Browse > Article
http://dx.doi.org/10.13161/kibim.2017.7.2.044

Proposal of Smart BIM Library Framework for Curtain Wall with different LOD on each project stage  

Kim, Beom-Jun (성균관대학교 미래도시융합공학과)
Kim, Seong-Ah (성균관대학교 건설환경연구소)
Kim, Byeong-Ju (성균관대학교 미래도시융합공학과)
Chin, Sang-Yoon (성균관대학교 건설환경공학부/미래도시융합공학과)
Publication Information
Journal of KIBIM / v.7, no.2, 2017 , pp. 44-55 More about this Journal
Abstract
Recently, there has been a growing interest in the life cycle management field of buildings through the introduction of BIM. And as BIM application is expanded, BIM ordering guidelines and guidelines are becoming popular. Also, as diverse forms of buildings including super high-rise building have been generalized, attention to the importance of curtain walls that are advantageous for construction period shortening, building lighting and quality homogenization has been increasing. However, all BIM information from the design stage to the maintenance stage is not accumulated in stages. And the input information is not improved in proportion to the level of appearance of the BIM model. Also, current curtain wall designs rely heavily on curtain wall consulting firms or utilize accumulated data from existing processes. In this study, curtain wall components, shape and property information were derived by analyzing BIM guidelines and curtain wall construction standards to contribute to solving these problems. And the curtain wall smart BIM library which can be converted according to LOD(Level of Development) has been produced and its applicability has been verified. Through the library, curtain wall information can be systematically managed in the library from design to construction and maintenance. And the library will contribute to the expansion and activation of the BIM library market in the future.
Keywords
Building Information Modeling (BIM); Level of Detail (LOD); Level of Development; Curtain Wall; Library;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Kim, C. D., Lee, S. H. (2006). The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools, Korean journal of construction engineering and management, 7(5), pp. 128-137.
2 Kim, K. R., Yu, J. H. (2015). Integrated Information Management for Composite Object Properties in BIM, Korean journal of construction engineering and management, 16(2), pp. 97-105.   DOI
3 Korean Construction Specification (2016). KCS 41 54 02 : 2016.
4 Kwon, W., Chun, J. Y. (2007). Collaborative Design Management System for Curtain Wall, Journal of the Architecture Institute of Korea, Vol.23 No.11, pp. 143-151.
5 Lee, E. B., Kim, D. H. (2015). A Study on the Implementation Method of the Object Classification System and Property Information for Vitalizing Standardized BIM Library, Journal of the Architecture Institute of Korea, 31(12), pp. 79-90.
6 Lee, Y. M., Kim Y. S. (2011). A Study for Major Delay Risk Factors in Curtain Wall Work of High-rise Building using FMEA, Journal of the Architecture Institute of Korea, 27(1), pp. 189-196.
7 Lim, H. K., Park, S. J., Chun, J. Y. (2007). A Proposal of Collaborative Design Management System in Curtain Wall Engineering, Journal of seismic retrofitting & remodeling research center, 5(1), pp. 43-50.
8 Lim, H. C., Choi, J. M. (2011). Critical Control Factors to Manage the Process of Material Procurement for Curtain Wall, Journal of the Regional Association of Architectural Institute of Korea, 13(4), pp. 281-288.
9 Moon, S. D., Ock, J. H. (2014). A Study on the Construction Management by Design and Construction Phase for Economic Improvement of the Curtain Wall Construction, Journal of the Architecture Institute of Korea, 30(2), pp. 53-62.
10 Park, S. H., Kim, I. H. (2014). OpenBIM-based Building Information Management System According to Information Level, Journal of the Architecture Institute of Korea, 30(12), pp. 41-48.
11 Redmond, A., Hore, A., Alshawi, M., West, R. (2012). Exploring How Information Exchanges Can Be Enhanced through Cloud BIM. Automation in Construction, 24, pp. 175-183.   DOI
12 Shin, J. H., Choi, J. S., Kim, I. H., Yoon, D. Y. (2016). A Study on Development of Integrated Management System for BIM Property Information, Korean Journal of Computational Design and Engineering, 21(2), pp. 130-142.   DOI
13 Song, S. Y., Lim, A. R., Song, J. H., Lim, J. H., Lee, K. N., Kim, Y. T. (2012). Design Criteria for Preventing Inside Surface Condensation on the Curtain Wall Systems of Office Buildings, Journal of the Architecture Institute of Korea, 28(11), pp. 383-392.
14 U.S. Department of Veterans Affairs (2010). The VA BIM Guide v1.0
15 Yoon, S. W., Chin, S. Y., Kim, Y. S. (2012) Assessing the Impact of RFID based materials tracking - Focusing on Curtain-Wall Work-, Korean journal of construction engineering and management, 13(1), pp. 24-35.   DOI
16 Bae, J. H., Shin, S. W., Lee, B. H. (2015). LOD (Level of Development) Standard for Development of Sustainable BIM Guideline, Design Convergence Study 47, 33(4), pp. 59-71.
17 Bae, K. J., Jun, H. J. (2011). A Case Study on LOD (Level of Development) studies for BIM Model, InforDESIGN, 10(5), pp. 31-43.
18 BIM Forum (2016). 2016 Level of Development Specification.
19 Cho, H. J., Kim, Y. S., Ma, Y. K. (2013). A Study of LOD (Level of Detail) for BIM Model applied the Design Process, KIBIM Magazine, 3(1), pp. 1-10.
20 Canada Mortgage and Housing Corporation (2004). Best Practice Guide: Glass and Metal Curtain Walls, Canada Mortgage and Housing Corporation, Ottawa.
21 Cho, Y. W., Lee, M. C., Ock, J. H. (2009). A Study on the Development of the Structural Performance Evaluation Manual of the Skyscrapers Curtain Wall Systems for Construction Managers, Korean journal of construction engineering and management, 10(3), pp. 92-101.
22 Choi, K. A., Lim, H. C. (2014). The Relative Priority of Improving Procurement Process with Supply Chain of Off-Site Manufacturing, Journal of the Regional Association of Architectural Institute of Korea, 16(3), pp. 197-204.
23 Choo, S. Y., Lee, K. H., Park, S. K. (2012). A Study on LOD(Level of Development) for Development of Green BIM Guidelines-Focused on Energy Performance Estimation, Journal of the Architecture Institute of Korea, 28(6), pp. 37-47.
24 CRC Construction Innovation (2009). National Guidelines for Digital Modeling.
25 Jung, S. O., Kim, Y. S., Yoon, S. W., Chin, S. Y. (2005). An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process, Korean journal of construction engineering and management, 6(4), pp. 101-112.
26 Jung, W. J., Jun, K. H., Sheen, J. W., Hong, S. Y. (2014). A study on the applicability of BIM for Floating Architecture, Journal of the Regional Association of Architectural Institute of Korea, 16(3), pp. 71-77.   DOI