• Title/Summary/Keyword: building-up construction

Search Result 958, Processing Time 0.025 seconds

The Application of Post-tensioned Slab System to Tall Buildings (초고층 건축물의 포스트텐션 슬래브 시스템 적용)

  • Chung, Kwang-Ryang
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.879-882
    • /
    • 2008
  • The market of Korea of post-tension system for building is growing up since 2000 and many engineers and construction companies show interest in it. This paper introduces the structure system and construction of post-tension tall buildings including recent trend in the industry of post-tension system for buildings in Korea and the point to be considered when design post-tensioned tall building. Park Polis is composed of two towers of 39 stories with a level to the top of the roof +144m and is currently under construction at Ulsan in Korea. This building designed as the unbonded post-tension floor system and will be the tallest and first high-rise post-tensioned building in Korea. The structural system is composed of the flat slabs, perimeter columns and core walls. At first, this building had designed as regular RC flat slab with perimeter beams. However, floor structure system was reconsidered because the construction company wants to improve efficiency of construction. As a result, the floor system of PARK POLIS re-designed as PT flat slab.

  • PDF

Introduction of BIM Quality Standard for Quantity Take-off (건축 물량산출 활용을 위한 BIM품질기준 도입 방안)

  • Kwon, O-Cheol;Jo, Chan-Won;Cho, Joo-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.171-180
    • /
    • 2011
  • As high-rise and irregularly shaped building structures have become a trend at home and abroad, BIM technology is now being developed and accepted widely. However, the BIM data and information generated in the design phase cannot be actively reutilized in the construction stage. This is because the major interests of construction companies include working process and cost estimation, while there is not usually enough BIM data created to support these activities. In order to resolve this issue, we need to set up BIM modeling guides that make it possible to extract correct quantity take-off from BIM data. Quality checks are also necessary to ensure that the resulting BIM data is correct. This study suggests ways of securing BIM quality for correct quantity take-off, which is critical for BIM technology applied to the building construction process and its cost estimation.

A Study on Productivity of Foreign Labors in Domestic Apartment Construction Site -Focused on Evaluation of Productivity and Productivity Impediment Factor- (건설현장에서 외국인 노동자의 생산성에 관한 연구 -생산성 및 생산성 저해인자 평가를 중심으로-)

  • Choi, Hee-Bok;Shin, Youn-Seuk;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.75-79
    • /
    • 2005
  • The Korean society faces a new issue of accepting foreign workers. Foreign labors in construction industry reached about 400,000 recently. Thus they have become one of the essential resources to fill up insufficient labor supplies in construction industry. And it is important how to manage foreign labors efficiently. However there are few studies focused on this subject. Purpose of this study is to research productivity of foreign labors in the domestic construction site. So investigate the value of foreign labors. Also this study forecast elements effect on foreign labors productivity in the construction industry. And research what element is more important to improve productivity and what element is more difficult to manage. In the result, this study is expected to prospect effective method of foreign labor's management in the domestic construction industry, so contribute to utilize foreign labors more efficiently.

A Study on the Architectural Thought and Its Construction shown in F. L. Wright's Taliesin West' (프랭크 로이드 라이트의 '텔리에센 웨스트'의 건축화 과정에 관한 연구)

  • Park, Jong-Sung
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.3 s.62
    • /
    • pp.3-9
    • /
    • 2007
  • Taliesin West is a meaningful historic site in architecture field, because its place had still been existing only one in the world as a ideal architectural community for working and living as well as learning by doing for Taliesin Fellowships and others based on F. L. Wright's idea of Organic Architecture. The main purpose of this study was to follow up the architectural thought and its construction shown in F. L. Wright's 'Taliesin West'. A study on the key notes are as follows; 1) The key-clue of the construction background for Taliesin West was based on the project of 'Complex Campus Building' which was early planed by F. L. Wright. 2) A basic design idea for Taliesin West was admiring from its own site characters as well as the Experimental construction methods and materials. 3) Design motive of Taliesin West was based on American Indian's movable shelter which called 'Tepee.' 4) A construction of F. L. Wright's temporary studio, Ocotilla, was a good opportunity to construct for Taliesin West which construction methods, covered and framed, were same as Ocotilla. 5) A concept idea of the master plan for Taliesin West came from combining Taliesin's Hillside Home School and Complex Campus Building project. 6) Construction of Taliesin West was a final accomplished place as F. L. Wright's utopia architecture and community.

