Proceedings of the Korea Water Resources Association Conference
/
2004.05b
/
pp.134-147
/
2004
Theses days, there are 3 prerequisites for dam building in Korea: First one is how to build the dam safe and stable from the technical points of view. Second one is how to design and construct the dam environmentally sound with the minimum change of the surrounding area of the dam site. Third one is how to activate the local economy of the surrounding area of the dam site in order to make the dam construction sustainable from the social and economical points of view. As far as technical aspects far dam building, there are hardly any problems in dam design and construction in our country. However, there are a little difficulty according to the location of the dam site. In order to fulfill the second option it is believed that a lot of effort should be made to accomplish the second task not only because that fairly large area shall be inundated with water after impounding but also because that ecological environments shall be changed due to change of water environment. Therefore, thoughtful investigation and assessment of the environmental features of the local regions have to be preceded before starting of the dam building. In order to overcome these difficulties Hantan river dam has been declared as an Eco-dam with 3 strategies and 9 activities plan at the design stage after sufficient consideration of the local identities of these region and coupled national plans for surrounding areas. Finally, Eco-tourism with the several coupled network-wise touristic courses, namely PERTH model, has been proposed after thorough analysis of the local identities by the Jahari window to make local economy being activated. Detailed descriptions for 3 strategies and 9 activities plan for declaration of Eco-dam and proposal of Eco-tourism with the network-wise touristic courses will be mentioned in the main content.
Due to rapid climate changing and the need for energy conservation, environment friendly initiatives have emerged, and regulations to support establishment of green structures in construction have been legislated and enacted. In this study, the supporting of green build method act for rapid climate change and energy conservation. Using green build method, protecting surrounding ecosystem and developing green building continuously, I suggest alternative for protection of the environment. Identifies Envelope Design Elements among various construction Green Building Design Guidelines. Green buildings that we extract the Green Building envelope design from Design Guideline, select the object building through the green buildings examples of public institution relocation projects. Since then analyzes the planned schematic design and Green Envelope Design Elements and Green Building Certification(G-SEED). So, that future directions for planning correlation of Green Building and Design Guidelines about Green Design Elements Can be presented.
Proceedings of the Korea Water Resources Association Conference
/
2009.05a
/
pp.540-544
/
2009
Hydrologic pattern under climate change has been paid attention to as one of the most important issues in hydrologic science group. Rainfall and runoff is a key element in the Earth's hydrological cycle, and associated with many different aspects such as water supply, flood prevention and river restoration. In this regard, a main objective of this study is to evaluate design flood using simulation techniques which can consider a full spectrum of uncertainty. Here we utilize a weather state based stochastic multivariate model as conditional probability model for simulating the rainfall field. A major premise of this study is that large scale climatic patterns are a major driver of such persistent year to year changes in rainfall probabilities. Uncertainty analysis in estimating design flood is inevitably needed to examine reliability for the estimated results. With regard to this point, this study applies a Bayesian Markov Chain Monte Carlo scheme to the NWS-PC rainfall-runoff model that has been widely used, and a case study is performed in Soyang Dam watershed in Korea. A comprehensive discussion on design flood under climate change is provided.
Korean Journal of Construction Engineering and Management
/
v.5
no.5
s.21
/
pp.109-116
/
2004
Recently, many korean construction companies have faced many environmental changes and demands for external changes. This demand for external changes is necessary for all companies that is under the survival of fittest. The internal/external of environmental changes affect the organizations of company largely, and these management organizations have relation with the corporate of management performance closely. In response to that, to be adapted to the environmental change and to raise the corporate of management performance, the construction companies have tried to change the organizations such as organization re-design, organization re-build, organization innovation. Because the organizational structure that is preventive in the growth of companies bring a negative effect, the companies need to have the effective organizations to raise the corporate value. The effective organizations could be used the important indicator that builds the corporate goals and manages the organizations. Also, the organization development and organization management can prepare for environmental changes can be the important base to increase the management performance. Therefore, After surveying and analyzing the character of organization structure in respect to the OLC, this study present the Organization Structure Model that can design the appropriate organization by the growth of companies.
