• Title/Summary/Keyword: change-point model

Search Result 746, Processing Time 0.027 seconds

Coupled Finite Element Analysis of Partially Saturated Soil Slope Stability (유한요소 연계해석을 이용한 불포화 토사사면 안전성 평가)

  • Kim, Jae-Hong;Lim, Jae-Seong;Park, Seong-Wan
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.35-45
    • /
    • 2014
  • Limit equilibrium methods of slope stability analysis have been widely adopted mainly due to their simplicity and applicability. However, the conventional methods may not give reliable and convincing results for various geological conditions such as nonhomogeneous and anisotropic soils. Also, they do not take into account soil slope history nor the initial state of stress, for example excavation or fill placement. In contrast to the limit equilibrium analysis, the analysis of deformation and stress distribution by finite element method can deal with the complex loading sequence and the growth of inelastic zone with time. This paper proposes a technique to determine the critical slip surface as well as to calculate the factor of safety for shallow failure on partially saturated soil slope. Based on the effective stress field in finite element analysis, all stresses are estimated at each Gaussian point of elements. The search strategy for a noncircular critical slip surface along weak points is appropriate for rainfall-induced shallow slope failure. The change of unit weight by seepage force has an effect on the horizontal and vertical displacements on the soil slope. The Drucker-Prager failure criterion was adopted for stress-strain relation to calculate coupling hydraulic and mechanical behavior of the partially saturated soil slope.

Development of the Precision Image Processing System for CAS-500 (국토관측위성용 정밀영상생성시스템 개발)

  • Park, Hyeongjun;Son, Jong-Hwan;Jung, Hyung-Sup;Kweon, Ki-Eok;Lee, Kye-Dong;Kim, Taejung
    • Korean Journal of Remote Sensing
    • /
    • v.36 no.5_2
    • /
    • pp.881-891
    • /
    • 2020
  • Recently, the Ministry of Land, Infrastructure and Transport and the Ministry of Science and ICT are developing the Land Observation Satellite (CAS-500) to meet increased demand for high-resolution satellite images. Expected image products of CAS-500 includes precision orthoimage, Digital Surface Model (DSM), change detection map, etc. The quality of these products is determined based on the geometric accuracy of satellite images. Therefore, it is important to make precision geometric corrections of CAS-500 images to produce high-quality products. Geometric correction requires the Ground Control Point (GCP), which is usually extracted manually using orthoimages and digital map. This requires a lot of time to acquire GCPs. Therefore, it is necessary to automatically extract GCPs and reduce the time required for GCP extraction and orthoimage generation. To this end, the Precision Image Processing (PIP) System was developed for CAS-500 images to minimize user intervention in GCP extraction. This paper explains the products, processing steps and the function modules and Database of the PIP System. The performance of the System in terms of processing speed, is also presented. It is expected that through the developed System, precise orthoimages can be generated from all CAS-500 images over the Korean peninsula promptly. As future studies, we need to extend the System to handle automated orthoimage generation for overseas regions.

A Study on the adaptive Connection Admission Control Method in ATM Networks (ATM망에서 적응적 연결수락제어 방법에 관한 연구)

  • 한운영;차균현
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.19 no.9
    • /
    • pp.1719-1729
    • /
    • 1994
  • In this paper, an adaptive CAC(Connection Admission Control) method is proposed. The adaptive CAC uses traffic estimates derived from both traffic parameter specified by user and cell flow measurements. Traffic estimation using user-specified parameters is performed at every moment of connection request or connection release by recursive formula which makes real-time calculation possible. Traffic estimation using cell flow measurement is carried out when the number of connected calls does not change during a measurement reflection period-renewal period. The most import ant thing for the traffic estimation using cell flow measurement is the determination of the length of a renewal period to trace a real traffic flow with an allowable time lag and the measurement reflection ratio(MRR) both to reduce the portion of overestimation and to avoid underestimation of real traffic flow. To solve these problems, the adaptive CAC updates renewal period and MRR adaptively according to the number of connections and the elapsed time after last connection or release respectively. Performance analysis for the proposed method is evaluated in several aspects for the cases of both homogeneous and heterogeneous bursty traffic. Numerical examples show the adaptive CAC method has the better performance compared with conventional CAC method based on burst model from the both utilization and QOS point of view.

  • PDF

A Study on the Finite Element Analysis and Management Criteria by Applying UPRS Method in the Subway Station (기존 지하철정거장 비개착공법 적용시 유한요소 해석과 관리기준에 관한 연구)

  • Cho, Byeong Joon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.4
    • /
    • pp.43-52
    • /
    • 2019
  • To analyze the influence on the stability, resulting from application of upgrade pipe roof structure (UPRS) method to the structure existed under subway Station, physical properties of a ground, elasticity and elasto-plastic theories, including displacement analysis of finite elements, stress analysis of finite elements, displacement caused by steel pipe propulsion and internal excavation, and stress change in a steel pipe, were introduced. Then, the influence on structural stability when applying the UPRS method was compared and reviewed based on the construction management standard of the Ministry Land, Infrastructure and Transport and foreign sources, using numerical analysis with a model which assumes that each microelement divided into a structurally stable point consists of the connection of finite points. As a result of the finite element analysis, 7.21 mm maximum displacement, 1/3,950 angular displacement, 70.28 MPa bending compressive stress of steel pipe structure constructed with UPRS (non-excavation) method and 477.38 MPa maximum shear strength were within their allowable standards (25.00 mm, 1/500, 210.00 MPa and 120.00 MPa, respectively), and therefore, the results showed that the design and construction are stable.

