• 제목/요약/키워드: change order (design change)

검색결과 1,612건 처리시간 0.031초

설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 - (A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage -)

  • 박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구 (Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project)

  • 류혁준;박병주;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 - (Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case -)

  • 연희정;현창택;이상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

기후변화 시나리오에 따른 건물부분의 영향 (Impact of climate change scenarios in the Building Sector)

  • 이관호
    • 한국태양에너지학회 논문집
    • /
    • 제33권2호
    • /
    • pp.64-69
    • /
    • 2013
  • According to the Fourth Assessment Report of Intergovernmental Panel on Climate Change(IPCC) Working Group III, climate change is already in progress around the world, and it is necessary to execute mitigation in order to minimize adverse impacts. This paper suggests future climate change needs, employing IPCC Special Report on Emissions Scenarios(SRES) to predict temperature rises over the next 100 years. This information can be used to develop sustainable architecture applications for energy efficient buildings and renewable energy. Such climate changes could also affected the present supplies of renewable energy sources. This paper discusses one recent Fourth Assessment Report of IPCC (Mitigation of Climate Change) and the Hadley Centre climate simulation of relevant data series for South Korea. Result of this research may improve consistency and reliability of simulation weather data or climate change in order to take advantage of SRES and PRECIS QUMP. It is expected that these calculated test reference years will be useful to the designers of solar energy systems, as well as those who need daily solar radiation data for South Korea. Also, those results may contribute zero carbon and design of sustainable architecture establishing future typical weather data that should be gone ahead to energy efficient building design using renewable energy systems.

터널공사 사례분석에 의한 설계변경 표준프로세스 구성방안 (Case Study and Standard Process Analysis of Change Order in Design for Road Tunnel Project)

  • 강인석;김동광;정원명;이승렬;김현수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.1149-1152
    • /
    • 2005
  • Recently, tunnel structure is being widely used in railway or roadway construction projects because earthwork causes large cutting and damages in environmental factors. However, there are many changes of design by different items comparing with design phase in tunnel structure by uncertain drawings. This study develops a standard process for the change of design to reduce change orders in construction phase.

  • PDF

원전구조물의 고강도철근 설계 최적화 방안 (Design Optimization of Nuclear Power Plant Structures with High-Strength Reinforcements)

  • 이병수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.137-138
    • /
    • 2017
  • Generally, a lot of reinforcements are used in nuclear power plant concrete structures in order to improve the structural safety, but it may cause several potential problems due to the overcrowded reinforcement, such as the degradation of concrete quality, the construction delay and the increase of construction cost. In order to resolve these problems, structural test researches and code change studies on using high-strength reinforcement (Gr.80) in unclear power plant structures are under way, and there is good progress in code change of ASM BPVC.III.2 and ACI 349. This purpose of this study is to review the code change status ASM BPVC.III.2, ACI 349 under way to use the high-strength reinforcement in nuclear power plant structures. Also I will introduce the design optimization of NPP structures with high-strength reinforcements in order to maximize the effect and minimize the problem when using the high-strength reinforcements in NPP structures.

  • PDF

ANALYZING CAUSES OF CHANGE ORDERS IN KOREA ROAD PROJECTS

  • Kang-Wook Lee;Wooyong Jung;Seung Heon Han;Byeong-Heon Yoon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1283-1287
    • /
    • 2009
  • The Korean government implemented 259 road projects from 2004 to 2007, valued at $18.4 billion. Change orders of these road projects occurred 8,973 times and, subsequently, caused significant increases in the cost of the projects, approximately up to $4.2 billion (22.8% of the initial budget). These significant problems of huge change orders require a more workable control system for budget management whereas the effectiveness of the government's control is still not satisfied. However, previous approaches and studies mostly limited their analyses to simply classifying the causes of the change orders. This paper investigates the real frequency and cost impacts incurred by each cause of a change order, primarily based on 218 road projects in Korea. The paper then identifies the attributes of change orders through a survey of 204 project participants in that those sources were inevitable or avoided if properly managed. The causes of the change orders are further analyzed with analysis of variance (ANOVA) in connection with contract volume, bid award rate, the contractor's capacity to perform, and the design company's capacity. This study found that if the contract volume is smaller, then the possibility of change orders is higher. Interestingly, if the bid award rate is less than 67.5%, it signifies the highest rate of change orders. In addition, the contractors whose construction ability is assessed as the top-ranked group showed the lowest change order rates. With these results, this paper provides the preventive guidelines for reducing the likelihood of change orders.

  • PDF

수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현 (Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments)

  • 전규환;장길상;박창권
    • 문화기술의 융합
    • /
    • 제7권4호
    • /
    • pp.879-892
    • /
    • 2021
  • 수주생산 환경에서 제조업체의 견적정보는 다양한 고객요구에 대응하여, 프로젝트의 입찰, 수주, 그리고 생산할 제품의 기초정보로 사용하는 중요한 정보이다. 이 견적정보는 고객요구, 제품생산 환경의 변화, 기술제휴사의 도면정보 변경, 그리고 제품의 기술 개선 등의 여러 요인에 의해 변경된다. 이러한 변경으로 인하여, 제조사가 고객의 요구사항을 반영하여 작성중인 견적정보에 다양한 변경이 발생한다. 이러한 다양한 변경요인에 따른 견적정보의 변경은 수주생산 기업의 입장에서 견적관리업무에 많은 부담을 주고 있다. 특히, 견적의 변경요인으로 인한 견적정보 변경은 고객중심의 주문생산 환경에서 고객의 요구사항에 의해 불가피하고 빈번하게 발생한다. 본 논문에서는 견적생성 프로세스를 기준으로 견적변경 프로세스를 제시하고, 일관적이고 효율적인 견적변경처리 방안을 제시하고자 한다. 이를 위하여, 견적의 변경이 발생하는 요인을 정의하고, 각 요인에 대한 변경유형을 정의하였다. 그리고 견적변경에 대한 발생 요인별 사례를 통하여 견적변경 프로세스가 견적관리시스템에 적용되는 과정을 보여준다. 또한 제안된 견적변경 요인, 견적변경 유형, 견적변경 프로세스, 그리고 견적체계 관리의 유용성을 보여주기 위하여, 고객 중심의 수주생산기업인 'H'사의 선박엔진 부문의 통합 견적관리시스템에서의 견적변경처리 기능 및 절차에 적용하였다. 그 결과, 견적변경 요인에 따른 견적변경 처리 및 관리가 효율적으로 수행됨을 확인하였다.