• Title/Summary/Keyword: building information modeling (BIM)

Search Result 800, Processing Time 0.028 seconds

Development of System Module Based on BIM Technical Contents Data (BIM 기술콘텐츠 데이터 활용 시스템 모듈 개발)

  • Cho, Hyun-Jung;Jang, Jin-Seok;Kim, Yeon-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.680-687
    • /
    • 2016
  • Small and middle sized architectural design firms still have trouble using BIM (Building Information Modeling) for their tasks, which means that it is necessary to develop BIM Libraries and Technical contents. These BIM libraries should be based on common technical standards that reflect the technical contents to provide optimum BIM design support. This is essential to reduce the technological burden on the design office, because BIM does not just involve the 3D modeling of the design, but provides very important information for calculating the quantity of materials required for the construction and providing materials for the design work. Therefore, this research was aimed at improving the efficiency of the BIM design process by developing a system module based on the BIM technical contents data for the purpose of linking the BIM data and technical contents. The developed system module will be expanded to other uses of BIM in the long term.

Preliminary Study on the utilization of BIM in modular building construction (모듈러 건축공사의 BIM 활용성 분석을 위한 기초연구)

  • Lee, Myung-Do;Lee, Chan-Woo;Lim, Hyun-Su;Kim, Tae-Hoon;Lee, Ung-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.236-237
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that address several issues faced by the construction industry. However, the application guidelines for BIM in current modular construction projects are insufficient. This paper presents the preliminary work on the analysis of BIM utilization in a modular construction project; a five-point likert scale questionnaire was conducted to assess the necessity of BIM applications by the Necessity Index(NI) of nine categories(U1~U9) across two construction phases (onsite and offsite). The survey results indicate that applications for BIM based quantity takeoff for offsite phase(U4) as well as BIM modeling for module joint details(U8) were deemed to be the most necessary in each phase. The results of this study can be used as detailed guidelines for the integration of BIM in modular construction projects.

  • PDF

A Case study on the Remodeling Design through BIM(Building Information Modeling) (BIM을 활용한 리모델링계획 사례연구)

  • Min, Young-Gi;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.125-132
    • /
    • 2012
  • In this study based on BIM(Building Information Modeling) apply for performing efficient remodeling project and utilized. And this study will examine a real project where a BIM based process was used in the remodeling of an single-family homes. In the remodeling design phase of the planning process was conducted for the BIM process modeling, BIM in the remodeling stage while performing the required range and level of the remodeling process were studied. Based on this, communication between client and remodeling designer, participants more expect that smooth and speeds up in remodeling. For client decision support, troubleshooting of remodeling of the design process to be effective in the BIM have been identified. The BIM model and deliverables data used for the remodeling design process of building remodeling is the most effective way, due to the increased efficiency gained in many areas.

A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase (실시설계단계 BIM과 도면의 정합성 검토를 위한 체크리스트 개발)

  • Kim, Byeong-Ju;Kim, Yi-Je;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.33-42
    • /
    • 2018
  • The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.

A Study on the Application Possibility of Green Building Design Process based on Building Information Modeling(BIM) for Sustainable Architecture (지속가능한 건축을 위한 BIM기반 친환경건축 설계프로세스 적용가능성에 관한 연구)

  • Kim, Mi-Kyoung;Jang, Won-Jun;Choi, Hyun-Ah;Jun, Han-Jong
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.113-122
    • /
    • 2011
  • About 30% of the total annual energy consumption on the earth is used in the architectural activities, including construction, maintenance management, and demonstration of a building. Also, 40% of the natural resource consumption, 50% of $CO_2$ emissions, and 20%~50% of industrial waste emissions are produced from a building. Unfortunately, the percentage of its energy consumption is staidly increasing year by year, about 8% every year, and it recently causes a sustainable architectural concept to come to the fore globally. Indeed, the importance of the sustainable architecture is increasingly becoming a worldwide trend. BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. BIM has characteristics similar to a building's systems. All of the components in a model have a parametric relationship to each other. Understanding and capitalizing on these interrelationships typically takes numerous iterations that span multiple projects. Optimizing the integrated strategies and technologies for a high-performance, sustainable design requires a continual look at understanding how they work together to deliver the best potential. Throughout all of these concepts, we are going to be using a variety of tools that revolve around a BIM model. Some of the tools will require a heavier use of BIM than others, but all of them will utilize the model geometry you've created as part of your design. This study presents importance and validity of energy performance analyzation in the pre-design phase for the sustainable architecture with the support of Building Information Modeling (BIM) technology.