Since aging population in Korea is rapidly progressing, the need for improving the life quality of the elderly has been increasing. Accordingly, in order to respond in a residential environment improvement and behavior change for the elderly, architecture design and construction methods have become converted into a modular construction method and various IT systems for the elderly have been proposed. Unlike current residential design techniques for the elderly in which architectural design techniques are performed separately with IT system design, the methodology for converging architectural design techniques with IT has not been discussed and proposed. Therefore, this paper extensively studies about requirements for converging architectural design techniques with IT such as elderly behavior, residential IT Service plan factor analysis, and residential modular construction method including IT services.
The installation of the expansion joints in a tunnel concrete lining and duct would minimize the cracking at the location of structural shape and stiffness change, differential settlement, big temperature change, and so on. However, it is difficult to determine the required spacing of the expansion joint in a tunnel concrete lining and duct quantitatively because the spacing is influenced by temperature change, structure construction condition, ground-structure interaction, and etc. Nevertheless, a highway specification (Korea Expressway Corporation, 2012) or a road design manual (Ministry of Land, Transport and Maritime Affairs, 2010) specifies that the expansion joint spacing in a tunnel concrete lining should be installed uniformly smaller than 25 m from the tunnel portals to 50 m inside of a tunnel and elsewhre 20-60 m in a tunnel (because there is no specifcation for a duct it is assumed that a duct follows the specfication of lining). This specification results in several construction and economic problems in relation with a tunnel construction. Accordingly, in order to minimize the problems, this study analyzed both domestic and foreign design standards and specifications. In addition, field test, theoretical and numerical analyses were carried out in relation to the expansion joint in a tunnel lining and duct. The purpose of this study is to reestabilish a criterion for installing the expansion joint in a tunnel concrete lining and duct.
Seo Kyu Woo;Lee In Rock;Won Chang Hee;Shim Bong Joo
Proceedings of the Korea Water Resources Association Conference
/
2005.05b
/
pp.1533-1537
/
2005
The recent rainfall has happened to exceed the design rainfall after 1990 often, due to the characteristic of the rain to be changed. So, it is failing the ability safety of flood defense equipments to exist. This study analyzed the rainfall of Busan in 2003 since 1961 through the FARD2002(Frequency Analysis of Rainfall Duration). The result is equal to the thing which the design rainfall increased a little since 1991. The change of design rainfall created the result to be a flood discharge increase. This study investigated about the impact to influence on the river bank according to the change of flood discharge, the rainfall pattern change as well. This study used the program of HEC-RAS with HEC-HMS and calculated flood discharge with flood level of river. The result is equal to the thing which the computation became a flood level which exceed 50year(River design criteria-Korea water resources association 2002) criteria with 30year(River establishment criteria-Ministry of construction & transportation 1993), because of an area of impermeability increased of model basin.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.34
no.3
/
pp.61-68
/
2018
As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.
As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.
Purpose: This study, by comprehensively the characteristics of new Hanok application techniques with the proposed site application technology in the course of the design changes that have been accumulated through Hanok technology development the second stage business, by analyzing the range of reflection, new Considering the direction reflects the efficiency of the new Hanok application techniques. Method: new Hanok application technology, it was been established through research and development of large 1 new Hanok technology it has been proposed through the "site-specific application techniques" and 2 builders and designers "space-time proposed technique" Analysis of the case, at the center of the design changes, the land the body of laws and regulations, the requirements of the public buildings, compared to the construction method and the like for the reduction of construction costs, new Hanok applied technology in the process of change by it There was analyzed whether acceleration on the range and step which is reflected in the design Result: The result of new Hanok applied technology was built through the demonstration build business case, process another major technology, foundation, woodwork, walls, roof, has been reflected in the ceiling construction, the inclusion of items in the proposed technique of construction , it was applied to the main steps in general, except for other construction work landscaping. Application techniques and construction proposal technology research team has presented, show the difference between the scope and method. With significance effort to improve the unreasonable traditional methods of these core processes that can be reflected in the field repeated the construction proposed technique as a result of the utility that can be applied for substantial construction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.