• Title/Summary/Keyword: central pillar

Search Result 31, Processing Time 0.023 seconds

A Study on the Restoration of the Wangheungsa Temple's Wooden Pagoda (왕흥사 목탑의 복원 연구)

  • Kim, Kyeong-Pyo;Sung, Sang-Mo
    • Journal of architectural history
    • /
    • v.19 no.3
    • /
    • pp.7-29
    • /
    • 2010
  • The form of the Wangheungsa Temple's wooden pagoda site is that of the traditional form of the wooden pagodas constructed during the Baekjae Period. Likewise, it is an important ruin for conducting research on the form and type of the wooden pagodas constructed during the Baekjae Period. In particular, the method used for the installation of the central pillar's cornerstone is a new technique. The purpose of this research is to restore the ruin of the Wangheungsa Temple's wooden pagoda of the Baekjae Period that remains at the Wangheungsa Temple's wooden pagoda site. Until now, research conducted on the wooden pagoda took place mostly centered on the Hwangryongsa Temple's wooden pagoda. Meanwhile, the reality concerning Baekjae's wooden pagoda is one in which there were not many parallel cases pertain to the design for restoration. This research paper wants to conduct academic examination of the Wangheungsa Temple's wooden pagoda to organize the intention of design and design process in a simple manner. This research included review of the Baekjae Period's wooden pagoda related ruins and the review of the existing wooden pagoda ruin to analyze the wooden pagoda construction technique of the era. Then, current status of the Wangheungsa Temple's wooden pagoda site is identified to define the characteristics of the wooden pagoda, and to set up the layout format and the measure to estimate the size of the wooden pagoda in order to design each part. Ultimately, techniques and formats used for the restoration of the wooden pagoda were aligned with the wooden pagoda of the Baekjae Period. Basically, conditions that can be traced from the current status of the Wangheungsa Temple site excavation using the primary standards as the standard. Wangheungsa Temple's wooden pagoda was designed into the wooden pagoda of the Baekjae's prosperity phase. The plane was formed into $3{\times}3$ compartments to design into three tier pagoda. The height was decided by factoring in the distance between the East-West corridors, size of the compartment in the middle, and the view that is visible from above the terrace when entering into the waterway. Basically, the origin of the wooden structure format is based on the Goguryeo style, but also the linkage with China's southern regional styles and Japan's ancient wooden pagoda methods was factored in. As for the format of the central pillar, it looks as if the column that was erected after digging the ground was used when setting up the columns in the beginning. During the actual construction work of the wooden pagoda, central pillar looks as if it was erected by setting up the cornerstone on the ground. The reason that the reclaimed part of pillar that use the underground central cornerstone as the support was not utilized, was because the Eccentric Load of the central pillar's cornerstone was factored in the state of the layers of soil piled up one layer at a time that is repeated with the yellow clay and sandy clay and the yellow clay that were formed separately with the $80cm{\times}80cm$ angle at the upper part of the central pillar's cornerstone was factored in as well. Thus, it was presumed that the central pillar was erected in the actual design using the ground style format. It is possible to presume the cases in which the reclaimed part of pillar were used when constructed for the first time, but in which central pillar was installed later on, after the supplementary materials of the underground column is corroded. In this case, however, technique in which soil is piled up one layer at a time to lay down the foundation of a building structure cannot be the method used in that period, and the reclamation cannot fill up using the $80cm{\times}80cm$ angle. Thus, it was presumed that the layers of soil for building structure's foundation was solidified properly on top of the central pillar's cornerstone when the first wooden pagoda construction work was taking place, and that the ground style central pillar was erected on its upper part by placing the cornerstone once again. Wangheungsa Temple's wooden pagoda is significant from the structure development aspect of the Korean wooden pagodas along with the Hwangryongsa Temple's wooden pagoda. Wangheungsa Temple's wooden pagoda construction technique which was developed during the prosperity phase of the Baekjae Period is presumed to have served as a role model for the construction of the Iksan Mireuksa Temple's wooden pagoda and Hwangryongsa Temple's wooden pagoda. With the plan to complement the work further by excavating more, the basic wooden pagoda model was set up for this research. Wangheungsa Temple's wooden pagoda was constructed as at the Baekjae Kingdom wide initiative, and it was the starting point for the construction of superb pagoda using state of the art construction techniques of the era during the Baekjae's prosperous years, amidst the utmost interest of all the Baekjae populace. Starting out from its inherent nature of enshrining Sakyamuni's ashes, it served as the model that represented the unity of all the Baekjae populace and the spirit of the Baekjae people. It interpreted these in the most mature manner on the Korean peninsula at the time.

