• Title/Summary/Keyword: change construction design

Search Result 901, Processing Time 0.029 seconds

Environmentally Sound and Sustainable Dam Construction in Asia (Hantan River Dam in Korea)

  • Baek, Unil;Kim, Myunsun;Park, Younghwan;Noh, Seungkyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.134-147
    • /
    • 2004
  • Theses days, there are 3 prerequisites for dam building in Korea: First one is how to build the dam safe and stable from the technical points of view. Second one is how to design and construct the dam environmentally sound with the minimum change of the surrounding area of the dam site. Third one is how to activate the local economy of the surrounding area of the dam site in order to make the dam construction sustainable from the social and economical points of view. As far as technical aspects far dam building, there are hardly any problems in dam design and construction in our country. However, there are a little difficulty according to the location of the dam site. In order to fulfill the second option it is believed that a lot of effort should be made to accomplish the second task not only because that fairly large area shall be inundated with water after impounding but also because that ecological environments shall be changed due to change of water environment. Therefore, thoughtful investigation and assessment of the environmental features of the local regions have to be preceded before starting of the dam building. In order to overcome these difficulties Hantan river dam has been declared as an Eco-dam with 3 strategies and 9 activities plan at the design stage after sufficient consideration of the local identities of these region and coupled national plans for surrounding areas. Finally, Eco-tourism with the several coupled network-wise touristic courses, namely PERTH model, has been proposed after thorough analysis of the local identities by the Jahari window to make local economy being activated. Detailed descriptions for 3 strategies and 9 activities plan for declaration of Eco-dam and proposal of Eco-tourism with the network-wise touristic courses will be mentioned in the main content.

  • PDF

Comparison of the Building Envelope Design Elements between Green Building Design Guidelines and Green Building Certification Criteria - Focus on public institution relocation projects - (녹색건축물 디자인가이드라인과 녹색건축 인증 비교를 통한 외피계획요소에 관한 연구 - 공공기관 지방이전 건축물을 중심으로 -)

  • Kim, So-Young;Hwang, Sung-Pil;Oh, Joon-Gul
    • KIEAE Journal
    • /
    • v.14 no.4
    • /
    • pp.61-68
    • /
    • 2014
  • Due to rapid climate changing and the need for energy conservation, environment friendly initiatives have emerged, and regulations to support establishment of green structures in construction have been legislated and enacted. In this study, the supporting of green build method act for rapid climate change and energy conservation. Using green build method, protecting surrounding ecosystem and developing green building continuously, I suggest alternative for protection of the environment. Identifies Envelope Design Elements among various construction Green Building Design Guidelines. Green buildings that we extract the Green Building envelope design from Design Guideline, select the object building through the green buildings examples of public institution relocation projects. Since then analyzes the planned schematic design and Green Envelope Design Elements and Green Building Certification(G-SEED). So, that future directions for planning correlation of Green Building and Design Guidelines about Green Design Elements Can be presented.

Derivation of Design Flood Using Multisite Rainfall Simulation Technique and Continuous Rainfall-Runoff Model

  • Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.540-544
    • /
    • 2009
  • Hydrologic pattern under climate change has been paid attention to as one of the most important issues in hydrologic science group. Rainfall and runoff is a key element in the Earth's hydrological cycle, and associated with many different aspects such as water supply, flood prevention and river restoration. In this regard, a main objective of this study is to evaluate design flood using simulation techniques which can consider a full spectrum of uncertainty. Here we utilize a weather state based stochastic multivariate model as conditional probability model for simulating the rainfall field. A major premise of this study is that large scale climatic patterns are a major driver of such persistent year to year changes in rainfall probabilities. Uncertainty analysis in estimating design flood is inevitably needed to examine reliability for the estimated results. With regard to this point, this study applies a Bayesian Markov Chain Monte Carlo scheme to the NWS-PC rainfall-runoff model that has been widely used, and a case study is performed in Soyang Dam watershed in Korea. A comprehensive discussion on design flood under climate change is provided.

  • PDF

Developing an Organization Model through the analysis of Organization Characteristics and Management Performances of Domestic Large Construction Firms (국내 대형건설기업의 조직구조 및 경영성과 분석을 통한 조직모형 개발)

  • Kim Yong-Gu;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.109-116
    • /
    • 2004
  • Recently, many korean construction companies have faced many environmental changes and demands for external changes. This demand for external changes is necessary for all companies that is under the survival of fittest. The internal/external of environmental changes affect the organizations of company largely, and these management organizations have relation with the corporate of management performance closely. In response to that, to be adapted to the environmental change and to raise the corporate of management performance, the construction companies have tried to change the organizations such as organization re-design, organization re-build, organization innovation. Because the organizational structure that is preventive in the growth of companies bring a negative effect, the companies need to have the effective organizations to raise the corporate value. The effective organizations could be used the important indicator that builds the corporate goals and manages the organizations. Also, the organization development and organization management can prepare for environmental changes can be the important base to increase the management performance. Therefore, After surveying and analyzing the character of organization structure in respect to the OLC, this study present the Organization Structure Model that can design the appropriate organization by the growth of companies.

