• 제목/요약/키워드: building owner

검색결과 181건 처리시간 0.034초

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 - (A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages -)

  • 이영민;이상범;김정길
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

학교시설물 유지관리비용의 다차원분석 방법 (Multi-Dimensional Analysis Method of Maintenance Cost of School Facility)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.56-57
    • /
    • 2014
  • As school facilities have been expanding quantity better than quality, efficient school facility management has been focused on from 2001 in domestic. Due to obsolescence of school facility, objective management and maintenance cost of school facility is very important. However LCC(Life cycle cost) analyst, owner, engineer, contractor and facility manager have a difficulty to obtain and facilitate the basic analyzed data required to analyze LCC of school facility and establish maintenance plan. Therefore this research presents muti-dimensional analysis method through data warehouse technique for supplying maintenance cost information of school facility that can trace and accumulate the scattered LCCing data in the perspective of life cycle of school facility.

  • PDF

원전 건설공사 실적공사비 단가 제도 도입을 위한 연구 (A study on application method of "Result unit cost" to Nuclear Power Plant (NPP) construction cost estimating)

  • 박원섭;장경수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.46-47
    • /
    • 2014
  • Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.

  • PDF

Delphi 기법을 통한 건설기술진흥법 개정에 따른 CM사 대응방안에 관한 연구 (The Corresponding Plan of Construction Management Enterprise for the Introduce of Construction and Technology Promotion Law with Delphi Method)

  • 김성식;박정로;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.121-122
    • /
    • 2012
  • It has been passed around two decades since the CM is introduced in December 1996. And 20 years have passed. Construction Technology Management Act is the enacted of 1987, since Independence Hall fire in 1986. In the meantime, basic background and operational rather than the development of regulations that skewed had a voice of concern. Accordingly, Ministry of land is promoting a full-scale revision that Construction Technology Promotion law as switching to promote and support the necessity from Regulatory and management-oriented paradigm. In this paper, according to the Construction and Technology Promotion law amended in the course of doing business, was conducting research for drawn counterstrategy through SWOT analysis that was not the side of owner but CM company.

  • PDF

사용자 요구기반 공장기숙사 리모델링 프로세스 개선 (Improving Remodeling Process of Plant Dormitory Based on User Demand)

  • 구교진;박상헌;박형진;김철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.321-322
    • /
    • 2012
  • Since 1980, rapid social and economic development due to increased plant construction has led to a plant dormitory in a short period. In recent years, by the advent of the durability of dormitory remodeling is a critical need. However, user requirements due to the lack of owner's budget do not reflected. As a result, users have complained about the scope of construction, and construction stakeholder in accordance with the budget efficiency of the complaints have decreased. In this study the remodeling requirements in the planning stages is proposed for the remodeling process. In addition work type and element can select a range of construction worksheet are proposal.

  • PDF

현금 흐름을 고려한 건설일정 최적화에 관한 연구 (Optimizing a Construction Schedule Considering Cash-flow)

  • 이형국;임태경;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.303-305
    • /
    • 2012
  • This paper presents a system called a Cash-flow based Construction Scheduling Optimization (CfSO). The existing CPM is biased on schedule and cost management. For a profitable and successful project management, the cash-flow which occurred actually by contractual conditions should be considered in the project scheduling. Therefore, this study provides a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed methodology is implemented as a system prototype in Microsoft Excel. CfSO helps a site manager as a decision-maker to establish a optimized project scheduling and decide profitable contractual conditions against a construction owner.

  • PDF

건설공사의 성능계약 도입방안에 관한 연구 (A study on the Application Scheme of the Warranty contract in constructions)

  • 김대길;정호근;서용칠;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.89-92
    • /
    • 2007
  • Since 1960s, advanced constructions have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction. However, the interior of a country encounter another problem result from Defects Liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

Commercial Office의 Facility Management(FM) 업무 현황 분석을 통한 성과 평가체계 구축 방안 (A Study On the Development of Facility Management Performance Evaluation system by Analyzing Current FM Practices of Commercial Office Buildings)

  • 윤종한;차희성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.89-90
    • /
    • 2016
  • Despite the rise of importance of Facility Management(FM), relatively little attention was paid to evaluate FM efficiency and drive for greater FM efficiency. The purpose of the present paper is to offer a quantitative analysis of 14 Key Success Factors(KSF) and 22 detailed maintenance practices in order to develop FM evaluation system. In addition, from survey with Owner/Property Manager group and Facility Manager group, the present paper measures both importance of detailed maintenance practices and performance satisfaction. It is expected that by using the result of this survey, this paper helps increase efficiency in FM. Moreover, It is expected that this paper will be used as base line data in developing FM practice evaluation system.

  • PDF

VE 가치향상 유형별 수치적 범위기준 설정을 위한 기초연구 (A Basic Study for Establishing of Numerical Range Criteria for Classification of Value Improvement Types)

  • 남경우;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.74-75
    • /
    • 2018
  • VE, rather than just cost reduction tool, have established as a value enhancement tool of the construction industry. Value improvement types of VE proposal can show the effect of VE activities, also acts as an important element in which the owner adopts a proposal and confirms the results of the VE activities. However, problems in the process of quantification for VE proposal and ambiguous standards in classification of value improvement types is need to be supplemented. Accordingly, This study suggests the plan for establishing of numerical range criteria for classification of value improvement types of VE proposal. Implementing this plan will be able to improve the reliability and availability for VE activities.

  • PDF