Continuous Commissioning의 절차와 적용 (Continuous Commissioning Process and Application)

  • 조영흠
    • 한국태양에너지학회 논문집
    • /
    • 제30권5호
    • /
    • pp.77-84
    • /
    • 2010
  • This paper presents the continuous commissioning process, information on the case study facility, improved system operation, and building energy consumption measures before and after continuous commissioning implementation. Continuous commissioning is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. Continuous commissioning process consists of two phases. The first phase is the project development phase and the second phase implements and verifies project performance. Results of a case study show that continuous commissioning implementation can reduce energy costs. The energy reports show the electricity savings of 22% and gas savings of 47% on an average.

Bayesian Theorem-based Prediction of Success in Building Commissioning

  • Park, Borinara
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.523-526
    • /
    • 2015
  • In recent years, building commissioning has often been part of a standard delivery practice in construction, particularly in the high-performance green building market, to ensure the building is designed and constructed per owner's requirements. Commissioning, therefore, intends to provide quality assurance that buildings perform as intended by the design and often helps achieve energy savings. Commissioning, however, is not as widely adopted as its potential benefits are perceived. Owners are still skeptical of the cost-effectiveness claims by energy management and commissioning professionals. One of the issues in the current commissioning practice is that not every project is guaranteed to benefit from the commissioning services. This, coupled with its added cost, the commissioning service is not acquired with great acceptance and confidence by building owners. To overcome this issue, this paper presents a unique methodology to enhance owner's predicting capability of the degree of success of commissioning service using the Bayesian theorem. The paper analyzes a situation where a future building owner wants to use a pre-commissioning in an attempt to refine the success rate of the future commissioned building performance. The author proposes the Bayesian theorem based framework to improve the current commissioning practice where building owners are not given accurate information how much successful their projects are going to be in terms of energy savings from the commissioning service. What should be provided to the building owners who consider their buildings to be commissioned is that they need some indicators how likely their projects benefit from the commissioning process. Based on this, the owners can make better informed decisions whether or not they acquire a commissioning service.

  • PDF

The Feasibility Study on the Monte Carlo Based RTP Commissioning

  • Kang, Sei-Kwon;Cho, Byung-Chul;Park, Suk-Won;Oh, Do-Hoon;Park, Hee-Chul;Bae, Hoon-Sik
    • 한국의학물리학회:학술대회논문집
    • /
    • 한국의학물리학회 2004년도 제29회 추계학술대회 발표논문집
    • /
    • pp.43-46
    • /
    • 2004
  • The commissioning of a treatment planning system of model-based dose calculation algorithm requires a lot of parameters to be selected to fit measured data, in which process physical insights for the parameters are often forgotten. We present the photon beam commissioning of Pinnacle$^3$ with the help of Monte Carlo (MC) simulation and evaluate the parameters Pinnacle$^3$ demands. Even though the MC calculation produces reasonable values for the commissioning, the thorough physical basis of the Pinnacles$^3$'s commissioning process is needed to use the MC derived parameters directly.

  • PDF

녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출 (Building Commissioning Management Framework from the Case Study of Green Building)

  • 정진학;박소연;송동훈;안용한
    • 대한건축학회논문집:계획계
    • /
    • 제34권8호
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

모니터링 기반 건물 에너지 커미셔닝 기술 (Monitoring-Based Building Energy Commissioning Technology)

