• Title/Summary/Keyword: collapse risk

Search Result 238, Processing Time 0.021 seconds

Analysis of Priority Investments for Preventing Roadside Slope Failures (도로비탈면 투자우선순위 결정에 관한 연구)

  • Kim, Seung-Hyun;Kim, Hong-Gyun;Oak, Young-Suk;Lee, Jong-Hyun;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.257-269
    • /
    • 2013
  • Prevention plans for landslide and slope disasters should be appropriate for a country's budget when considering a systematic investment plan. The systematic management of slopes adjacent to national highways should incorporate reasonable investment risk and the expected degree of damage should be calculated by considering the investment priorities. In terms of priority of investment, the major factors used to determine the degree of hazard are gradient, soil characteristics, RMR (Rock Mass Rating), stability interpretation, type of discontinuities, and history of collapse, among others. The likely consequences of slope failure can be determined by considering traffic volume, the number of lanes, and average vehicle risk. We performed such calculations regarding the priority of investment and performed a regression analysis for 392 slopes located in Yeongseo region, Gangwon province. The calculation results show that collapsed slopes have a higher priority for investment, as do slopes with a high proportion of dangerous sections and locations in valleys.

Seismic Fragility Analysis of Base Isolated NPP Piping Systems (지진격리된 원전배관의 지진취약도 분석)

  • Jeon, Bub Gyu;Choi, Hyoung Suk;Hahm, Dae Gi;Kim, Nam Sik
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.19 no.1
    • /
    • pp.29-36
    • /
    • 2015
  • Base isolation is considered as a seismic protective system in the design of next generation Nuclear Power Plants (NPPs). If seismic isolation devices are installed in nuclear power plants then the safety under a seismic load of the power plant may be improved. However, with respect to some equipment, seismic risk may increase because displacement may become greater than before the installation of a seismic isolation device. Therefore, it is estimated to be necessary to select equipment in which the seismic risk increases due to an increase in the displacement by the installation of a seismic isolation device, and to perform research on the seismic performance of each piece of equipment. In this study, modified NRC-BNL benchmark models were used for seismic analysis. The numerical models include representations of isolation devices. In order to validate the numerical piping system model and to define the failure mode, a quasi-static loading test was conducted on the piping components before the analysis procedures. The fragility analysis was performed by using the results of the inelastic seismic response analysis. Inelastic seismic response analysis was carried out by using the shell finite element model of a piping system considering internal pressure. The implicit method was used for the direct integration time history analysis. In addition, the collapse load point was used for the failure mode for the fragility analysis.

Analysis of Flood Control Capacity of Agricultural Reservoir Based on SSP Climate Change Scenario (SSP 기후변화 시나리오에 따른 농업용 저수지 홍수조절능력 분석)

  • Kim, Jihye;Kwak, Jihye;Hwang, Soonho;Jun, Sang Min;Lee, Sunghack;Lee, Jae Nam;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.5
    • /
    • pp.49-62
    • /
    • 2021
  • The objective of this study was to evaluate the flood control capacity of the agricultural reservoir based on state-of-the-art climate change scenario - SSP (Shared Socioeconomic Pathways). 18 agricultural reservoirs were selected as the study sites, and future rainfall data based on SSP scenario provided by CMIP6 (Coupled Model Intercomparison Project 6) was applied to analyze the impact of climate change. The frequency analysis module, the rainfall-runoff module, the reservoir operation module, and their linkage system were built and applied to simulate probable rainfall, maximum inflow, maximum outflow, and maximum water level of the reservoirs. And the maximum values were compared with the design values, such as design flood of reservoirs, design flood of direct downstream, and top of dam elevation, respectively. According to whether or not the maximum values exceed each design value, cases were divided into eight categories; I-O-H, I-O, I-H, I, O-H, O, H, X. Probable rainfall (200-yr frequency, 12-h duration) for observed data (1973~2020) was a maximum of 445.2 mm and increased to 619.1~1,359.7 mm in the future (2011~2100). For the present, 61.1% of the reservoirs corresponded to I-O, which means the reservoirs have sufficient capacity to discharge large inflow; however, there is a risk of overflowing downstream due to excessive outflow. For the future, six reservoirs (Idong, Baekgok, Yedang, Tapjung, Naju, Jangsung) were changed from I-O to I-O-H, which means inflow increases beyond the discharge capacity due to climate change, and there is a risk of collapse due to dam overflow.

