• Title/Summary/Keyword: causes for failure

Search Result 1,097, Processing Time 0.02 seconds

Power Distribution System Equipment Failure Rate Analysis for Reliability Estimation (신뢰도 평가를 위한 배전계통 설비기기 고장률 분석)

  • Lee, Hee-Tae;Kim, Jae-Chul;Moon, Jong-Fil;Park, Chang-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.370-373
    • /
    • 2004
  • The inside and outside of the country utilities considered that they focused energy and economic aspect for short-term in new environment change of restructure. but it need service reliability preservation and improvement countermeasure, that is no to use existent estimation method for reliability preservation. therefore, analyze the equipment failure rate for suitable reliability preservation through equipment failure rate analysis of power distribution r system and evaluated equipment that is composing power distribution system by the failure rate. This paper estimated failure causes and the TVFR(Time Varying Failure Rate) for main equipment that is composing power distribution system using Weibull distribution.

  • PDF

Risk Evaluation of Failure Cause for FMEA under a Weibull Time Delay Model (와이블 지연시간 모형 하에서의 FMEA를 위한 고장원인의 위험평가)

  • Kwon, Hyuck Moo;Lee, Min Koo;Hong, Sung Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.3
    • /
    • pp.83-91
    • /
    • 2018
  • This paper suggests a weibull time delay model to evaluate failure risks in FMEA(failure modes and effects analysis). Assuming three types of loss functions for delayed time in failure cause detection, the risk of each failure cause is evaluated as its occurring frequency and expected loss. Since the closed form solution of the risk metric cannot be obtained, a statistical computer software R program is used for numerical calculation. When the occurrence and detection times have a common shape parameter, though, some simple results of mathematical derivation are also available. As an enormous quantity of field data becomes available under recent progress of data acquisition system, the proposed risk metric will provide a more practical and reasonable tool for evaluating the risks of failure causes in FMEA.

Presumption on the Failures, the Causes and the Reliability of the Mist and Dust Blower (미스트기 부품의 고장실태조사에 의한 신뢰성의 예측)

  • 금동혁;최재갑
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.17 no.1
    • /
    • pp.3702-3711
    • /
    • 1975
  • This study was originated to investigate the imparired parts of the mist and dust blowers and intended to analyze the causes of their failures by the use of the Weibull probability paper. By the use of the paper, the parts which were needed to change the design, the force of the urgency, the mean time between failures of the parts and the basic causes of the troubles could be predicted. The survey showed that the following parts got out of order: (A) flexible rubber hose, (B) blowing fan, (C) lead valve, (D) piston ring. (E) crank main bearing, (F) coil in magneto and (G) needle valve in carburettor. The analysis of the survey indicated that the parts G, C, E and D were belonged to "wear-out failure", and that the mean time between failures became shorter in order as indicated above. To insure longer lives of those parts, it would be necessary to change the design and the material and to upgrade operators mechanical technique of the mist and dust blower. The failure of the parts A, B and F was classified as "randomfailure", and they did not seem to be the "wear-out" at that time. The parts B and F was evaluated as "initial failure". Quality controls and operating tests by the producer. and the operational training for users should be strengthened so as to eliminate these failures. Were the failures only in the parts A, C, D, E, F and G, it could be said that the "reliability" of the mist and dust blower would fall to 10 percent in the second year, and 50 percent of the mist and dust blowers would fail in all parts A, C, D, E, F and G before the blower would have control insect and disease in 58.2 hectares. The use of the Weibull probability paper for analyzing failures of the mist and dust blowers was effective in that it analyzed failure in the relationship between strength of the parts and users actual circumstanoes.

  • PDF

A Comparison of the Failure Mechanism for High Power Converted White LEDs(3W) (고 출력 백색 변환용 LED(3W용)의 고장메커니즘 비교)

  • Yun, Yang-Gi;Jang, Jung-Sun
    • Journal of Applied Reliability
    • /
    • v.12 no.3
    • /
    • pp.177-186
    • /
    • 2012
  • This paper presents a comparison of the failure mechanism for high power converted white LEDs(3W) with the commercially available YAG:Ce and silicate phosphor. We carry out the normal aging life test for 10,000 hours, the high temperature aging test for 8,000 hours, the high temperature and humidity aging test for 8,000 hours and the current aging testing for 5,000 hours. The optical and electrical parameters of LEDs were monitored, such as lumen, correlated color temperature (CCT), chromaticity coordinates(x, y), thermal resistance, I -V curve and spectrum intensity. The stress induced a luminous flux decay on LED in all experiments and causes a failure. So we try to find out what's a main failure mechanism for a high power LED.

clinical evaluation of chest trauma (흉부손상에 대한 임상적 고찰)

  • 문경훈
    • Journal of Chest Surgery
    • /
    • v.22 no.1
    • /
    • pp.123-133
    • /
    • 1989
  • A clinical evaluation was done on 182 cases of chest trauma which experienced at the Department of Thoracic and Cardiovascular Surgery, National Medical Center, from Sep. 1980 to Dec. 1987. 1] Of 182 cases, 125 cases resulted from non-penetrating chest trauma and 57 cases from penetrating wound. 2] The ratio of male to female was 4.87:1, and age groups between 3rd and 6th decade were 71.9%. 3] The most common causes of chest trauma were traffic accident in non-penetrating and stab wound by knife in penetrating cases. 4] Left thorax was the preferred site of chest injury. 5] The incidences of hemothorax, pneumothorax, and hemopneumothorax were 69.6% in non-penetrating and 91% in penetrating. 6] Rib fractures between 4th rib and 8th rib were 68.8% of total rib fracture cases and left side was preferred site. 7] Methods of treatment were conservative management in 24.7%, closed thoracostomy in 54.9%, open thoracotomy in 14.3%, and etc. 8] The incidence of complications, were 11.5% of total cases, and they were atelectasis [8 cases], empyema [3 cases], pneumonia [3 cases], acute renal failure [2 cases], lung abscess [1 case], and etc. 9] The overall mortality was 6%, and causes of death were hypovolemic shock, renal failure, hepatic failure, respiratory failure, septic shock, and etc.