  • 이상학
    • 한국통신학회논문지
    • /
    • 제41권7호
    • /
    • pp.765-767
    • /
    • 2016
  • 건물 에너지 커미셔닝은 건축물의 계획, 설계, 시공, 시공 후 설비의 시운전 및 유지 관리를 포함한 전 공정을 효율적으로 검증하고 문서화하여 에너지의 낭비 및 운영상의 문제점을 최소화하는 공정 기술이다. 일반적인 커미셔닝은 설계 기준에 적합한 성능을 발휘할 수 있도록 설비의 교체를 추진한다. 이는 비용이 많이 들며 투자비 회수기간이 오래 걸리는 단점을 지니고 있다. 본 논문에서는 ICT(Information Communication Technology)를 기반으로 에너지 사용 데이터 분석을 통해 설비 교체를 최소화하며 최적 운용을 통해 에너지 효율을 높이는 모니터링 기반 커미셔닝에 대해 연구하였다. 건물 에너지 사용에 대한 모델링을 수행하고 이를 기반으로 에너지 사용 데이터와 비교, 효율 저하 감지 기술을 활용하여 운용 최적화를 통한 에너지 사용 절감을 이룬다.

지열히트펌프 시스템의 건물통합설계 및 커미셔닝에 관한 연구 (A Study on Building Integrated Design and Commissioning of GHP System)

  • 김지영;장재철;강은철;장기창;이의준
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.169.1-169.1
    • /
    • 2010
  • Geothermal heat pump(GHP)system has been extensively disseminated due to the recent increasing demand over new and renewable energy. However, the economics and system reliability has been key issues and barriers to insure a better system performance as designed originally. The building integrated designs of geothermal heat pump system are test and optimize GHP system by evaluating its performance in virtual reality. System design is an iterative process that will help optimize the cost efficiency of the system. One of the primary goals is to minimize the energy imbalance between the amount of energy extracted from the ground and the energy reject to it. This will reduce the land area required to install the GHX, reduce the cost of installing it and ensure the long-term efficiency of the system. Commissioning is the process of ensuring that are designed, installed, functionally tested, and capable of being operated and maintained to performance in conformity with design intent. In this paper, Study on introduction of Initial commissioning method of Geothermal Heat Pump(GHP) system using ISO performance data has been introduced. Also KIER GHP Simulator is used to simulate actual heat pimp operating condition and test commissioning method. Result should that the experiment data base could verify the applicability of the commissioning method, and also were able to suggest a better ways to GHP commissioning.

  • PDF

국내외 녹색건축인증에서의 커미셔닝 평가기준에 대한 비교 연구 (A Comparative Study on Domestic and International Evaluation Criteria of Commissioning for Sustainable Building Certification)

  • 정다훈;정찬우
    • 한국건설관리학회논문집
    • /
    • 제18권1호
    • /
    • pp.27-36
    • /
    • 2017
  • 국토교통부는 녹색건축물 조성을 촉진하기 위해 '17년 공동주택은 냉,난방 에너지 90%('90년 대비) 절감 목표를 수립하였으며, 2015년 UN 기후변화회의(2015 United Nations Climate Change Conference)에서 당국은 2030년 배출전망 (BAU)인 8억 5060만 ton $CO^2$ 대비 37%를 감축하겠다고 발표하였다. 이를 만족하기 위해서는 가장 많은 탄소 발생을 야기하는 건축물에서 탄소배출 최소화를 위한 조치가 시급하며, 이에 건물 사용 시 발생하는 탄소배출 감축을 위해 필요한 건물 성능 강화를 유도하는 커미셔닝에 대한 관심이 높아지고 있다. 그러나 현재 건설업계에서 커미셔닝은 법제화되어 있지 않고 건설 참여자의 수행의지 및 효과 홍보 부족으로 인해 활성화 되어있지 않다. 또한, 녹색건축으로의 인증을 획득하는 과정에서 조차 커미셔닝은 필수 수행 항목으로 지정되어 있지 않아 국내 커미셔닝은 그 효과 대비 저평가 받고 있는 실정이다. 이에, 본 연구에서는 커미셔닝의 효과에 대해 기술하고, 해외 녹색건축인증 LEED, BREEAM을 기준으로 커미셔닝이 녹색건축에 있어서 어떻게 평가받고 있는지 국내 G-SEED와 비교, 분석하여 국내 녹색건축인증에서의 커미셔닝 필수화를 제안하고 나아가 커미셔닝이 국내에서 활성화 될 수 있도록 건설 주체자의 인식 변화를 유도하고자 한다.

Guideline on Acceptance Test and Commissioning of High-Precision External Radiation Therapy Equipment

  • Kim, Juhye;Shin, Dong Oh;Choi, Sang Hyoun;Min, Soonki;Kwon, Nahye;Jung, Unjung;Kim, Dong Wook
    • 한국의학물리학회지:의학물리
    • /
    • 제29권4호
    • /
    • pp.123-136
    • /
    • 2018
  • The complex dose distribution and dose transfer characteristics of intensity-modulated radiotherapy increase the importance of precise beam data measurement and review in the acceptance inspection and preparation stages. In this study, we propose a process map for the introduction and installation of high-precision radiotherapy devices and present items and guidelines for risk management at the acceptance test procedure (ATP) and commissioning stages. Based on the ATP of the Varian and Elekta linear accelerators, the ATP items were checked step by step and compared with the quality assurance (QA) test items of the AAPM TG-142 described for the medical accelerator QA. Based on the commissioning procedure, dose quality control protocol, and mechanical quality control protocol presented at international conferences, step-by-step check items and commissioning guidelines were derived. The risk management items at each stage were (1) 21 ionization chamber performance test items and 9 electrometer, cable, and connector inspection items related to the dosimetry system; (2) 34 mechanical and dose-checking items during ATP, 22 multileaf collimator (MLC) items, and 36 imaging system items; and (3) 28 items in the measurement preparation stage and 32 items in the measurement stage after commissioning. Because the items presented in these guidelines are limited in terms of special treatment, items and practitioners can be modified to reflect the clinical needs of the institution. During the system installation, it is recommended that at least two clinically qualified medical physicists (CQMP) perform a double check in compliance with the two-person rule. We expect that this result will be useful as a radiation safety management tool that can prevent radiation accidents at each stage during the introduction of radiotherapy and the system installation process.

Commissioning and Validation of a Dedicated Scanning Nozzle at Samsung Proton Therapy Center

  • Chung, Kwangzoo;Han, Younyih;Ahn, Sung Hwan;Kim, Jin Sung;Nonaka, Hideki
    • 한국의학물리학회지:의학물리
    • /
    • 제27권4호
    • /
    • pp.267-271
    • /
    • 2016
  • In this study, we present the commissioning and validation results of a dedicated scanning nozzle. The dedicated scanning nozzle is installed in one of the two gantry treatment rooms at Samsung Proton Therapy Center. Following a successful completion of the acceptance test, the commissioning process including the beam data measurement for treatment planning system has been conducted. Extended measurements have been conducted as a validation of the clinical performance of the nozzle and various quality assurance protocols have been prepared.

CONSTRUCTION, ASSEMBLY AND COMMISSIONING OF KSTAR MAIN STRUCTURES

  • Yang, Hyung-Lyeol;Bak, Joo-Shik;Kim, Byung-Chul;Choi, Chang-Ho;Kim, Woong-Chae;Her, Nam-Il;Hong, Kwon-Hee;Kim, Geung-Hong;Kim, Hak-Kun;Sa, Jeong-Woo;Kim, Hong-Tack;Kim, Kyung-Min;Kim, Sang-Tae
    • Nuclear Engineering and Technology
    • /
    • 제40권6호
    • /
    • pp.439-450
    • /
    • 2008
  • The KSTAR device succeeded in first plasma generation on $13^{th}$ June of 2008 through comprehensive system test and commissioning. Among various kinds of the key factors that decisively affected the project, success in the construction and assembly of the major tokamak structure was most important one. Every engineering aspects of each structure were finally confirmed in the integrated commissioning period, and there were no severe troubles and failures prevented the KSTAR device from operating during the commissioning and the first plasma experiments. As a result, all of the experiences and technologies achieved through the KSTAR construction process are expected to be important fundamentals for future construction projects of superconducting fusion devices. This paper summarizes key engineering features of the major structures and of the machine assembly.