The Korean Geodetic Network Adjustments for EDM Area (국가기준점 망조정에 관한 연구 - EDM 관측지역)

  • Yang, Hyo-Jin;Choi, Yun-Soo;Kwon, Jay-Hyoun;Kim, Dong-Young
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.25 no.5
    • /
    • pp.393-398
    • /
    • 2007
  • According to the Korean datum change to a world geodetic system, the EDM area should be readjusted to provide consistent product over the country. The data set for EDM area is extracted from the previous KTN1987 DB and checked for the moved markers in XY network adjustment which provides quality verification. Then, EDM data set for the seven areas are rebuilt for the adjustment. Since the data is still based on the old datum, the coordinates of the data are transformed by applying the coordinate transformation parameters. Here, the transformation parameters, which were determined for the conversion of 1:50,000 topographic maps by NGII, were used. For each EDM point, the geoidal height from EGM96 model is applied to obtain the ellipsoidal height based on the GRS80. The measured distance projected onto GRS80 is adjusted using BL network adjustment by fixing 2nd order or 3rd order GPS control points. The results from the readjustment show the minimum standard error of 1.37" and the maximum standard error of 2.13". Considering the measurement accuracy of EDM (1.6" corresponding to about 2cm) and GPS position for fixed points (2cm), this result is considered to be reasonable and it is good for the practical use.

Subsurface Geological Structure of the Southwestern Part of the Ogcheon Zone by Gravity and Magnetic Surveys (중력 및 자력탐사에 의한 옥천대 남서부의 지하 지질구조)

  • 김성균;오진용;안건상;김용준
    • The Journal of Engineering Geology
    • /
    • v.8 no.3
    • /
    • pp.285-296
    • /
    • 1998
  • As a part of the study for understanding the deep geological structure of the Ogcheon Zone, both gravity and geomagnetic surveys are performed. A 70km survey line of which direction is nearly perpendicular to major faults in the southern tip of the Zone. The observed data are corrected and transformed into Bouguer and total magnetic intensity anomalies, respectively. Recent studies for petrology and geochemistry in the southwestern Ogcheon Zone in the vicinity of the survey line are reviewed for better interpretation. Both gravity and geomagnetic anomalies abruptly change around Janghung area, the southern boundary of the, Ogcheon Zone. This rapid increase of Bouguer anomaly around Janghung area can be explained by a deep seated normal fault with fairy large displacement between Precambrian gneisses and the denser intermediate plutonic rocks. It is believed that the fault acted an important role for the formation and evolution of the Ogcheon Zone. A pseudomagnetic intensity anomaly is calculated from the Bouguer anomaly assuming that the both anomalies are associated with the common source. From the origin of the survey line to the 50km point, the calculated anomaly coincides with observed magnetic anomaly. Whereas both anomalies show negative correlation in the outside 50km. From the residual Bouguer anomalies, the subterranean geological structure is provided through the iterative forward method. The initial model is obtained from informations about the surface geology as well as the results of the inverse method.

  • PDF

Analysis of Static Lateral Stability Using Mathematical Simulations for 3-Axis Tractor-Baler System

  • Hong, Sungha;Lee, Kyouseung;Kang, Daein;Park, Wonyeop
    • Journal of Biosystems Engineering
    • /
    • v.42 no.2
    • /
    • pp.86-97
    • /
    • 2017
  • Purpose: This study aims to evaluate the applicability of a tractor-baler system equipped with a newly developed round baler by conducting stability analyses via static-state mathematical simulations and verification experiments for the tractor equipped with a loader. Methods: The centers of gravity of the tractor and baler were calculated to analyze the transverse overturning of the system. This overturning of the system was analyzed by applying mathematical equations presented in previous research and comparing the results with those obtained by the newly developed mathematical simulation. For the case of the tractor equipped with a loader, mathematical simulation results and experimental values from verification experiments were compared and verified. Results: The center of gravity of the system became lower after the baler was attached to the tractor and the angle of transverse overturning of the system steadily increased or decreased as the deflection angle increased or decreased between $0^{\circ}$ and $180^{\circ}$ on the same gradient. In the results of the simulations performed by applying mathematical equations from previous research, right transverse overturning occurred when the tilt angle was at least $19.5^{\circ}$ and the range of deflection angles was from $82^{\circ}$ to $262^{\circ}$ in counter clockwise. Additionally, left transverse overturning also occurred at tilt angles of at least $19.5^{\circ}$ and the range of deflection angles was from $259^{\circ}$ to $79^{\circ}$ in counter clockwise. Under the $0^{\circ}$ deflection angle condition, in simulations of the tractor equipped with a loader, transverse overturning occurred at $17.9^{\circ}$, which is a 2.3% change from the results of the verification experiment ($17.5^{\circ}$). The simulations applied the center of gravity and the correlations between the tilt angles, formed by individual wheel ground contact points excluding wheel radius and hinge point height, which cannot be easily measured, for the convenient use of mathematical equations. The results indicated that both left and right transverse overturning occurred at $19.5^{\circ}$. Conclusions: The transverse overturning stability evaluation of the system, conducted via mathematical equation modeling, was stable enough to replace the mathematical equations proposed by previous researchers. The verification experiments and their results indicated that the system is workable at $12^{\circ}$, which is the tolerance limit for agricultural machines on the sloped lands in South Korea, and $15^{\circ}$, which is the tolerance limit for agricultural machines on the sloped grasslands of hay in Japan.

