Performance and Economic Analysis of 500 MWe Coal-Fired Power Plant with Post-Combustion $CO_{2}$ Capture Process (연소 후 $CO_{2}$ 포집공정이 적용된 500MWe 석탄화력발전소의 성능 및 경제성평가)

  • Lee, Ji-Hyun;Kim, Jun-Han;Lee, In-Young;Jang, Kyung-Ryoung;Shim, Jae-Goo
    • Korean Chemical Engineering Research
    • /
    • v.49 no.2
    • /
    • pp.244-249
    • /
    • 2011
  • In this study, performance and economic analysis of 500 MWe coal-fired power plant with $CO_{2}$ capture process was performed. For this purpose, chemical absorption method which is commercially available and most suitable for thermal power plant was studied and a criteria for technical and economic assessment of power plants suggested by IEA Greenhouse Gas R&D Programme was used. And we performed the sensitivity analysis focused on regeneration energy which exceed half of the total capture energy. Based on MEA(Monoethanoleamine) as a main chemical solvent and 3.31 GJ/ton$CO_{2}$ regeneration energy in the stripper, net power efficiency was reduced from 41.0% (no capture) to 31.6%(with capture) and the cost of $CO_{2}$ avoided was estimated 43.3 $/ton$CO_{2}$. And in case of 2.0 GJ/ton$CO_{2}$ regeneration energy, the cost of $CO_{2}$ avoided was calculated as 36.7 $/ton$CO_{2}$.

A Study on the Changes in Heavy Metal Emissions when Using Mixed Fuel in a Thermal Power Plant (화력발전소의 혼합연료 사용에 따른 중금속 배출량 변화 연구)

  • Song, Youngho;Kim, Ok;Park, Sanghyun;Lee, Jinheon
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.1
    • /
    • pp.63-75
    • /
    • 2018
  • Objectives: The aim of this research is to explore the total heavy metals from a coal-fired power plant burning bituminous coal with wood pellets due to the implementation of the Renewable Portfolio Standard policy (RPS, 10% of electricity from renewable energy resources by 2023). Methods: The research was carried out by collecting archival data and using the USEPA's AP-42 & EMEP/EEA compilation of emission factors for use in calculating emissions. The Monte Carlo method was also applied for carrying out the calculations of measurement uncertainty. Results: In this paper, the results are listed as follows. Sb was measured at 110 kg (2015) and calculated as 165 kg (2019) and 201 kg (2023). Cr was measured at 1,597 kg (2015) and calculated as 1,687 kg (2019) and 1,728 kg (2023). Cu was measured at 2,888 kg (2015) and calculated as 3,133 kg (2019) and 3,264 kg (2023). Pb was measured at 2,580 kg (2015) and calculated as 2,831 kg (2019) and 2,969 kg (2023). Mn was measured at 3,011 kg (2015) and calculated as 15,034 kg (2019) and 23,014 kg (2023). Hg was measured at 510 kg (2015) and calculated as 513 kg (2019) and 537 kg (2023). Ni was measured at 1,720 kg (2015) and calculated as 1,895 kg (2019) and 1,991 kg (2023). Zn was measured at 7,054 kg (2015) and calculated as 9,938 kg (2019) and 11,778 kg (2023). Se was measured at 7,988 kg (2015) and calculated as 7,663 kg (2019) and 7,351 kg (2023). Conclusion: This shows that most heavy metals would increase steadily from 2015 to 2023. However, Se would decrease by 7.9%. This analysis was conducted with EMEP/EEA's emission factors due to the limited emission factors in South Korea. Co-firewood pellets in coal-fired power plants cause the emission of heavy metals. For this reason, emission factors at air pollution control facilities would be presented and the replacement of wood pellets would be needed.