Failure pattern of large-scale goaf collapse and a controlled roof caving method used in gypsum mine

  • Chen, Lu;Zhou, Zilong;Zang, Chuanwei;Zeng, Ling;Zhao, Yuan
    • Geomechanics and Engineering
    • /
    • v.18 no.4
    • /
    • pp.449-457
    • /
    • 2019
  • Physical model tests were first performed to investigate the failure pattern of multiple pillar-roof support system. It was observed in the physical model tests, pillars were design with the same mechanical parameters in model #1, cracking occurred simultaneously in panel pillars and the roof above barrier pillars. When pillars 2 to 5 lost bearing capacity, collapse of the roof supported by those pillars occurred. Physical model #2 was design with a relatively weaker pillar (pillar 3) among six pillars. It was found that the whole pillar-roof system was divided into two independent systems by a roof crack, and two pillars collapse and roof subsidence events occurred during the loading process, the first failure event was induced by the pillars failure, and the second was caused by the roof crack. Then, for a multiple pillar-roof support system, three types of failure patterns were analysed based on the condition of pillar and roof. It can be concluded that any failure of a bearing component would cause a subsidence event. However, the barrier pillar could bear the transferred load during the stress redistribution process, mitigating the propagation of collapse or cutting the roof to insulate the collapse area. Importantly, some effective methods were suggested to decrease the risk of catastrophic collapse, and the deep-hole-blasting was employed to improve the stability of the pillar and roof support system in a room and pillar mine.

A Study on The Common Form of Timber Framework of Folk House in Yeosu City (여수지역 재래 민가(在來 民家) 가구(架構) 구성의 공통형에 관한 연구)

  • Park, Chan;Watanabe, Masahiro;Kim, Jeong-Gyun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.19 no.4
    • /
    • pp.67-75
    • /
    • 2017
  • This paper overall and systematically investigates of basic design know-how on commonly indwelling timber framework in a folk house in Yeosu area. in other words, Setting the goal of 'investigates of common form of timber framework', and for this goal, surveyed and analyzed for folk house a lot of findable in Yeosu area. As a result, elicits for four types plural common form((1) 4 front 'kan' - a hipped roof construction - front 'toi'/3 'ryang' - no central pillar/side beam type, (2) 4 front 'kan' - a hipped roof construction - front 'toi'/3 'ryang' - one side central pillar/central side beam type, (3) 4 front 'kan' - a hipped roof construction - front/back 'toi'/2'kozu'5'ryang' - no central pillar/side beam type, (4) 4 front 'kan' - a hipped roof construction - front/back 'toi'/'2kozu'5'ryang' - one side central pillar/central side beam type). Common form is at that time, so commonly located in the head of the technician that a form that play an exemplary role in design, or it is concretely assumed for commonly aimed form. in other words, Common form is come into existence on premise for basic design data. Documentation of folk house design know-how is done through this, and the base design and specification of korean private house is written in the contents divided into by areas.

Post-pillars design for safe exploitation at Trepça hard rock mine (Kosovo) based on numerical modeling

  • Ibishi, Gzim;Genis, Melih;Yavuz, Mahmut
    • Geomechanics and Engineering
    • /
    • v.28 no.5
    • /
    • pp.463-475
    • /
    • 2022
  • In the mine exploitation stage; one of the critical issues is the stability assessment of post-pillars. The instability of post-pillars leads to serious safety hazards in mining operations. The focus of this study is to assess the stability of post-pillars in the 130# stope in the central ore body at Trepça hard rock mine by employing both conventional (i.e., critical span curve) and numerical methods (i.e., FLAC3D). Moreover, a new numerical based index (i.e., Pillar Yield Ratio-PYR) was proposed. The aim of PYR index is to determine a border line between stable, potentially unstable, and failure state of post-pillars at a specific mine site. The critical value of pillar width to height ratio is 2.5 for deep production stopes (e.g., > 800 m). Results showed that pillar size, mining height and mining depth significantly have affected the post-pillar stability. The reliability of numerical based index (i.e., PYR) is verified based on empirical underground pillar stability graph developed by Lunder, 1994. The proposed pillar yield ratio index and pillar stability graph can be used as a design tool in new mining areas at Trepça hard rock mine and for other situations with similar geotechnical conditions.

Behavior of 2 Arch Tunnel in Sand (사질토지반에서 2 Arch 터널의 거동)

  • Lee, Sang-Duk;Cheon, Eun-Sook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.171-182
    • /
    • 2004
  • This study is focused on finding out the mechanical behavior of pillars and the ground adjacent to the tunnel depending on the central tunnel size and the invert during the construction of 2 arch tunnels in the sandy ground. Model tests were performed in the trap door system, which was composed of 3 separately movable plates. Central pillar was installed on the central movable plate to measure the pillar loads during the excavation of pilot tunnel and the main tunnel. The load-transfer and the loosening load were measured at the bottom plates adjacent to the 2 arch tunnels. The ground settlement and displacement of the tunnel lining were also measured. As results, not only pillar load but also the load transfer mechanism was influenced by the construction sequences, central tunnel size, and the invert.

