• Title/Summary/Keyword: building-up construction

Search Result 958, Processing Time 0.024 seconds

The Construction Period and the Structure of Seongjeonggak Hall, in Changdeokgung Palace (창덕궁 성정각의 건축 시기와 건축 구조)

  • Lee, Jong-Seo
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.41-52
    • /
    • 2019
  • Seongjeonggak Hall in Changdeokgung Palace, although built after the Japanese Invasion in 1592, displays the architectural style and structure of Early Joseon period. It did not include ondol (Korean floor heating system) and contained Early Joseon style window frames. Later, King Jeongjo installed ondol as he repaired the building into a more convenient office. The initial construction of Seongjeonggak Hall was based on the architectural ideology of the Early Joseon Period, which divided up the space according to the season. Thus, the initial structure of the building consisted of a joint of a one-story building and a two-story building with the top floor of the latter specialized for hot and humid season. The two-story building was called 'chimnu(寢樓)', and its top floor was called 'nu-chimsil(樓寢室)'.

A Study on the Improvement of Life Safety Codes for High Fire Risk Building Applications (II) (화재 위험성을 중심으로 한 건축물 용도별 한국형인명안전기준의 개선안 도출에 관한 연구(II))

  • Koo, In-hyuk;Kim, Hye-Won;Jin, Seung-Hyeon;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.75-76
    • /
    • 2022
  • In Korea, the occurrence and risk of similar fires are high, so setting up fire prevention measures through fire case investigation is considered the most basic measure in securing human safety. Therefore, the purpose of this study is to research status and related regulations of Life Safety Codes for High Fire Risk Building Applications In the future, using this as basic data, it is considered that additional research is need to development Human Safety Standards in Korea.

  • PDF

A Study on the Improvement of Life Safety Codes for High Fire Risk Building Applications (화재 위험성을 중심으로 한 건축물 용도별 한국형인명안전기준의 개선안 도출에 관한 연구)

  • Koo, In-Hyuk;Kim, Hye-Won;Jin, Seung-Hyeon;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.88-89
    • /
    • 2021
  • In Korea, the occurrence and risk of similar fires are high, so setting up fire prevention measures through fire case investigation is considered the most basic measure in securing human safety. Therefore, the purpose of this study is to research status and related regulations of Life Safety Codes for High Fire Risk Building Applications In the future, using this as basic data, it is considered that additional research is need to development Human Safety Standards in Korea.

  • PDF

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

A Study on the Productivity of Form Work by using Work Analysis Method (작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구)

  • Jung, Hea-kyang;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.131-137
    • /
    • 2005
  • Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

A Comparative Analysis of Operating Ratio for Reinforced Concrete Construction by Occupation classification (철근 콘크리트 공사의 직종별 가동률 비교·분석)

  • Lee, Kang-Hyup;Kim, Min-Jae;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.200-201
    • /
    • 2014
  • The construction industry in recent years, due to the multi-species engineering specialty, interest and importance of human resource management is growing. But, not many studies on the operation ratio are being proceeded due to the difficulty of casting people on site and actual survey. Thus, this study proposes the work type-specific quantitative operation ratio through work type-specific operation ratio analysis of reinforced concrete construction which takes up an important part of construction work.

  • PDF

A Study on the Measure of Productivity of Form Work (거푸집 공사의 생산성 측정에 관한 연구)

  • Jung Hea-kyang;Yun Yer-Wan;Yang Keek-young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.149-155
    • /
    • 2005
  • Lately Construction industry depressed by hard construction market condition. So Construction company, especial at this time, make more rationalize the management of inside Company and Construction field. So in this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

  • PDF

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF

Analysis of the Amount of Construction and Demolition Waste Generated by Underground Vertical Extension Methods (지하수직증축공법 적용에 따른 건설폐기물 발생량 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.273-274
    • /
    • 2021
  • This paper proposes a process to calculate the amount of construction and demolition (C&D) of underground vertical extension methods through considering the characteristics of used construction and demolished materials. The underground vertical extension methods analyzed in this paper were the bottom-up, normal top-down, and top-down methods with multi-post downward (MPD). In order to check the applicability of the proposed process, 24 illustrative examples were generated. The amount of C&D waste of the illustrative examples were calculated and compared. As the results, the top-down method with MPD was the most efficient method to reduce the amount of C&D waste.

  • PDF

A study on the Increase in Construction Cost for Zero Energy Building (제로에너지건축물의 공사비 증가분 산출에 관한 연구)

  • Shim, Hong-Souk;Lee, Sungjoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.603-613
    • /
    • 2021
  • As a core policy for achieving the goal of reducing greenhouse gas emissions in the building sector, Korea has enforced the mandatory certification of zero energy buildings for new public buildings from 2020. This study suggests energy-saving technologies and economic factors that building officials can refer to for decision-making on the implementation of zero energy buildings. For this study, the construction cost for the energy item of a building was analyzed by collecting the building energy efficiency level certification data and detailed construction cost statement data from public institutions for the last three years. Based on the building energy efficiency certification data, each energy item of the baseline building was derived, and the energy performance of the zero energy building was derived through repetitive simulations by gradually increasing the energy performance value of the baseline building. By applying the analyzed construction cost, the construction cost for each energy item of the baseline and zero energy buildings was derived. As a result, the lighting equipment contributed up to 10.5% energy savings, and the increase in construction cost of the cooling and heating system was at least 9.1%.