Development of Levee Safety Revaluation for Satellite Images (위성 이미지를 활용한 제방 안정성 평가 기법 개발)

  • Bang, Young Jun;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.1-14
    • /
    • 2022
  • Recently, the risk of water disasters are increasing due to climate change and the aging of river levees. Existing conventional river embankment inspections have many limitations due to the consumption of a lot of manpower and budget. Thus, it is necessary to establish a new monitoring and forecast/warning method for effective flood response. This study proposes the river levee health monitoring system by analyzing the relationship between river levee deformation and hydrological factors using Sentinel-1. The variance index calculated in this study was classified into 4 grades. And the levees collapse section was judged to be a high vulnerable point in which the variance rapidly increased based on the result of the rapid increase in soil moisture. In the future, it is expected that it will be possible to advance levee maintenance technology and improve national disaster management through the advancement of the existing levee management system and automated monitoring through the forensic method that combines remote technology.

Research on Artificial Intelligence Based Shipping Container Loading Safety Management System (인공지능 기반 컨테이너 적재 안전관리 시스템 연구)

  • Kim Sang Woo;Oh Se Yeong;Seo Yong Uk;Yeon Jeong Hum;Cho Hee Jeong;Youn Joosang
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.12 no.9
    • /
    • pp.273-282
    • /
    • 2023
  • Recently, various technologies such as logistics automation and port operations automation with ICT technology are being developed to build smart ports. However, there is a lack of technology development for port safety and safety accident prevention. This paper proposes an AI-based shipping container loading safety management system for the prevention of safety accidents at container loading fields in ports. The system consists of an AI-based shipping container safety accident risk classification and storage function and a real-time safety accident monitoring function. The system monitors the accident risk at the site in real-time and can prevent container collapse accidents. The proposed system is developed as a prototype, and the system is ecaluated by direct application in a port.

Risk Factors for Recurrent Pneumothorax after Primary Spontaneous Pneumothorax (원발 기흉 수술 후 재발의 위험인자)

  • Yu, Jai-Kun;Lee, Seong-Ki;Seo, Hong-Joo;Seo, Min-Bum
    • Journal of Chest Surgery
    • /
    • v.41 no.6
    • /
    • pp.724-728
    • /
    • 2008
  • Background: The purpose of this study was to identify factors associated with recurrent pneumothorax after wedge resection in primary spontaneous pneumothorax in our hospital. Material and Method: Two hundred thirty-five consecutive patient (98% males; mean age, $23.9{\pm}4.5$ years) who had undergone video-assisted thoracoscopic surgery (VATS) were reviewed retrospectively. The two groups were divided as follows: group A, non-recurrent patients (225 patients [96%]); and group B, recurrent group (10 patients [4%]); the risk factors were compared between the two groups. The single and multiple factors that influenced the recurrence rate were analyzed using Cox's proportional hazard model. Result: There were no significant differences between the recurrent and non-recurrent groups in terms of gender, smoking, site of recurrence, degree of collapse, operative time, and number or weight of resected bullae. The recurrence rate was significantly more common in the following: younger ages, increased height/weight ratio, longer initial air leakage period, and shorter duration of chest drainage. Early aggressive exercise (<30 days) of patients after wedge resection increased the tendency for recurrence. Conclusion: Thoracoscopic wedge resection does not have a higher recurrence rate than open thoracotomy. However, young age, height/weight ratio, continuous air, and duration of chest tube placement were risk factors for a recurrent pneumothorax.

Variation of Landslide Risk with Parameters (매개변수에 따른 산사태 위험도의 변화)

  • Lee, Jundae;Kwon, Youngcheul;Bae, Wooseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.1
    • /
    • pp.15-23
    • /
    • 2018
  • In this study we performed risk evaluation based on parameters using the SINMAP, GIS-based extended program in order to predict ground disaster that is frequent recently. As for the risk evaluation, in order to understand the effects of parameters, we defined that the ranges of internal friction angles and T/R values as important variables had three and four patterns, respectively. The results of the interpretation were compared with those of the existing landslide in order to identify landslide flow and to evaluate the applicability of the parameters. The analysis of the geomorphologic saturated zone showed that the boundary saturated zone and the saturated zone were almost consistent with the site of avalanche of earth and rocks and the area of underground water convergence was correlated to the area where collapse started, indicating that the geomorphologic saturated zone may serve as an index for estimating possibility of landslide when used with slope distribution, colluvial soil, and structures inducing landslide in combination. When the lower limit of the internal friction angle increased more, the upper threshold decreased by 50 to 70% and the influence on the stability index was higher, but the influence was declined within the range of lower wetness index. The analysis of changes based on wetness index range showed that all the groups have similar SI distribution, except for the one in which mean altitude values are applied, indicating that the results are susceptible more by the internal friction angle than by the wetness index.