Performance and Economic Analysis of Domestic Supercritical Coal-Fired Power Plant with Post-Combustion CO2 Capture Process (국내 초임계 석탄화력발전소에 연소 후 CO2 포집공정 설치 시 성능 및 경제성 평가)

  • Lee, Ji-Hyun;Kwak, No-Sang;Lee, In-Young;Jang, Kyung-Ryoung;Shim, Jae-Goo
    • Korean Chemical Engineering Research
    • /
    • v.50 no.2
    • /
    • pp.365-370
    • /
    • 2012
  • In this study, Economic analysis of supercritical coal-fired power plant with $CO_2$ capture process was performed. For this purpose, chemical absorption method using amine solvent, which is commercially available and most suitable for existing thermal power plant, was studied. For the evaluation of the economic analysis of coal-fired power plant with post-combustion $CO_2$ capture process in Korea, energy penalty after $CO_2$ capture was calculated using the power equivalent factor suggested by Bolland et al. And the overnight cost of power plant (or cost of plant construction) and the operation cost reported by the IEA (International Energy Agency) were used. Based on chemical absorption method using a amine solvent and 3.31 GJ/$tonCO_2$ as a regeneration energy in the stripper, the net power efficiency was reduced from 41.0% (without $CO_2$ capture) to 31.6% (with $CO_2$ capture) and the levelized cost of electricity was increased from 45.5 USD/MWh (Reference case, without $CO_2$ capture) to 73.9 USD/MWh (With $CO_2$ capture) and the cost of $CO_2$ avoided was estimated as 41.3 USD/$tonCO_2$.

The Performance Characteristics of Anti-Surge Devices for High Head Cooling Water Systems in 1,000 MW Thermal Power plants (고수두 1,000 MW 석탄화력발전소 냉각수계통 수격방지장치의 성능특성)

  • Kim, Keun-Pil;Yoo, Hoseon
    • Plant Journal
    • /
    • v.15 no.4
    • /
    • pp.36-42
    • /
    • 2019
  • In recent, according to the tightening of environment regulation policy, the height of the site of the power plant is increased and the length of the cooling water pipe is increased. This has a serious impact on the stability of the plant. This study analyzes the transient phenomenon using LIQT 7.2, an unsteady state one-dimensional analysis software, to secure the stability of 1,000 MW high-capacity coal-fired power plant cooling water system with high head. To prevent water hammer, The effects on performance characteristics were predicted by individual and combination application. The surge pressure of the cooling water which occurs when the pump was stopped without installing the anti-surge devices was the largest at the pump outlet side. The most effective and simple way to reduce surge pressure in these cooling water systems is to combine a vacuum breaker with a hydraulic non-return valve, which is an essential device for pump protection.

Application of CFD to Design Procedure of Ammonia Injection System in DeNOx Facilities in a Coal-Fired Power Plant (석탄화력 발전소 탈질설비의 암모니아 분사시스템 설계를 위한 CFD 기법 적용에 관한 연구)

  • Kim, Min-Kyu;Kim, Byeong-Seok;Chung, Hee-Taeg
    • Clean Technology
    • /
    • v.27 no.1
    • /
    • pp.61-68
    • /
    • 2021
  • Selective catalytic reduction (SCR) is widely used as a method of removing nitrogen oxide in large-capacity thermal power generation systems. Uniform mixing of the injected ammonia and the inlet flue gas is very important to the performance of the denitrification reduction process in the catalyst bed. In the present study, a computational analysis technique was applied to the ammonia injection system design process of a denitrification facility. The applied model is the denitrification facility of an 800 MW class coal-fired power plant currently in operation. The flow field to be solved ranges from the inlet of the ammonia injection system to the end of the catalyst bed. The flow was analyzed in the two-dimensional domain assuming incompressible. The steady-state turbulent flow was solved with the commercial software named ANSYS-Fluent. The nozzle arrangement gap and injection flow rate in the ammonia injection system were chosen as the design parameters. A total of four (4) cases were simulated and compared. The root mean square of the NH3/NO molar ratio at the inlet of the catalyst layer was chosen as the optimization parameter and the design of the experiment was used as the base of the optimization algorithm. The case where the nozzle pitch and flow rate were adjusted at the same time was the best in terms of flow uniformity.