  • PDF

A Study on Contributing Factors to Aircraft Maintenance Failure (항공정비결함에 기여하는 인적요인에 관한 연구)

  • Kim, Chun-Yong;Park, Heui-Kwan
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.25 no.3
    • /
    • pp.81-88
    • /
    • 2017
  • Aircraft maintenance failure doesn't only threaten flight safety but also causes significant economic losses such as flight delays, flight cancellations, air turn backs and diversion and so on. Therefore, the efforts should be made to detect the contributing factors that cause such maintenance failure and eliminate them. In this study, by analyzing factors contributing to system failure using the Maintenance Error Decision Aid (MEDA) model based on stochastic relations between the contribution factors, system failure and events, we will draw a improvement plan to aircraft maintenance defects.

A Case Study on the Quality Costs in a ICT Industry (ICT 산업의 품질비용 연구 사례)

  • Hwang, Gee-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.2
    • /
    • pp.106-116
    • /
    • 2012
  • This paper aims to develop the adequate quality cost model at a company which delivers ICT(information communication technology) services. One particular business unit was in the first instance selected and quality costs were then analysed at an organization level, for a department and for specific processes. Some areas were determined for quality improvement at each level and their causes were also investigated. However, the existing PAF(prevention, appraisal and failure) models reveled some limitations because the ICT services company included the different number of large and complicated business processes. The PAF model did not sufficiently highlight the detailed causes of failure costs. It did not also stimulate the relevant department's strong responsibility to improve such problems. Both micro PAF and process cost models were proposed in order to cope with this. In final, it explains the relationship between six sigma and quality costing, suggesting how to use the quality costing results as a means of promoting either continuous improvement or innovation in a case company.

A Study on the Direction of Forest Resort Development -Focusing on the Characteristics of Japan Shinrin Toshi and the Causes for its failure- (산림리조트 개발방향에 대한 고찰 -일본 산림도시의 특성과 그의 좌절요인을 중심으로-)

  • Park, Koo-Won
    • Journal of Korean Society of Rural Planning
    • /
    • v.15 no.4
    • /
    • pp.183-197
    • /
    • 2009
  • The management aggravation of forests and the increase in the demand on resorts promote the urban use of forests, and the development of forests-using resorts is becoming an important political issue. Based on this understanding, this paper purports to examine the causes for the failure of the Shinrin Toshi policy (development of living space and resorts) which Japan promoted, and also examined the future direction of the development of forest resorts in Korea. As a result of the study, it was found that the Shinrin Toshi policy of Japan was promoted through the new changes of bubble economy and forest culture theory, and various strategies for the co-existence of human beings and nature were worked out. However, the policy took precedence without concrete plan production, which was found as the direct cause for the failure. The reasons for not having concrete plan production were: the target and the resort lifestyle (who will use it and what life will be developed) were not clear; the subject of the policy was restricted to state forests; and the dependence on civil capital in the promotion of the policy was too big. Therefore, in order to make the Shinrin Toshi policy successful, concrete lifestyle how the forest resort will be used and operated - needs to be set up and resources should be concretized. For this, the concrete demand on the forest resort life and the traditional community property of forest areas will have to be examined.

A Study on the Reliability and Maintainability Analysis Process for Aircraft Hydraulic System (항공기용 유압 시스템 신뢰도 및 정비도 분석 프로세스 고찰)

  • Han, ChangHwan;Kim, KeunBae
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.1
    • /
    • pp.105-112
    • /
    • 2016
  • An aircraft must be designed to minimize system failure rate for obtaining the aircraft safety, because the aircraft system failure causes a fatal accident. The safety of the aircraft system can be predicted by analyzing availability, reliability, and maintainability of the system. In this study, the reliability and the maintainability of the hydraulic system are analysed except the availability, and therefore the reliability and the maintainability analysis process and the results are presented for a helicopter hydraulic system. For prediction of the system reliability, the failure rate model presented in MIL-HDBK-217F is used, and MTBF is calculated by using the Part Stress Analysis Prediction and quality/temperature/environmental factors described in NPRD-95 and MIL-HDBK-338B. The maintainability is predicted by FMECA(Failure Mode, Effect & Criticality Analysis) based on MIL-STD-1629A.

Reoperation after Open Heart Surgery -Clinical analysis of 27 cases- (개심술후 재수술에 대한 임상적 고찰)

  • 서의수
    • Journal of Chest Surgery
    • /
    • v.22 no.1
    • /
    • pp.50-58
    • /
    • 1989
  • The emergence and expansion of cardiac surgery over the past decade has resulted in an increasing number of patients undergoing cardiac operations but many kinds of heart surgery was realized only palliative, resulting in increasing numbers of secondary cardiac procedures. From 1978 to 1988, 10 cases of various congenital heart diseases and 17 cases of acquired heart diseases were reoperated at Hanyang University Hospital. The leading indication of second operation was residual shunt or valvular malfunction due to technical failure in congenital heart disease and primary valve failure, endocarditis, paravalvular leakage were for acquired heart disease. The mortality of reoperation was 0% for congenital heart disease and 11.7%[2 death among the 17 patients] for acquired heart disease. The leading causes of death were myocardial failure, sepsis with endocarditis, acute renal failure and congestive heart failure.

  • PDF