Research on Possible Method to Converge IT and Architectural Design Techniques for Efficient Design of Elderly Housing (효과적 고령자 주거 설계를 위한 IT와 건축 설계 기술의 융합 가능 방안 연구)

  • Bae, Hong-min;Kim, Byung-Seo
    • Journal of Internet Computing and Services
    • /
    • v.17 no.4
    • /
    • pp.87-93
    • /
    • 2016
  • Since aging population in Korea is rapidly progressing, the need for improving the life quality of the elderly has been increasing. Accordingly, in order to respond in a residential environment improvement and behavior change for the elderly, architecture design and construction methods have become converted into a modular construction method and various IT systems for the elderly have been proposed. Unlike current residential design techniques for the elderly in which architectural design techniques are performed separately with IT system design, the methodology for converging architectural design techniques with IT has not been discussed and proposed. Therefore, this paper extensively studies about requirements for converging architectural design techniques with IT such as elderly behavior, residential IT Service plan factor analysis, and residential modular construction method including IT services.

A Study on the Expansion Joint of Concrete Lining and Duct in a Tunnel (터널 콘크리트 라이닝 및 공동구 신축이음 설치방안에 관한 연구)

  • Son, Moorak;Park, Yangheum;Park, Yunjae;Kim, Jaegyoun;Yoon, Jongcheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.3
    • /
    • pp.39-50
    • /
    • 2015
  • The installation of the expansion joints in a tunnel concrete lining and duct would minimize the cracking at the location of structural shape and stiffness change, differential settlement, big temperature change, and so on. However, it is difficult to determine the required spacing of the expansion joint in a tunnel concrete lining and duct quantitatively because the spacing is influenced by temperature change, structure construction condition, ground-structure interaction, and etc. Nevertheless, a highway specification (Korea Expressway Corporation, 2012) or a road design manual (Ministry of Land, Transport and Maritime Affairs, 2010) specifies that the expansion joint spacing in a tunnel concrete lining should be installed uniformly smaller than 25 m from the tunnel portals to 50 m inside of a tunnel and elsewhre 20-60 m in a tunnel (because there is no specifcation for a duct it is assumed that a duct follows the specfication of lining). This specification results in several construction and economic problems in relation with a tunnel construction. Accordingly, in order to minimize the problems, this study analyzed both domestic and foreign design standards and specifications. In addition, field test, theoretical and numerical analyses were carried out in relation to the expansion joint in a tunnel lining and duct. The purpose of this study is to reestabilish a criterion for installing the expansion joint in a tunnel concrete lining and duct.

Comparative Study of Flow Profiles & Discharge due to Rainfall Frequency Analysis (강우빈도 해석을 통한 하천 수리$\cdot$수문량 비교 연구)

  • Seo Kyu Woo;Lee In Rock;Won Chang Hee;Shim Bong Joo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1533-1537
    • /
    • 2005
  • The recent rainfall has happened to exceed the design rainfall after 1990 often, due to the characteristic of the rain to be changed. So, it is failing the ability safety of flood defense equipments to exist. This study analyzed the rainfall of Busan in 2003 since 1961 through the FARD2002(Frequency Analysis of Rainfall Duration). The result is equal to the thing which the design rainfall increased a little since 1991. The change of design rainfall created the result to be a flood discharge increase. This study investigated about the impact to influence on the river bank according to the change of flood discharge, the rainfall pattern change as well. This study used the program of HEC-RAS with HEC-HMS and calculated flood discharge with flood level of river. The result is equal to the thing which the computation became a flood level which exceed 50year(River design criteria-Korea water resources association 2002) criteria with 30year(River establishment criteria-Ministry of construction & transportation 1993), because of an area of impermeability increased of model basin.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms (BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구)

  • Lee, Jin-Hee;Jun, Han-Jong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.6
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

The Application Technology of Korean-style R&D in Verification for deploying the Neo-Korean Style Public Building - Focused on the positivistic case R&D Technologies in Neo-Korean Style Public building

  • Kim, Young-Hoon;Peck, Yoo-Jung;Park, Joon-Young
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.5-13
    • /
    • 2017
  • Purpose: This study, by comprehensively the characteristics of new Hanok application techniques with the proposed site application technology in the course of the design changes that have been accumulated through Hanok technology development the second stage business, by analyzing the range of reflection, new Considering the direction reflects the efficiency of the new Hanok application techniques. Method: new Hanok application technology, it was been established through research and development of large 1 new Hanok technology it has been proposed through the "site-specific application techniques" and 2 builders and designers "space-time proposed technique" Analysis of the case, at the center of the design changes, the land the body of laws and regulations, the requirements of the public buildings, compared to the construction method and the like for the reduction of construction costs, new Hanok applied technology in the process of change by it There was analyzed whether acceleration on the range and step which is reflected in the design Result: The result of new Hanok applied technology was built through the demonstration build business case, process another major technology, foundation, woodwork, walls, roof, has been reflected in the ceiling construction, the inclusion of items in the proposed technique of construction , it was applied to the main steps in general, except for other construction work landscaping. Application techniques and construction proposal technology research team has presented, show the difference between the scope and method. With significance effort to improve the unreasonable traditional methods of these core processes that can be reflected in the field repeated the construction proposed technique as a result of the utility that can be applied for substantial construction.