Study on the Microstructural Degradation of the Boiler Tubes for Coal-Fired Power Plants

  • Yoo, Keun-Bong;He, Yinsheng;Lee, Han-Sang;Bae, Si-Yeon;Kim, Doo-Soo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.1
    • /
    • pp.25-31
    • /
    • 2018
  • A boiler system transforms water to pressured supercritical steam which drives the running of the turbine to rotate in the generator to produce electricity in power plants. Materials for building the tube system face challenges from high temperature creep damage, thermal fatigue/expansion, fireside and steam corrosion, etc. A database on the creep resistance strength and steam oxidation of the materials is important to the long-term reliable operation of the boiler system. Generally, the ferritic steels, i.e., grade 1, grade 2, grade 9, and X20, are extensively used as the superheater (SH) and reheater (RH) in supercritical (SC) and ultra supercritcal (USC) power plants. Currently, advanced austenitic steel, such as TP347H (FG), Super304H and HR3C, are beginning to replace the traditional ferritic steels as they allow an increase in steam temperature to meet the demands for increased plant efficiency. The purpose of this paper is to provide the state-of-the-art knowledge on boiler tube materials, including the strengthening, metallurgy, property/microstructural degradation, oxidation, and oxidation property improvement and then describe the modern microstructural characterization methods to assess and control the properties of these alloys. The paper covers the limited experience and experiment results with the alloys and presents important information on microstructural strengthening, degradation, and oxidation mechanisms.

Numerical Analysis for Improving of SOx Removal Efficiency in the DSI(Dry Sorbent Injection Technique) of FGD System(I) (배연탈황 공정 중 DSI 공법의 탈황효율 향상을 위한 전산 유체 역학적 연구(I))

  • Chung, Jin-Do;Kim, Jang-Woo;Kim, Byung-Hwan;Park, Young-Moon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.1
    • /
    • pp.47-53
    • /
    • 2007
  • The aim of this study is to research applicable possibility or Dry Sorbent Injection Technique(DSI) in sox removal process using Computational Fluid Dynamics(CFD) software package. It will be applied for 500MW in capacity coal-fired thermal power plant operated by South Korea N. Power Co., Ltd. The DSI process is adapted between a preheater and an EP process in the technological assembly. The numerical analysis performs in predicting and optimizing of DSI process's characteristics, which consists of structure of duct, position of injection nozzles, injection speed, and dispersion of sorbent. Computing results are shown that degree of sorbent dispersion depends on structure of duct and position of injection nozzles strongly. The highest dispersion efficiency was obtained when we set a Lobed-plate inside the duct and 6 injection nozzles on the duct(4 injection nozzles at the corners and 2 injection nozzles on upper and under walls as a rectangle duct shape). We also know that change of injection speed of sorbent doesn't have an large effect on the sorbent dispersion but it can effect to drop pressure.

Comparison of the $SO_2$ Removal Efficiency by Mixing Enhancement Shape (혼합 촉진 장치의 형상에 따른 탈황효율 비교)

  • Chung, Jin-Do;Kim, Jang-Woo;Bae, Young-Peel
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.1
    • /
    • pp.17-22
    • /
    • 2010
  • The aim of this study is to research applicable possibility of DSI (Dry Sorbent Injection) technique in $SO_2$ removal process using lab-scale facility based on 500MW in capacity coal-fired thermal power plant operated by South Korea N. Power Co., Ltd. To increase the $SO_2$ removal efficiency, it is considered the mixing enhancement as different shapes called lobed-plate and stepplate tested ultimately for optimum shape. Also it tested to analysis $SO_2$ removal efficiency by numbers of injection holes. At experimental it showed the $SO_2$ removal efficiency is higher using mixing enhancement than not installed mixing enhancement and case on the step-plate was shown the most $SO_2$ removal efficiency. Also, $SO_2$ removal efficiency was higher recording which will increase the injection holes case on not installed mixing enhancement. But, the $SO_2$ removal efficiency was higher 4 injection holes case on installed mixing enhancement.

