• Title/Summary/Keyword: building-construction algorithm

Search Result 273, Processing Time 0.036 seconds

Optimization of real-time path finding for material handling of finishing work considering the logistics flow (물류량을 고려한 마감공사 자재운반의 실시간 경로탐색 최적화 연구)

  • Kim, Wansoub;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.170-171
    • /
    • 2015
  • Resource procurement and material handling are considered as a significant part of construction project especially in large or tall building construction site. There are multiple variables that must be considered in a construction site during finishing work such as movement of materials, equipments, and workers. Therefore, it is difficult for construction workers to find the material handling path solely by intuition. The aim of this study is to propose a real-time path finding model suitable for complicated logistics flow in the field. The model explores the optimal transport path of finishing material with its basis on optimization algorithm, and it determines the direction of the Smart Sign. The proposed model is expected to be utilized for planning of efficient finishing material handling.

  • PDF

The Extraction Method of Spacial Element Cost based on the Quantity Take-Off and Bill of Quantity (건설공사의 수량산출서 및 산출내역서 기반 공간별/부위별 공사비 추출방법에 관한 연구)

  • Nam, Dong-hee;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.232-233
    • /
    • 2021
  • As construction projects become larger and more complex in the construction environment, and as the Building Information Model(BIM) is technically introduced, the demand for construction costs in units of space is increasing. Cost estimating of spacial element can reduce the error in cost prediction method based on cost of work type and to utilize the construction cost data for each space in the design phase. The purpose of this study is to extract spatial statements by utilizing spacial information of quantitative statements based on items that are common elements of the Quantity Take-Off and Bill of Quantity.

  • PDF

Real-time prediction on the slurry concentration of cutter suction dredgers using an ensemble learning algorithm

  • Han, Shuai;Li, Mingchao;Li, Heng;Tian, Huijing;Qin, Liang;Li, Jinfeng
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.463-481
    • /
    • 2020
  • Cutter suction dredgers (CSDs) are widely used in various dredging constructions such as channel excavation, wharf construction, and reef construction. During a CSD construction, the main operation is to control the swing speed of cutter to keep the slurry concentration in a proper range. However, the slurry concentration cannot be monitored in real-time, i.e., there is a "time-lag effect" in the log of slurry concentration, making it difficult for operators to make the optimal decision on controlling. Concerning this issue, a solution scheme that using real-time monitored indicators to predict current slurry concentration is proposed in this research. The characteristics of the CSD monitoring data are first studied, and a set of preprocessing methods are presented. Then we put forward the concept of "index class" to select the important indices. Finally, an ensemble learning algorithm is set up to fit the relationship between the slurry concentration and the indices of the index classes. In the experiment, log data over seven days of a practical dredging construction is collected. For comparison, the Deep Neural Network (DNN), Long Short Time Memory (LSTM), Support Vector Machine (SVM), Random Forest (RF), Gradient Boosting Decision Tree (GBDT), and the Bayesian Ridge algorithm are tried. The results show that our method has the best performance with an R2 of 0.886 and a mean square error (MSE) of 5.538. This research provides an effective way for real-time predicting the slurry concentration of CSDs and can help to improve the stationarity and production efficiency of dredging construction.

  • PDF

A study on building outline simplifications considering digital map generalizations (수치지도 작성을 위한 건물외곽선 단순화기법 연구)

  • Park, Woo-Jin;Park, Seung-Yong;Jo, Seong-Hwan;Yu, Ki-Yun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.1
    • /
    • pp.657-666
    • /
    • 2009
  • In GIS area, many line simplification algorithms are studied among generalization methods used for making the building data in the form of digital map from the original line data. On the other hand, there are few studies on the simplification algorithm considering the drawing rules of the digital map in Korea. In this paper, the line simplification algorithm based on the drawing rules is proposed as the methodology to create or update the building data of digital map by extracting the building outline from the CAD data used in construction. To confirm the usefulness of the algorithm, this algorithm and four other effective and general line simplification algorithms (e.g., Douglas-Peucker algorithm) are applied to the same building outlines. Then, the five algorithms are compared on five criteria, the satisfaction degree of the drawing rules, shape similarity, the change rate of the number of points, total length of lines, and the area of polygon. As a result, the proposed algorithm shows the 100% of satisfaction degree to the drawing rules. Also, there is little loss in four other mentioned criteria. Thus, the proposed algorithm in this paper is judged to be effective in updating the building data in digital map with construction drawings.

Basic study about Automatic Rebar Quantity Estimation Integrated with Structural Design Information (구조설계정보 통합 관리에 의한 철근 물량 산출 자동화 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.109-110
    • /
    • 2015
  • Estimation of rebar quantity may be used as an index to evaluate the economic feasibility of structural designs. However, when using the software to estimate the rebar quantity, there may be some limitations such as data loss caused by human errors and estimation delays caused by increased input time, since the information on arrangement of rebar is inserted manually. To solve the problems of such quantity estimation software, it is necessary to develop a method on automatic input/output of structural design information for quantity estimation and an algorithm for accurate estimation of rebar quantity. The purpose of this study is to improve the existing rebar quantity estimation by connecting with the database on information related to rebar estimation and the algorithm for rebar estimation, in order to develop an algorithm to estimate an accurate, net rebar quantity. The study result can be used as basic data for development of software for efficient structural designs and automatic framework estimation of buildings.

  • PDF

Basic study of algorithm for steel quantity analysis of composite precast concrete members (합성 PC 부재의 철골 물량산출 알고리즘 기초연구)

  • Kim, Gyeongju;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.96-97
    • /
    • 2014
  • Green Frame is a column-beam structure built by steel frame joints embedded in the columns and beams. Here, the steel frame embedded in the columns and beams is not a standardized product, instead it needs to be order-produced. The quantity for each steel frame size should be calculated to estimate the quantity of steel frames to be manufactured. However, it is highly time-consuming and requires a lot of effort in calculating the quantity of steel frames, for there are a wide range of steel frame types that are embedded in the columns and beams. To solve this problem, the study proposes an algorithm for calculation of the amount of steel frames with ease and promptness. When a program is developed using the algorithm proposed in the study in connection to the information on precast concrete members prepared in the design phase, it is anticipated that the manpower required as well as the manufacturing time will be decreased.

  • PDF

Structural Analysis for Building Structures reflecting Differential Column Shortening based upon Construction Sequence (시공 공정에 따른 건축 구조물의 구조해석 및 수직부재의 부등변형)

  • 조상규;이형우;최창식
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1998.10a
    • /
    • pp.333-341
    • /
    • 1998
  • The general method of structural analysis for building structures has been based upon the assumption that all dead loads are imposed on a building simultaneously throughout the entire structure. In reality, buildings are built floor by floor or a few floors at a time. The construction dead load is applied gradually onto the structure as the structure is being erected. The prevailing commercial software for structural analysis used to date have resulted in the representation of inaccurate structural behaviors. The actual construction sequence and the loading of the structure ere not properly represented in the analysis. This paper identifies the source of the errors and develops the algorithm to account for the differential column shortening due to construction dead load based upon a given construction sequence

  • PDF

An algorithm of marking line correction for robot-based layout automation of building structures

  • Lim, Hyunsu;Kim, Taehoon;Cho, Kyuman;Kim, Taehoon;Kim, Chang-Won
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.312-318
    • /
    • 2022
  • Robot-based layout automation has been recently promoted for the purpose of improving productivity and quality. Marking robots have various functional demands to secure marking precision and environmental adaptability. In particular, in order to automate marking work of building structure, correction of the marking line through position recognition of rebars placed is required. Because the rebars must maintain a constant cover thickness from the formwork surface, if the rebars are out of planned position, the rebar or marking line need to be corrected to secure the cover thickness. Thus, the marking robot for structural work needs to have the function for determining the position correction of the rebar or the marking line. In order to judge the correction of marking line, it is required to measure the distance between the planned marking line and the rebar placed. Therefore, this study proposes an algorithm that can measure the distance between the planned line and the rebar, and correct marking line for the automatic operation of the marking robot. The results of this study will be utilized as a core function for unmanned operation of the marking robot and contribute to securing precise marking by reflecting construction errors.

  • PDF

A Study on a Database Management System for Health-friendly Building Materials (건강친화형 건축자재의 DB화 연구 - 실내마감재를 중심으로 -)

  • Kwon, Gi-Deoc;Lee, Dong-Hoon;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.9 no.6
    • /
    • pp.3-11
    • /
    • 2009
  • Building materials have a great impact on the health of a building's occupants. Thus, it is imperative that their health-related properties be taken into during the course of construction project. Unfortunately, no current database system exists that can provide information on the health performance of building materials at each stage of construction project management, from planning and design to building and maintenance. therefore, an inordinate amount of time and effort is required to choose the right health-friendly materials(DBHM). To solve this problem, this study aims at building a database management system for health-friendly building materials. It analyzes the health-related properties and performance of various materials, and proposes a database structure and operation algorithm. The system proposed in this study is expected to contribute to the objective evaluation of health-friendly building materials through the accumulation of relevant data.

Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase (시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안)

  • Lee, Jae-Hyun;Jeong, Jae-Wook;Jeong, Jae-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF