• Title/Summary/Keyword: center management system

Search Result 3,531, Processing Time 0.033 seconds

A Study On Database improvement Of The Power System Protection Program(II) (계통보호 정정 프로그램의 데이터베이스 개선에 관한 연구(II))

  • Kim, S.H.;Lee, S.J.;Choi, M.S.;Min, B.U.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.302-304
    • /
    • 2003
  • This paper presents the methods to solve the problem about Power System Protection Program(PROSET). PROSET is a overall program system to protect power system and correct it. In the context of the PROSET, it is so difficult to edit database data when topology is changed. When the renewal of data is performed, all changed values are disappeared. Therefore, it will not be expected to know the present situation by using the information of the databases data. So it is necessary to solve this problem. Solution is copy of the user. Database of GRL,GRZ,KYP2D1,KYD2X1,L90 Relay module were developed. We made a database management system for PROSET, therefore I will show this management system briefly.

  • PDF

Korean Morphology Analysis Implementation for Information Retrieval (정보검색용 한국어 형태소분석기 구현)

  • Son, So-Hyun;Yu, Byung-Sun;Lee, Tak-Hyun;Moon, Byung-Ju;Hong, Gi-Che;Jung, Hyun-Su
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2000.10a
    • /
    • pp.379-382
    • /
    • 2000
  • 본 논문은 정보검색을 위한 형태소분석기를 소개한다. 검색엔진의 속도향상을 지향한다면 형태소분석 알고리즘과 참조하는 사전의 구조를 어떻게 구성하는가에 따라 처리속도에 상당한 변화를 기대할 수 있으며, 본 논문에서는 알고리즘으로 최장일치법을 이용하고, 사전내부구조로 AVL+Trie 구조를 이용하여 사전참조의 속도향상을 기대하였다.

  • PDF

A Study on Development of Framework Based BIM Guideline System (BIM지침의 통합관리를 위한 구조화에 관한 연구)

  • Han, Jisu;Lee, Seip;Jo, Chanwon;Kim, Gutaek;Cho, Joowon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.210-219
    • /
    • 2015
  • As various contractors have been asking BIM data in the construction industry, BIM guidelines and standards has become increasingly important these days. Above all, BIM guidelines should be established properly because it is utilized at the earliest stage of BIM data creation. However, each of the existing BIM guidelines was totally different by contractors, disciplines or phases so that it caused problems about repetitious work, inefficient management and so on. In order to overcome these problems, we suggest integrated management system for BIM guidelines. We firstly collected and analyzed existing guidelines, secondly standardized guideline phrases and lastly constructed data structure of integrated management system. This integrated management system is expected to increase work efficiency to avoid working error for designers and enable easy creation or revision of BIM guidelines for contractors.

Extraction of PCBs by Subcritical Water Extraction (Subcritical Water Extraction에 의한 PCBs 추출)

  • Kwak, Dong Hwan;Moon, Ji Yong;Lee, Sung In;Jeong, Gi Ho
    • Analytical Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.511-519
    • /
    • 2000
  • Water in the supercritical state ($T{\geq}374^{\circ}C$, $p{\geq}221$ atm) is a good solvent for nonorganic pollutants, but it is extremely corrosive. Subcritical Water Extraction (SWE) is a very fast and an efficient method to extract nonpolar environmental pollutants adsorbed on the sediments and soils. Many nonpolar organic compounds are sufficiently soluble to be extracted to the water under subcritical conditions. Complete extraction of PCBs from the sediments and soils takes only a few minutes by applying SWE with the subcritical water at 50 atm and at $260^{\circ}C$.

  • PDF

Manufacturing System Design on the Introduction of ERP System (ERP 시스템 도입과정에서 생산시스템 설계방안)