A Study on Method of Construction for Foamed Concrete adding EVA Chip that improves the Resistance of Cracking and Capability of Insulating (크랙저항성(抵抗性)과 단열성(斷熱性)을 향상(向上)시킨 EVA칩 첨가 기포콘크리트의 려공법(旅工法) 연구(硏究))

  • Lee, Jong-Shik;An, Jung-Chan;Lee, Jong-Hak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.5-9
    • /
    • 2007
  • The construction method for Foamed-Concrete has not been important due to following process of construction work. However, according to the code about enhance of energy saving design policy and impact noise, noised isolation has been used in construction site so that the resistance for cracking and capability for insulating of Foamed-Concrete has been required. Therefore, new alternatives are demanded. Optimum mixing design, which can get the improvement of insulation and resistance of crack for Foamed-Concrete adding EVA chip, was derived and also the device, applying to construction site, was invented to equalize quality. This device can measure quantity of all input and placement, and show up the sum of placement and mixing design on a touch screen. This valuable construction method is friendly environment and recycling method because of using EVA chip, by-product of an EVA insole scrap burned or embedded, as a light-weight aggregate.

  • PDF

A Study on the Development of Precast Concrete Modular and its Application Onsite (프리캐스트 콘크리트 모듈러 개발 및 현장적용에 관한 연구)

  • Bae, Kyu-Woong;Boo, Yoon-Seob;Shin, Sang-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.27-28
    • /
    • 2023
  • Currently, the Off-Site Construction (OSC) construction method, which emphasizes the minimization of field work, is being emphasized at construction sites due to the lack of construction skilled manpower, extreme weather, and the Severe Disaster Punishment Act. In this study, we developed a stacked PC modular, which is a method of stacking PC modules, and solved the lifting problem by reducing the weight of the unit module, which is emerging as the biggest disadvantage of PC modules, to around 20 tons. For the connection between modules, structural safety was secured through repeated history tests of the wall and slab connection. Walls and slabs satisfied all statutory fire resistance times through fire resistance tests, and residential performance was evaluated to be satisfactory through mock-up demonstration. The developed PC modular has been applied to the construction of commercial houses, detached houses, shopping malls, churches, etc., and has design results for many buildings such as dormitories, detached houses with 4 floors or more, and resorts, so it is expected that an atmosphere of revitalization of construction methods will be created.

  • PDF

A Basic Study on Data Estimation Model of Production-installation Using Mathematical Algorithm in Free-Form Concrete Panel (비정형 콘크리트 패널의 수학적 알고리즘을 이용한 생산-설치 데이터 생성모델 기초연구)

  • Son, Seung-Hyun;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.166-167
    • /
    • 2016
  • Unlike the past, supported by the development of digital technologies, free-form buildings are frequently designed with creative thoughts of architectural designers. However, there are some difficulties preventing successfully completion of projects, like reduced productivity and increased construction duration and cost upon the process of producing and installing concrete panels for free-form structures. In particular, there are active studies on the CNC machine for production of free-form concrete panels. Yet, it is difficult to effectively and easily come up with information on production and installation of free-form, curve-surfaced panels which are difficult to be mathematically defined. This requires a lot of manpower and time to implement the curved surfaces of free-form buildings as intended by architects. Accordingly, it needs a model that can effectively create production-installation data of free-form concrete panels for successful free-form building projects. Thus, the purpose of the study is to suggest data estimation model of production-installation using mathematical algorithm in free-form concrete panels. The study results will realize effective production and installation of free-form concrete members, allowing improved productivity of projects, reduced cost and shortened construction duration.

  • PDF

Measurements and analysis of load sharing between piles and raft in a pile foundation in clay

  • Watcharasawe, Kongpop;Jongpradist, Pornkasem;Kitiyodom, Pastsakorn;Matsumoto, Tatsunori
    • Geomechanics and Engineering
    • /
    • v.24 no.6
    • /
    • pp.559-572
    • /
    • 2021
  • This research presents the monitoring results and their interpretation on load sharing of the pile foundation during the construction of a high-rise (124 m in height) building in Bangkok, in soft clayey ground. Axial forces in several piles, pore water pressure and earth pressures beneath the raft in a tributary area were monitored through the construction period of the building. The raft of the pile foundation in soft clayey ground can share the load up to 10-20% even though the foundation was designed using the conventional approach in which the raft resistance is ignored. The benefit from the return of ground water table as the uplift pressure is recognized. A series of parametric study by 3D-FEA were carried out. The potential of utilizing the piled raft system for the high-rise building with underground basement in soft clayey ground was preliminarily confirmed.

The Classification Plan on Safety Certification System of Temporary Equipment (건설 가설재의 안전인증 분류방안)

  • Park, Sang-Wook;Park, Jun-Mo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.794-799
    • /
    • 2008
  • At the point of changing from the capacity qualification of temporary equipments for building to safety certification system, the meaning of qualification and the present state of main products are evaluated for Capacity qualification system and compare with related system in developed country. These suggest classification of temporary equipments for building construction in safety certification. Now, present state of the capacity qualification system is estimated; according to the reforming system from restating law in 2003, there are a lot of changing of application in every 3 years because of that. The ability of Making business is improved by checking again but, there are limitation to constantly keep the safety as the system to approve form about sent imitation products. Changing from the capacity qualification system to safely certification system make to include the structure of the qualification system and make a plan standard. It make least panic in the building market and set up some standards for capacity by changing building circumstance. The classification of temporary equipment for building construction in safety certification from the module of quotation form classify each duty quotation item, self-regulation safely verification item and option quotation item, these will more improve the system form and quality of temporary equipment for building than before.

  • PDF

Pilot Test of Improving Super Retarding Concrete to Control of Hydration Heat Crack of Foundation Mat Mass Concrete (기초매트 매스 콘크리트의 수화열 균열제어로서 초지연 콘크리트 활용에 관한 예비실험)

  • Noh, Sang-Kyun;Baek, Dae-Hyun;Lee, Jae-Sam;Kim, Hyun-Seob;Lee, Byeong-Hoon;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.37-41
    • /
    • 2008
  • According to the recent rapidly increasing that construction works are gradually Manhattanized mainly the grand scaled residential buildings, the foundation of the building that is related to safety is increasing for building as a grand scaled mat concrete. Because mat concrete can not be simultaneously placing of concrete in a great quantity due to the circumstance at the field, the inequal deformation of the tensile stress that according to the time lag of hydration heat between the upper layer and the lower layer is affecting as a cause that is the possibility of crack occurrence by increasing. Accordingly, this research checked the efficiency of super retard concrete in applying real structures, and we implemented the preparatory experiment to settle up the inequal deformation of the tensile stress substantially that is according to the time lag of placement between the upper layer and the lower layer by controlling the setting time using the super retarding agent. As the result of test, the more target of delay time lengthened, the more fluidity increased and air content indicated a little differences. There was from 2 to 10 hours between the standard curing and the outside curing at the setting time and in case of calculating the rate of mixing at real structure is required that mix promotion, increasing the amount of mixing, by setting up the curing temperature. The super retard concrete showed the result that in compressive strength, early-age strength was smaller than normal concrete whereas it was same or more figures from at the aging 28days because of the super retarding agent.

  • PDF