A Sduty of Analyzing Claim Factor and Making Strategies to Prevent Claim in Bidding and Contracting Stage for Architectural Turn-Key Project (건축턴키공사 입찰.계약 단계에서의 클레임 예방을 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내대형건축턴키공사 사례중심으로 -)

  • 윤준선;백준홍
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.353-376
    • /
    • 2004
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project - (건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 -)

  • Yoon Jun-Seon;Yoo Byoung-Eok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project - (건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 -)

  • Yoon Jun-Seon;Seo Choon-Taek
    • Journal of Arbitration Studies
    • /
    • v.15 no.1
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF

Decision of Abnormal Quality Unit Lists from Claim Database

  • Lee, Sang-Hyun;Lee, Sang-Joon;Moon, Kyung-Li;Kim, Byung-Ki
    • Journal of Information Processing Systems
    • /
    • v.4 no.3
    • /
    • pp.113-120
    • /
    • 2008
  • Most enterprises have controlled claim data related to marketing, production, trade and delivery. They can extract the engineering information needed to the reliability of unit from the claim data, and also detect critical and latent reliability problems. Existing method which could detect abnormal quality unit lists in early stage from claim database has three problems: the exclusion of fallacy probability in claim, the false occurrence of claim fallacy alarm caused by not reflecting inventory information and too many excessive considerations of claim change factors. In this paper, we propose a process and methods extracting abnormal quality unit lists to solve three problems of existing method. Proposed one includes data extraction process for reliability measurement, the calculation method of claim fallacy alarm probability, the method for reflecting inventory time in calculating claim reliability and the method for identification of abnormal quality unit lists. This paper also shows that proposed mechanism could be effectively used after analyzing improved effects taken from automotive company's claim data adaptation for two years.

Forecasting the Effects of the Claims in the Korean Construction Industry (국내 중재사례를 통한 주요 건설 클레임 예측 방안)

  • Kim, Jihye;Im, Haekyung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.35-44
    • /
    • 2016
  • Various risk factors are known to be the nature of construction project execution process. These factors lead to potential claims, dispute mediation, arbitration, and litigation which can result in huge loss of money and time. Therefore, it is necessary for construction companies in Korea to improve overall project management capability through the evaluation before entering into the overseas construction market. Also, after examination of the claim and dispute caused by construction project risks, a substantial degree of influence and active preparation for the claim and dispute management should be confirmed via the effect analysis of the each factors. Main claim causes were derived through claim and dispute cases involved with domestic construction projects. As a prediction result of the main claim, 16.1% of the construction change claim, 5.7% of the bad faith claim and 2.7% for the construction delay claim were found to be the portion of the total construction cost. As a result of this analysis, risk management methodology was suggested to improve a project management capability for domestic construction companies through analysis result of the main factors of construction claims.

A empirical study on the Employee's Workplace Satisfaction for Insurance Claim adjusting company (손해사정회사 종업원의 직장만족 결정요인 연구)

  • Kim, Jaetae;Yoo, kyungjin;Choi, Youngjin;Kim, Jongwon
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.2
    • /
    • pp.245-252
    • /
    • 2015
  • Employee's workplace satisfaction of claim adjusting company, who assesses the loss of catastrophe, have a direct influence on the loss evaluation job. Eventually their satisfaction would affect the compensation satisfaction of victims, therefore it is one of important factors for victims's compensation satisfaction. This paper analyzes empirically the determinants of employee's satisfaction to their firm for a claim adjusting company. As a result of the empirical research, it is found that the statistically significant determinant are the psychological factor, the organizational factor, and the individual factor. Among the significant factors, the psychological factor has the biggest positive factor. And the organizational factor and the individual factor is next with similar positive measurement. But the cognitive factor is not statistically significant. A claim adjusting company may use the research result for the improvement of employee's workplace satisfaction.

Analysis and Prevention Countermeasures of Claim factors in Domestic Apartment Construction (국내 아파트공사의 클레임요인 분석 및 예방대책)

  • Lim Jong-Chan;Song Yong-Sik;Kim sun-kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2002
  • Claims are on an increasing trend in the domestic construction field with changes of negative thought about them. But there are still many factors of causing disputes Potentially due to old customs that an owner is predominant over a contractor. Unless these factors are solved, it is obvious that many disputes will occur henceforward. This study derives claim factors that must be solved first of all through analyzing how claim factors influence construction management factors such as time, cost, quality, and presents countermeasures that may prevent these claims.

  • PDF

Usefulness of medical review in the insurance claims

  • Lee, Eui-Kwan;Hwang, Jin-Sup;Lee, Sin-Hyung
    • The Journal of the Korean life insurance medical association
    • /
    • v.28 no.1_2
    • /
    • pp.31-35
    • /
    • 2009
  • Background : Many of internists have been working for insurance industry. Insurance medicine is use of medical knowledge for insurance industry. There is social role of insurance medicine in terms of soundness of insurance administration. Recently social role of internists also have been being watched. Although theme of insurance medicine is medical risk selection, insurance claims administration also needs medical experts'opinion. There are not any corroborative study of medical consulting for insurance claims. Among insurance industry, someone called this medical review of insurance claims as 'medical claims review'. Aim : To investigate usefulness of medical review of insurance claims. Design : Questionnaire survey with claim staffs in one of insurance claim adjustment company in Korea. Methods : 265 claim staffs were divided into 4 groups and conducted survey using a questionnaire of 20 questions. Utility score, job satisfaction score, and difficult factors of claims administration were measured. Results : Utility score and job satisfaction score are highest in medical claims review group. The most difficult in claim administration to claim staffs was demonstrated to medical knowledge. Conclusion : Medical review of insurance claims is proved to be worthy. Document-based consulting method, namely medical claims review, is more useful than telephone-based simple query among claim staffs...Subjects of the medical claims review are medical record and it's principle is independent medical examination with evidence-based approach, it also has role of protecting fraud of insurance claims. Two main question types of medical claims review are verification and advice.

  • PDF