A Framework of Server-Based BIM System for Architectural Design firm (설계사무소 운용을 위한 Server기반 BIM 통합정보시스템 프레임워크 개발)

  • Cho, Jae-Keun;Kim, Yeon-Soo;Mha, Young-Kyun
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.10-18
    • /
    • 2013
  • In the architectural design industry recent BIM system was introduced to the vast amount of information generated by the process, who need it and require the need to manage the construction of information related to production, storage, delivery. In addition, for the project to perform the work involved collaboration between organizations is essential. The purpose of this study was to BIM standard for the system to effectively utilize BIM technology and development of the BIM business support collaboration system, to establish a BIM application environment, a variety of information in the field of architectural design that can be used practically efficient transcription.

Proposal of Smart BIM Library Framework for Curtain Wall with different LOD on each project stage (프로젝트 단계별 LOD가 반영된 스마트 BIM 커튼월 라이브러리 체계 구축)

  • Kim, Beom-Jun;Kim, Seong-Ah;Kim, Byeong-Ju;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.44-55
    • /
    • 2017
  • Recently, there has been a growing interest in the life cycle management field of buildings through the introduction of BIM. And as BIM application is expanded, BIM ordering guidelines and guidelines are becoming popular. Also, as diverse forms of buildings including super high-rise building have been generalized, attention to the importance of curtain walls that are advantageous for construction period shortening, building lighting and quality homogenization has been increasing. However, all BIM information from the design stage to the maintenance stage is not accumulated in stages. And the input information is not improved in proportion to the level of appearance of the BIM model. Also, current curtain wall designs rely heavily on curtain wall consulting firms or utilize accumulated data from existing processes. In this study, curtain wall components, shape and property information were derived by analyzing BIM guidelines and curtain wall construction standards to contribute to solving these problems. And the curtain wall smart BIM library which can be converted according to LOD(Level of Development) has been produced and its applicability has been verified. Through the library, curtain wall information can be systematically managed in the library from design to construction and maintenance. And the library will contribute to the expansion and activation of the BIM library market in the future.

Definition of 3D Modeling Level of Detail in BIM Regeneration Through Reverse Engineering - Case Study on 3D Modeling Using Terrestrial LiDAR - (역설계를 통해 BIM 구축시에 3D 모델링에 대한 세밀도(LoD) 정립 - 지상 LiDAR 활용한 3D 모델링 연구 중심 -)

  • Chae, Jae-Hyun;Lee, Ji-Yeong
    • Journal of KIBIM
    • /
    • v.7 no.4
    • /
    • pp.8-20
    • /
    • 2017
  • When it comes to set up the BIM through the reverse engineering, the level of detail(LoD) required for finalized outcomes is different from each purpose. Therefore, it is necessary to establish some concrete criteria which describe the definition of LoDs on 3D modeling for the purpose of each reverse engineering. This research shows the criteria of the 1) positional accuracy, 2) generalization level, 3) scale level, 4) scope of description, and 5) the area available for application by classifying LoD from 1 to 6 on 3D modeling for each purpose of reverse engineering. Moreover, through applying those criteria for the 3D point cloud dataset of building made by terrestrial LiDAR, this research finds out the working hour of 3D modeling of reverse engineering by each LoDs according to defined LoD criteria for each level. It is expected that those findings, how those criteria of LoD on reverse engineering are utilized for modeling-workers to decide whether the outcomes can be suitable for their budget, applicable fields or not, would contribute to help them as a basic information.

An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object (BIM 기반의 공간객체를 이용한 물량산출 정확성 분석)

  • Cha, You-Na;Kim, Seong-Ah;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.13-23
    • /
    • 2014
  • After being introduced, Building Information Modeling (BIM) has been actively applied to the cost estimation of construction projects, and various studies on BIM based quantity take-off have been carried out. In practice, however, these calculations take considerable time, because BIM based quantity take-off is further conducted along with 2D-based quantity take-off. Studies on the quantity take-off using BIM spatial objects have been carried out on early stages of projects, but how this method differs from the existing quantity take-off method and how accurate it is in comparison have rarely been verified. Therefore, by comparing 2D based quantities with quantities through BIM spatial objects, this study analyzed the accuracy of quantity take-off using BIM spatial objects. To this end, the properties of BIM spatial objects and quantity calculable spatial types were analyzed, and existing 2D-based quantities and quantities extracted from BIM spatial objects were compared through a case study. As a result, the quantity of spatial objects found to be more by about 7.13% in 0.05% and therefore, this difference should be considered during quantity take-off using BIM spatial objects. Through the results of this study, we can improve the accuracy of quantity take-off using BIM spatial objects in the early stage of a construction project.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.