Tunneling-induced Building Damage Risk Assessment System (터널굴착에 따른 인접건물 손상위험도 평가시스템)

  • Park, Yong-Won;Yoon, Hyo-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.51-59
    • /
    • 2002
  • This paper deals with development of a damage risk assessment system for adjacent buildings to under-passing tunnel face considering 3D-ground movement. The system consists of building and ground information module, monitoring data module, settlement evaluation module, and building damage risk assessment module. The major modules, settlement evaluation module and building damage assessment module, are based on settlement estimation model suggested by Attewell et al (1982) and the building damage assessment method by Mair et al. (1996). After estimating 3D-ground movements due to tunneling with settlement evaluation module, damage assessment far buildings is performed using building damage risk assessment module. The developed system has two major functions; 1) calculation of 3D-settlement with ground loss ($V_{s}$)or maximum settlement ($w_{max}$) and inflection point (i) using various empirical formulae, monitoring data, numerical results, and so on; 2) assessment of damage risk for adjacent buildings of arbitrary section with position change of tunnel face. The field data given by Boscadin and Cording (1989) leer the case of two-storied masonry building near the Metro tunnel in Washington D.C. was simulated to verify the applicability of the developed system.

Flow Analysis Based on the Recovery of Lateral Connectivity in the River (하천 내 횡적 연결성 회복을 통한 흐름 해석)

  • Lee, Jin Woo;Chun, Seung Hoon;Kim, Kyu-Ho;Kim, Chang Wan
    • Journal of Wetlands Research
    • /
    • v.16 no.2
    • /
    • pp.213-220
    • /
    • 2014
  • Recently, river maintenance is change due to concern for the environment increases. Thus, the river restoration and river environment is best part of river maintenance. In case of Korea, existing river is improvement straightly for flood control and transportation. When the stream channel is straightly, maintain stability is important. Thus, construction of levees along the river. The various river structures for the purpose of flood control and transportation are inhibit factors of longitudinal and lateral connectivity. Connectivity is defined as the maintenance of lateral, longitudinal, and vertical pathways for biological, hydrological, and physical processes. Long-term point of view, increased connectivity is very important for a healthy ecosystem composition. As the first step of river restoration, this study described theory and concept of river continuum and the numerical model was applied to a real topography to simulate the flow analysis with or without segregated and blocked space in the Mankyung river. The results of this study can be utilized to develop the watershed connectivity assessments methods in order to the river restoration.

Development of the EMC-based Empirical Model for Estimating Pollutant Loads from Small Agricultural Watersheds (농촌 소유역에서 EMC를 이용한 오염물질 부하량 산정기법의 개발)

  • Kim, Young-Chul;Kim, Geon-Ha;Lee, Dong-Ryul
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.4
    • /
    • pp.691-703
    • /
    • 2003
  • In this paper, a new and integrated approach easily used to calculate the pollutant loads from agricultural watersheds is suggested. Basic concepts of this empirical tool are based on the hypotheses that variations in event mean concentrations(EMCs) of the pollutants from a given agricultural watershed during rainstorms are only due to the rainfall pattern. This assumption would be feasible to agricultural watersheds whose land uses does not change during the cultivation period overlapped by rainy season and also in which point-sources of the pollutants are rare. Therefore, if EMC data sets through extensive sampling from various rural areas are available, it is possible to establish relationships between EMCs, shapes and land uses of the watersheds, and rainfall events. For this purpose, fifty one sets of EMC values were obtained from nine different watersheds, and those data were used to develop predictive tools for the EMCs of 55, COD, TN and TP in rainfall runoff. The results of the statistical tests for those formulas show that they are not only fairly good in predicting actual EMC values of some parameters, but also useful in terms of calculating pollutant loads on any time-spans such as the day of rainfall event or weekly, monthly, and yearly. Their applicability was briefly demonstrated and discussed. Also, the unit loads calculated from EMCs based on different land uses and real rainfall data over one of the watershed used for this study. were provided, and they are compared with other well-known unit loads.