An Economic Analysis of the Effluent Heat Supply from Thermal Power Plant to the Farm Facility House (화력발전소 온배수열 활용 시설하우스 열공급 모형 경제성분석 연구)

  • Um, Byung Hwan;Ahn, Cha Su
    • Korean Chemical Engineering Research
    • /
    • v.56 no.1
    • /
    • pp.6-13
    • /
    • 2018
  • Utilizing the heat of cooling water discharge of coal-fired power plant, pipeline investment costs for businesses that supply heat to agricultural facilities near power plants increase in proportion to installation distance. On one hand, the distance from the power plant is a factor that brings difficulties to secure economic efficiency. On the other, if the installation distance is short, there is a problem of securing the heating demands, facility houses, which causes economical efficiency to suffer. In this study, the economic efficiency of 1km length of standard heat pipeline was evaluated. The sensitivity of the heat pipe to the new length variation was analyzed at the level of government subsidy, amount of heating demand and the incremental rate of pipeline with additional government subsidy. As a result of the analysis, it was estimated that NPV 131 million won and IRR 15.73%. The sensitivity analysis showed that NPV was negative when the length of heat pipe facility exceeded 2.6 km. If the government supports 50% of the initial investment, the efficiency is secured within the estimated length of 5.3 km, and if it supports 80%, the length increases within 11.4 km. If the heat demand is reduced to less than 62% at the new length of the standard heat pipe, it is expected economic efficiency is not obtained. If the ratio of government subsidies to initial investment increases, the elasticity of the new bloc will increase, and the fixed investment, which is the cost of capital investment for one unit of heating demand, will decrease. This would result in a reduction in the cost of production per unit, and it would be possible to supply heat at a cheaper price level to the facility farming. Government subsidies will result in the increased economic availability of hot plumbing facilities and additional efficiencies due to increased demand. The greater government subsidies to initial investment, the less farms cost due to the decrease in the price per unit. The results of the study are significant in terms of the economic evaluation of the effectiveness of the government subsidy for the thermal power plant heat utilization project. The implication can be applied to any related pilot to come.

The Technology Development Trends of Supercritical CO2 Power Generation (초임계 CO2 발전 기술개발 동향)

  • Kim, Beom-Ju
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.4
    • /
    • pp.531-536
    • /
    • 2016
  • The worldwide research and development for high-efficiency power generation system is progressing steadily because of the growing demand for reducing greenhouse gas emissions. Many countries have spurred the research and development of supercritical $CO_2$ power generation technology since 2000 because it has the advantage of compactness, efficiency, and diversity. Supercritical $CO_2$ power generation system can be classified into an indirect heating type and a direct heating type. As of now, most studies have concentrated on the development of indirect type supercritical $CO_2$ power generation system. In the United States, NREL(National Renewable Energy Lab.) is developing supercritical $CO_2$ power generation system for Concentrating Solar Power. In addition, U.S. DOE(Department of Energy) also plans to start investing in the development of the supercritical $CO_2$ power generation system for coal-fired thermal power plant this year. GE is developing not only 10MW supercritical $CO_2$ power generation turbomachinery but also the conceptual design of 50MW and 450MW supercritical $CO_2$ power generation turbomachinery. In Korea, the Korean Atomic Energy Research Institute has constructed the supercritical $CO_2$ power generation test facility. Moreover, KEPRI(Korea Electric Power Research Institute) is developing a 2MW-class supercritical $CO_2$ power generation system using diesel and gas engine waste heat with Hyundai Heavy Industries.