Case Study and Standard Process Analysis of Change Order in Design for Road Tunnel Project (터널공사 사례분석에 의한 설계변경 표준프로세스 구성방안)

  • Kang Leen-Seok;Kim Dong-Kwang;Jung Won-Myoung;Lee Seung-Ryul;Kim Hyun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1149-1152
    • /
    • 2005
  • Recently, tunnel structure is being widely used in railway or roadway construction projects because earthwork causes large cutting and damages in environmental factors. However, there are many changes of design by different items comparing with design phase in tunnel structure by uncertain drawings. This study develops a standard process for the change of design to reduce change orders in construction phase.

  • PDF

The Analysis of the Current Situation in Design Change of Temporary Structures (가설구조물의 설계반영실태 분석)

  • Lee, Y.S.;Lee, M.G.;Kim, Y.G.;Paik, S.W.;Song, C.G.;Han, D.H.;Oh, T.K.
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.45-52
    • /
    • 2014
  • The construction accidents in temporary structures have ceaselessly happened and these mostly lead to serious disasters associated with public criticism. Recently, the accidents under construction due to incomplete or faulty design has repeatedly occurred such as the overturned girder accident in Jangnam Bridge, the submerged incident in Noryangjin and the slab collapse in Banghwa Bridge. In order to prevent such accidents due to the faulty design in temporary structures, it's important to set up the solid construction management system which allows the reasonable design change if necessary. In this regard, this study provides the basic data for the reasonable design change in temporary structures by conducting a question investigation to the construction, design, and supervising companies. From the survey results, the kind and range of the temporary structures which should considers the design change were suggested by the deduced reasonable processes.

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

Efficiency of Design Changes by Comparing the Availability of Excel and the Cost-of-construction Program (엑셀과 적산프로그램의 가용성 비교를 통한 설계변경 업무의 효율성 방안)

  • Ryu, BoHyeun;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.325-326
    • /
    • 2021
  • Design changes are inevitable areas of work for construction engineers as they occur frequently in the construction site, and are becoming a technical measure of the technical person to the design change. In this study, the purpose is to analyze by comparing the availability of excel and the enscised program during design changes through the case, and to present the efficiency of the the Cost-of-construction Program.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

The Needs for Training Manpower and the Change in Construction Environment by Equipment Based BIM Design (설비분야 BIM 설계에 따른 건축환경 변화와 인재양성의 필요성)

  • Kim, Jong-Hwan
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.14 no.4
    • /
    • pp.157-165
    • /
    • 2011
  • The study figures out the alternatives of training BIM design experts which is the biggest obstacle in training manpower of professional BIM designer, the largest problem when the plant introduce BIM design about the change in Construction Environment by Equipment Based BIM Design in reality of design followed by equipment based BIM design, education institution plan. BIM is the system which is built to make these information be used easier and technique which enables design construction and maintenance in 3-dimensional virtual space by designing buildings in 3-dimensional space, and by data-basing the generated information of every life-cycle information. As the essential contents of the study, educational institutions with the public authority should invest the opening of educational programs, recruit of experts and development of textbooks from a long-term perspective. And also, the role of public institution is important above all for the development of construction industry.

Development of Requirement Taxonomy for Design Bases Management during NPP lifecycle (원전 생애주기간 설계기준 정보관리를 위한 요건 분류체계 개발)

  • Kim, Jong-Myeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.134-135
    • /
    • 2018
  • Nuclear Power Plant consists of about 1.4 million facilities. and the design standards and design requirements for the continuos utilization and safety of facilities are complexly connected with the facilities. When a design change for facilities or design requirements is occurred at the time of construction or operation, there are a lot of facilities, design requirements, and design bases that are affected by the facilities or design bases being changed. The above design changes are so complex that the existing document-bases design change process is time-consuming and may also cause human error. In this study, we developed a design requirement taxonomy that can be applied to the data-centric design bases document that can improve it. To do this, we analyze the design elements from the highest level to the lowest level applied to the nuclear power plant, and classify the design elements according to the characteristics of the design elements.

  • PDF

Design Optimization of Nuclear Power Plant Structures with High-Strength Reinforcements (원전구조물의 고강도철근 설계 최적화 방안)

  • Lee, Byung Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.137-138
    • /
    • 2017
  • Generally, a lot of reinforcements are used in nuclear power plant concrete structures in order to improve the structural safety, but it may cause several potential problems due to the overcrowded reinforcement, such as the degradation of concrete quality, the construction delay and the increase of construction cost. In order to resolve these problems, structural test researches and code change studies on using high-strength reinforcement (Gr.80) in unclear power plant structures are under way, and there is good progress in code change of ASM BPVC.III.2 and ACI 349. This purpose of this study is to review the code change status ASM BPVC.III.2, ACI 349 under way to use the high-strength reinforcement in nuclear power plant structures. Also I will introduce the design optimization of NPP structures with high-strength reinforcements in order to maximize the effect and minimize the problem when using the high-strength reinforcements in NPP structures.

  • PDF

A Study on the Remodeling Case of General Hospitals in Korea - Focused on the Case of S Hospital - (국내 종합병원의 리모델링 사례 연구 - S 병원을 중심으로 -)

  • Kim, Ha-Jin;Kim, Boong-Sik;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.8 no.1
    • /
    • pp.21-28
    • /
    • 2002
  • As hospitals change continuously and rapidly, the way of growth and change becomes another important factor in the design of a hospital. The hospitals are adapted for the continuous growth and change during their life span. But the hospitals built in 1970's and 80's have been expanded and reconstructed without any plan of growth and change. So, there is required to the architectural planning on the remodeling and modernization strategy of general hospitals. The purpose of this study is to provide the fundamental data for the reasonable design planning and the basic principles of the construction plan in the hospital remodeling. Thus, this study is to investigate and analyze the characteristics of hospital remodeling, the remodeling planning, and the scheduling process in terms of construction. As a result, this study would apply to design guideline for the remodeling of general hospitals.

  • PDF