Risk-based Profit Prediction Model for International Construction Projects (해외건설공사의 리스크 분석에 기초한 수익성 예측모델에 관한 연구)

  • Han, Seung-Heon;Kim, Du-Yon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.635-647
    • /
    • 2006
  • Korean construction companies first advanced to the international markets in 1960's and so far have brought more than 4,900 projects which account for 193 billion dollars approximately. With the large increase of national employment and income being followed by the achievement, Korea's construction industry has made an enormous contribution to the improvement of domestic economy for the last 40 years. However, recently the increased risk in international markets as well as the sharpening competition with foreign companies promising in terms of advanced technologies and low labor cost have been driving Korean construction away from the market shares. According to ENR (Engineering News Record, 1994~2003), it is revealed that 15.1% of top 225 global contractors are suffering from loss in international construction markets. This phenomenon is largely due to the highly uncertain characteristics of international projects, which are inherently exposed to various and complicated risky situations. Furthermore, especially for Korean construction companies, it is often the case that the failure in an international construction project cannot be offset by even a sufficient number of successful domestic achievements. Therefore, not only the selective screening among the nominated projects which have strong possibility of collapse but the systematic strategies for controlling potential risk factors are also considered indispensable in international construction portfolio management. The purpose of this study is to first analyze the causal relationships of the profit-influencing variables and the project success, and develop the profitability forecasting model in international construction projects.

Seismic Influence on Subsea Pipeline Stresses

  • Choi, Byoung-Yeol;Lee, Sang-Gil;Kim, Jin-Kwang;Oh, Jin-Soo
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.3 no.1
    • /
    • pp.1-14
    • /
    • 2017
  • The safety analysis of an earthquake is carried out during the operation of a subsea pipeline and an onshore pipeline. Several cases are proposed for consideration. In the case of a buried pipeline, permanent ground deformation by the earthquake and an increase of internal pressure by the acceleration of the earthquake should be considered. In the case of a subsea pipeline, a bending moment is caused by liquefaction of the backfill material on a trenched seabed, etc., which results in a high bending moment of the buried pipeline. The bending moment causes the collapse of the subsea pipeline or a leak of crude oil or gas, which results in economic loss due to enormous environmental contamination and social economic loss owing to operation functional failure. Thus, in order to prevent economic loss and operation loss, structurally sensitive design with regard to seismic characteristics must be performed in the buried pipeline in advance, and the negative impact on the buried pipeline must be minimized by conducting a thorough analysis on the seabed and backfilling material selection. Moreover, it is proposed to consider the selection of material properties for the buried pipeline. A more economical review is also required for detailed study.

A Development of Platforms for Boiler of Thermal Power Plant (화력발전소 보일러 수퍼히트부 안전발판 개발 연구)

  • Lee, Jung Seok;Lee, Dong Lark;Kim, Hee Kyung;Jeong, Byeong Yong;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.3
    • /
    • pp.34-40
    • /
    • 2017
  • The catastrophic collapse of the in-boiler scaffolding system in the two thermal power plants occurred in March and April 2012. After site investigation and document review, it was found that the specialized scaffolding system was imported for overhaul & maintenance and that the system did not get the safety certification at the import. In this regard, this study developed & proposed an access platform and a support for the vertical tube section of the super heat as well as a variable-length platform for the horizontal tube section, satisfying the domestic certification standards. The access platform was developed to be easy to handle by the worker with a weight of about 0.069 kN, which could reduce the risk of falling accidents and workers' musculoskeletal diseases. For the variable-length platform, it is possible to cope with various changes in length between the horizontal tubes associated with the increase of rigidity in the overlapping and the elimination of the protrusion.