  • PDF

Interaction between two neighboring tunnel using PFC2D

  • Sarfarazi, V.;Haeri, Hadi;Safavi, Salman;Marji, Mohammad Fatehi;Zhu, Zheming
    • Structural Engineering and Mechanics
    • /
    • v.71 no.1
    • /
    • pp.77-87
    • /
    • 2019
  • In this paper, the interaction between two neighboring tunnel has been investigated using PFC2D. For this purpose, firstly calibration of PFC was performed using Brazilian experimental test. Secondly, various configuration of two neighboring tunnel was prepared and tested by biaxial test. The maximum and minimum principle stresses were 0.2 and 30 MPa respectively. The modeling results show that in most cases, the tensile cracks are dominant mode of cracks that occurred in the model. With increasing the diameter of internal circle, number of cracks decreases in rock pillar also number of total cracks decreases in the model. The rock pillar was heavily broken when its width was too small. In fixed quarter size of tunnel, the crack initiation stress decreases with increasing the central tunnel diameter. In fixed central tunnel size, the crack initiation stress decreases with increasing the quarter size of tunnel.

Thermo-mechanical simulations of pillar spalling for in-situ heater test by FRACOD

  • Lee Hee-Suk;Shen Baotang;Mikael Rinne
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.244-251
    • /
    • 2003
  • A two-dimensional BEM code, $FRACOD^{2D}$, was applied to simulate fracture initiation and propagation processes in a rock pillar during an in situ heater test of a rock pillar planned at the $\"{A}sp\"{o}$ Underground Rock laboratory of SKB, in Southern Sweden. To take the advantage of conventional BEM for simulating fracturing processes, but without efforts for domain integral transformation, a hybrid approach is developed to simulate the fracturing processes in rock pillar under coupled thermo-mechanical loading. The code FRACOD was used for simulating the fracture initiation and propagation processes with its boundary tractions reflecting the effects of the initial and redistributed thermomechanical stresses in the domain of interest at multiple excavation and heating steps were produced by a special algorithm of stress inversion, based on resultant thermo-mechanical stress fields at each excavation and heat loading step by a FEM code without considering fracturing processes. This hybrid approach can take the advantages of both types of numerical methods and avoids their shortcomings for fracturing process simulation and domain effects, respectively. In this paper, we present the hybrid approach for the stress, displacements, and fracturing processes at sequential excavation and heating steps of the in situ heater test as a predictive modelling, the formulation of the fracturing models and the predictive results. Two sections of borehole depth, 0.5 m and 1.5 m below the tunnel floor are considered. The pillar area is modelled with the FRACOD and the stress field produced by excavation and heating is transferred with corresponding boundary stresses. From the modelling results, the degree of fracturing and damage are evaluated for 120 days of heating. Dominated shear fracturing in the vicinity of the central pillar was observed from the models at both sections, but spalled area appears to be limited. Based on the modelling results, a sensitivity study for the effect of pre-existing fractures in the vicinity of the holes is also conducted, and the initiation and evolution of EDZ around the deposition holes are investigated using this particular numerical technique.

  • PDF

A Numerical Study on the Reinforcement Method of a Pillar Using Tension Bolts at the Connecting Part between 2-Arch Tunnels and Parallel Tunnels (2-Arch 터널과 병렬 터널 접속부에서의 텐션볼트를 사용한 필라 보강 방법에 대한 수치해석)

  • Park, Yeon-Jun;Choi, Jae-Jin
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.470-486
    • /
    • 2015
  • Two-arch tunnels require minimal spacing between the 2 tunnels and thus occupy small amount of land compared to parallel tunnels. But it is rather expensive. The parallel tunnel is not as expensive, but it requires more land than 2-arch tunnels. This may cause a problem when there is a land shortage. The new design is to connect these two types of tunnels by another pair of parallel tunnels where the separation distance is gradually increasing. The applicability of this new design to the cases where rock condition is not even fair has to be verified since the width of the pillar between the connecting tunnels can be quite narrow. Therefore both two and three dimensional numerical analyses were conducted and pillar stability was examined for rock classes IV and V in two different ways. Results showed that this new design is still effective for poor rock conditions if central pillar is properly reinforced by tension bolts as long as overburden is less than five times of the tunnel diameter.

A study on the longitudinal optimum separated distance of tunnel face in 2-arch tunnel (2-Arch 터널의 막장면 종방향 적정 이격거리에 관한 연구)

  • Lee, Min-Kyu;Jeong, Ji-Su;Lee, Sung-Ki;Lee, Seung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.4
    • /
    • pp.323-330
    • /
    • 2007
  • Recently, due to the effective land utilization and environmental protection, the construction of 2-arch tunnel has been gradually increased. In spite of this tendency, the mechanical information for the 2-arch tunnel, especially such as its behavior characteristics and mechanism are not enough. Therefore in this study, the theoretical and numerical studies on the behavior characteristics of 2-arch tunnel are carried out and longitudinal optimum separated distance of tunnel face is proposed by considering the analysis results from the behavior of advanced excavation of tunnel and stress of central pillar. As a result, longitudinal optimum separated distance of tunnel face is in 0.5D for the better safety of 2-arch tunnel by rapidly decreasing the stress concentration of central pillar.

  • PDF