  • 양광모;박재현;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.1
    • /
    • pp.105-114
    • /
    • 2002
  • Nowadays, most companies seek after the greatest profit by means of offering the goods which consumers want timely and efficiently and minimizing the cost of inventory and distribution channel which amounts to the great portion of total cost. And according as EC(Electronic Commerce) market has increased rapidly, SCM(Supply Chain Management) for EC become one of the most important facts for companies, therefore this paper suggest SCM scheme which EC, especially B to C, is added to the existing commerce system. This paper uses internet for information integration of distribution channel which is away from one another and applies TOC(Theory of Constraint)'s DBR(Drum-Buffer-Rope) Scheduling for synchronization through the whole supply chain. It is possible to synchronize the whole supply chain by means of making the speed of manufacturing and distribution to be controlled by consumer's order which is received in distribution center, and inventory and loss of sales opportunities are minimized by constant. Buffer Management. If inventories in distribution center is short, then it needs to search CCR(Capacity Constraint Resource) in supply chain and to control the speed of manufacturing and distribution according to the ability of CCR. This paper applies PT(Partial Transshipment) strategy for Delivery from distribution center to store or cyber consumer. the strategy this paper suggests chooses neighbour area from area which each distribution center takes charge, and then makes product ordered by cyber consumer which lives in the chosen area to be delivered according to inventory of distribution center.

Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems

  • Abd Elhamid, Manal S.;Ghareeb, Sahar.Sh.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.18-27
    • /
    • 2011
  • Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.

Crisis Management System in Hospitals (병원의 위기관리 시스템)

  • Kim, Hyeongjin
    • Korea Journal of Hospital Management
    • /
    • no.spc
    • /
    • pp.85-95
    • /
    • 2016
  • This study is to introduce a comprehensive framework of a crisis management system developed at a prominent hospital in South Korea. Throughout recent decades, especially in the recent years, the way in which to cope with both internal and external challenges has been one of the most critical issues. Since the incident management system in the U.S. is acknowledged as the most advanced crisis management model in the world, a portion of this study refers to the Hospital Incident Command System(HICS) provided by the California Emergency Medical Services Authority(EMSA). Nevertheless, the framework suggested in this article was designed based on a distinctive Korean hospital setting. The main contents of this study are as follows; categorization of each type of crisis, organization of a crisis management team in a non-crisis or crisis state, crisis assessment by life cycle stage, and establishment of crisis management protocol. Even though many types of crises are unspecified, those can be categorized into external crisis, medical crisis, and utility & activity failure. A crisis management organization should be operated and consisted differently- depending on a crisis or non-crisis situation. From a life-cycle perspective, the range by which the crisis should be managed extends from pre-stage to post-stage of the crisis. It is important to set proper scenarios and manuals by crisis type to develop a crisis management framework of high quality. With continuous efforts, hospitals can prepare for the uncertainty to better concentrate on core business operations.

Evaluation on Fitness between Human Resource Management System and Strategy on Subsidiary Hospitals of Medical Center (일개 의료원 산하 병원간 전략과 HR시스템의 정합성 평가)

  • Kim, Young-Hoon;Kim, Han-Sung;Woo, Jung-Sik;Kim, Hyo-Jung
    • Korea Journal of Hospital Management
    • /
    • v.17 no.1
    • /
    • pp.59-78
    • /
    • 2012
  • The purpose of this study is to evaluate on the fitting with human resource practice and strategic on 6 public hospital in the point of resource based view. At the result of this study, public strategy is not much fitted into HRM(human resource management) system, but it shows positive result of the fitting with efficiency strategy and HRM system. These results were associated with the integration of G Medical Center. Generally 6 public hospitals of the HRM system and the strategy had not been linked. They also did not achieve a great outcome. We suggest that the manager in charge of each hospital make strategies of the hospital, and then evaluates about fitting with HRM system. We hope, hereafter, it applied the analysis methods that evaluates it with financing result and individual non-financial result all together.

  • PDF

A Study for Management System of Integrity PACS Data Using DICOM Object (DICOM 객체를 활용한 무결성 PACS Data 관리시스템 구현)

  • Park, Bum-Jin;Jeong, Jae-Ho;Son, Gi-Gyeong;Jung, Young-Tae;Kang, Hee-Doo
    • Korean Journal of Digital Imaging in Medicine
    • /
    • v.15 no.1
    • /
    • pp.9-20
    • /
    • 2013
  • PACS is one of the most used medical information system and share information from other hospitals through the PACS. Data integrity means zero defects data and this is a prerequisite of information system performance. but I wonder if I can trust these informations that Incorrect information from radiotechnologist's mistakes, anonymous in emergency department, Newborn baby department, modified informations at later. And Modified informations causes defect in integrity of the data. When we import, we use DICOM header not DB data. so error occurs that DB data is deferent with DICOM Header information. This paper discusses to resolve as above problem using DICOM object such as DICOM PR, SR. And propose quality management system that can guarantee the patient information and can manage exam history.

  • PDF

Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly (가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • v.34 no.6
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF