• Title/Summary/Keyword: building project

Search Result 2,455, Processing Time 0.025 seconds

A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings (초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구)

  • Kim, Sang Hwan;Choy, Won Cheol;Kim, Ju Hyung;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

A Study on the composition of PFV(project financing vehicle) used in large-scale development project (대규모 개발사업에서의 PFV 구성에 관한 연구)

  • Kim, Eun-sung;Kim, Jae-jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.159-163
    • /
    • 2008
  • The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.

  • PDF

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

A Framework of Building Knowledge Representation for Sustainability Rating in BIM

  • Shahaboddin Hashemi Toroghi;Tang-Hung. Nguyen;Jin-Lee. Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.437-443
    • /
    • 2013
  • Recently, sustainable building design, a growing field within architectural design, has been emerged in the construction industry as the practice of designing, constructing, and operating facilities in such a manner that their environmental impact, which has become a great concern of construction professionals, can be minimized. A number of different green rating systems have been developed to help assess that a building project is designed and built using strategies intended to minimize or eliminate its impact on the environment. In the United States, the widely accepted national standards for sustainable building design are known as the LEED (Leadership in Energy and Environmental Design) Green Building Rating System. The assessment of sustainability using the LEED green rating system is a challenging and time-consuming work due to its complicated process. In effect, the LEED green rating system awards points for satisfying specified green building criteria into five major categories: sustainable sites, water efficiency, energy and atmosphere, materials and resources, and indoor environmental quality; and sustainability of a project is rated by accumulating scores (100 points maximum) from these five major categories. The sustainability rating process could be accelerated and facilitated by using computer technology such as BIM (Building Information Modeling), an innovative new approach to building design, engineering, and construction management that has been widely used in the construction industry. BIM is defined as a model-based technology linked with a database of project information, which can be accessed, manipulated, and retrieved for construction estimating, scheduling, project management, as well as sustainability rating. This paper will present a framework representing the building knowledge contained in the LEED green building criteria. The proposed building knowledge framework will be implemented into a BIM platform (e.g. Autodesk Revit Architecture) in which sustainability rating of a building design can be automatically performed. The development of the automated sustainability rating system and the results of its implementation will be discussed.

  • PDF

A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.4
    • /
    • pp.12-15
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

An Influence Analysis of the Social Capital and Participation Intention by the Regional Capacity Building for Rural Regional Development (농촌지역개발 지역역량강화사업이 사회적 자본형성과 사업참여의도에 미치는 영향)

  • Hwang, Young Seob;Cho, Tong Buhm
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.1
    • /
    • pp.43-56
    • /
    • 2021
  • Social capital is the basis for enabling regional development, and although it is the result of regional development that produces greater productivity through the combination of human and material capital, there is a lack of discussions in connection with rural development. This study saw that the local capacity building project affects the social capital of the local residents and such social network is realized through the rural area development project based on the participation of the residents. As a result of the analysis, the regional capacity building project has a positive influence on the social capital of the region and the willingness to participate in the project, and bridge-type social capital has shown a mediating effect on education and consulting fields. Only when local social capital, especially bridge-type social capital, is cultivated through the regional capacity building project can the project be transformed into one suitable for local conditions through active participation of residents.

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

Challenges in Structural Design of W-Project

  • Kim, Jong Soo
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.199-204
    • /
    • 2014
  • W-Project is 70-story mixed-use residential building complex project in Busan, the second biggest city in South Korea. As it is a high rise building complex located at the coast, the residents have great ocean view from the height. Though, there were many difficult challenges to be solved to secure structural safety and meet the serviceability requirements. As it is located on the reclaimed land, securing the foundation bearing capacity on soft soil is the first issue to be solved for the stable structure. W-Project. Busan on the way usual track of typhoon, wind load on structure is also critical for structural safety and serviceability for occupants due to wind vibration. This paper will address process of lateral load resisting structural system of W-Project.

Analysis of Construction Schedule Progress Management Practice (건설공사 진도관리의 현황 분석에 대한 연구)

  • Shin, Yoon-Kyung;Yun, Seok-Heon;Pack, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF