amount of energy extracted from the ground and the energy reject to it. This will reduce the land area required to install the GHX, reduce the cost of installing it and ensure the long-term efficiency of the system. Commissioning is the process of ensuring that are designed, installed, functionally tested, and capable of being operated and maintained to performance in conformity with design intent. In this paper, Study on introduction of Initial commissioning method of Geothermal Heat Pump(GHP) system using ISO performance data has been introduced. Also KIER GHP Simulator is used to simulate actual heat pimp operating condition and test commissioning method. Result should that the experiment data base could verify the applicability of the commissioning method, and also were able to suggest a better ways to GHP commissioning.

  • PDF

A Comparative Study on Domestic and International Evaluation Criteria of Commissioning for Sustainable Building Certification (국내외 녹색건축인증에서의 커미셔닝 평가기준에 대한 비교 연구)

  • Jeong, Dahun;Jung, Chanwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.27-36
    • /
    • 2017
  • Ministry of Land, Infrastructure and Transport established Heating and cooling energy conservation plan of apartment for 2017, reducing 90% compared to energy consumption of 1990. Also, at 2015 United Nations Climate Change Conference, the Ministry announced to reduce 37% of estimated $CO^2$ emission(850 million ton) at 2030. To satisfy this, it is urgent to reduce $CO^2$ emission due to the building, which takes majority amount of total $CO^2$ emission, and public interest for the commissioning of intensified building performance is uprising. However, the building commissioning at construction is not enacted, and not activated due to the lackness of promotion and will of general contractor. Furthermore, commissioning is not mandatory for obtaining G-SEED certification. Therefore, this paper describes effectiveness of commissioning with comparison of commissioning evaluation criteria of G-SEED with LEED and BREEAM, to propose making commissioning as mandatory process and drive changes in perception among stakeholders for activation of domestic building commissioning.

Guideline on Acceptance Test and Commissioning of High-Precision External Radiation Therapy Equipment

  • Kim, Juhye;Shin, Dong Oh;Choi, Sang Hyoun;Min, Soonki;Kwon, Nahye;Jung, Unjung;Kim, Dong Wook
    • Progress in Medical Physics
    • /
    • v.29 no.4
    • /
    • pp.123-136
    • /
    • 2018
  • The complex dose distribution and dose transfer characteristics of intensity-modulated radiotherapy increase the importance of precise beam data measurement and review in the acceptance inspection and preparation stages. In this study, we propose a process map for the introduction and installation of high-precision radiotherapy devices and present items and guidelines for risk management at the acceptance test procedure (ATP) and commissioning stages. Based on the ATP of the Varian and Elekta linear accelerators, the ATP items were checked step by step and compared with the quality assurance (QA) test items of the AAPM TG-142 described for the medical accelerator QA. Based on the commissioning procedure, dose quality control protocol, and mechanical quality control protocol presented at international conferences, step-by-step check items and commissioning guidelines were derived. The risk management items at each stage were (1) 21 ionization chamber performance test items and 9 electrometer, cable, and connector inspection items related to the dosimetry system; (2) 34 mechanical and dose-checking items during ATP, 22 multileaf collimator (MLC) items, and 36 imaging system items; and (3) 28 items in the measurement preparation stage and 32 items in the measurement stage after commissioning. Because the items presented in these guidelines are limited in terms of special treatment, items and practitioners can be modified to reflect the clinical needs of the institution. During the system installation, it is recommended that at least two clinically qualified medical physicists (CQMP) perform a double check in compliance with the two-person rule. We expect that this result will be useful as a radiation safety management tool that can prevent radiation accidents at each stage during the introduction of radiotherapy and the system installation process.

Commissioning and Validation of a Dedicated Scanning Nozzle at Samsung Proton Therapy Center

  • Chung, Kwangzoo;Han, Younyih;Ahn, Sung Hwan;Kim, Jin Sung;Nonaka, Hideki
    • Progress in Medical Physics
    • /
    • v.27 no.4
    • /
    • pp.267-271
    • /
    • 2016
  • In this study, we present the commissioning and validation results of a dedicated scanning nozzle. The dedicated scanning nozzle is installed in one of the two gantry treatment rooms at Samsung Proton Therapy Center. Following a successful completion of the acceptance test, the commissioning process including the beam data measurement for treatment planning system has been conducted. Extended measurements have been conducted as a validation of the clinical performance of the nozzle and various quality assurance protocols have been prepared.

CONSTRUCTION, ASSEMBLY AND COMMISSIONING OF KSTAR MAIN STRUCTURES

  • Yang, Hyung-Lyeol;Bak, Joo-Shik;Kim, Byung-Chul;Choi, Chang-Ho;Kim, Woong-Chae;Her, Nam-Il;Hong, Kwon-Hee;Kim, Geung-Hong;Kim, Hak-Kun;Sa, Jeong-Woo;Kim, Hong-Tack;Kim, Kyung-Min;Kim, Sang-Tae
    • Nuclear Engineering and Technology
    • /
    • v.40 no.6
    • /
    • pp.439-450
    • /
    • 2008
  • The KSTAR device succeeded in first plasma generation on $13^{th}$ June of 2008 through comprehensive system test and commissioning. Among various kinds of the key factors that decisively affected the project, success in the construction and assembly of the major tokamak structure was most important one. Every engineering aspects of each structure were finally confirmed in the integrated commissioning period, and there were no severe troubles and failures prevented the KSTAR device from operating during the commissioning and the first plasma experiments. As a result, all of the experiences and technologies achieved through the KSTAR construction process are expected to be important fundamentals for future construction projects of superconducting fusion devices. This paper summarizes key engineering features of the major structures and of the machine assembly.