• 제목/요약/키워드: building information modeling (BIM)

검색결과 811건 처리시간 0.022초

BIM Application Process for Facility Condition Assessment Documentation Work

  • Yoo, Seung Eun;Yu, Jung Ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.268-270
    • /
    • 2015
  • Overseas countries' government and facility management industries make efforts to ensure precise and fluent data from building information modeling (BIM). In facility management, a large amount of data and information are necessary to continue the process activities. Facility condition assessment, which is performed to make budget plan for the maintenance and operation requires the related facilities' documentation and information. However, it depends on the owner and the user of the facility to provide accurate and complete information to consultant. The problems as follows: (1) owner and user should provide documents and information, and (2) the consultant cannot verify the provided information. To solve these problems, we suggest a methodology to produce the information for FCA through BIM. First, all of the essential documentation and assessment elements are listed. Next, the documents and elements are separated out, whether they are able to be extracted from BIM or not. Then, the list indicates only the data that is linked with BIM. The suggestion is expected to provide the required information through the connection to BIM with accuracy and completeness and to present another BIM application use for facility management.

  • PDF

A STUDY ON THE CONSTRUCTION OF BIM DATA INTEROPERABILITY FOR ENERGY PERFORMANCE ASSESSMENT BASED ON BIM

  • Jungsik Choi;Hyunjae Yoo;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.267-273
    • /
    • 2013
  • Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.

  • PDF

BSC를 기반으로 한 BIM프로젝트의 만족도 측정에 관한 연구 (BSC Based Measurement of Satisfaction Degree For Based BIM Construction Projets)

  • 송미림;윤수원;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.117-129
    • /
    • 2011
  • 건설프로젝트의 대형화, 복잡화, 다양화로 인해 전략적 대응방안 중 하나로 BIM(Building Information Modeling)이 등장하였다. 최근 조달청에서는 2012년부터 500억 이상의 건설 프로젝트에 BIM적용을 의무화하는 BIM 활성화 계획을 발표하여 국내 건설 산업 전반으로 BIM도입이 확산되고 있다. 이에 BIM기반 프로젝트 사례를 바탕으로 각종 BIM연구가 진행되고 있다. 그러나 현재 BIM관련 연구는 BIM도입에 대한 단편적인 문제점 도출 및 BIM에 대한 기술력과 체제 구축 등의 문제점을 중점으로 활발히 진행되고 있으나, 본질적인 BIM기반 프로젝트 전반에 대한 만족도에 관한 연구는 전무하다. 따라서 본 연구는 국내 BIM기반 프로젝트에 대한 실태 파악 및 만족도를 조사하여 이를 종합적으로 분석하고 현재 실무자들의 시각에서의 프로젝트 내 BIM적용에 대한 중요 부문 및 취약 부문을 파악한 뒤 중점 개선하는 방향을 제시하는 등 효율성 면에서의 BIM기반 프로젝트에 대한 만족도 연구를 하였다.

BIM 기반 비정형 건축물 패널화 모델 생성 방법에 관한 연구 (BIM-Based Generation of Free-form Building Panelization Model)

  • 김양길;이윤구;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.19-31
    • /
    • 2022
  • With the development of 3D-based CAD (Computer Aided Design), attempts at freeform building design have expanded to small and medium-sized buildings in Korea. However, a standardized system for continuous utilization of shape data and BIM conversion process implemented with 3D-based NURBS is still immature. Without accurate review and management throughout the Freeform building project, interference between members occurs and the cost of the project increases. This is very detrimental to the project. To solve this problem, we proposed a continuous utilization process of 3D shape information based on BIM parameters. Our process includes algorithms such as Auto Split, Panel Optimization, Excel extraction based on shape information, BIM modeling through Adaptive Component, and BIM model utilization method using ID Code. The optimal cutting reference point was calculated and the optimal material specification was derived using the Panel Optimization algorithm. With the Adaptive Component design methodology, a BIM model conforming to the standard cross-section details and specifications was uniformly established. The automatic BIM conversion algorithm of shape data through Excel extraction created a BIM model without omission of data based on the optimized panel cutting reference point and cutting line. Finally, we analyzed how to use the BIM model built for automatic conversion. As a result of the analysis, in addition to the BIM utilization plan in the general construction stage such as visualization, interference review, quantity calculation, and construction simulation, an individual management plan for the unit panel was derived through ID data input. This study suggested an improvement process by linking the existing research on atypical panel optimization and the study of parameter-based BIM information management method. And it showed that it can solve the problems of existing Freeform building project.

BIM기반 Life Cycle Cost 산정을 위한 프로세스에 관한 연구 (A Study on the Estimating Process for Life Cycle Cost based on BIM)

  • 이현주;문준호;박규태;김태희;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.149-151
    • /
    • 2011
  • Recently, Architectural Design based on Building Information Modeling(BIM) is popular, construction management based on BIM is necessary. such as Quantity take off, scheduling, and Life Cycle Cost Estimating etc. Therefore, in the study, LCC Estimating using BIM Data, which is extracted from architectural designing process is proposed.

  • PDF

BIM 기반 물량 산출의 정확성 검증 - 마감공사 공종을 중심으로 (A Verification of the Accuracy in BIM-Based Quantity Taking-Off - Focusing on Finishing Work)

  • 김지현;윤수원
    • 한국BIM학회 논문집
    • /
    • 제3권2호
    • /
    • pp.1-9
    • /
    • 2013
  • Currently, various studies and applications related BIM based quantity take-off have been attempted, because of the accuracy of cost estimating and reliability by using the BIM model information in automatical calculation. Finishing works that have a large number of various types and materials need the higher accuracy and reliability on the BIM-based quantity take-off. Therefore, this study compared and analyzed 2D and 3D based quantity through Test-bed and determine the cause of the quantity difference. This verified the accuracy and efficiency in the BIM-based quantity take-off for finishing works. Also this study has been proposed opinions for calculating the exact BIM-based quantity take-off.

BIM-DRIVEN ENERGY ANALYSIS FOR ZERO NET ENERGY TEST HOME (ZNETH)

  • Yong K. Cho;Thaddaeus A. Bode;Sultan Alaskar
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.276-284
    • /
    • 2009
  • As an on-going research project, Zero Net Energy Test Home (ZNETH) project investigates effective approaches to achieve whole-house environmental and energy goals. The main research objectives are (1) to identify energy saving solutions for designs, materials, and construction methods for the ZNETH house and (2) to verify whether ZNETH house can produce more energy than the house uses by utilizing Building Information Modeling (BIM) and energy analysis tools. The initial project analysis is conducted using building information modeling (BIM) and energy analysis tools. The BIM-driven research approach incorporates architectural and construction engineering methods for improving whole-building performance while minimizing increases in overall building cost. This paper discusses about advantages/disadvantages of using BIM integrated energy analysis, related interoperability issues between BIM software and energy analysis software, and results of energy analysis for ZNETH. Although this investigation is in its early stage, several dramatic outcomes have already been observed. Utilizing BIM for energy analysis is an obvious benefit because of the ease by which the 3D model is transferred, and the speed that an energy model can be analyzed and interpreted to improve design. The research will continue to use the ZNETH project as a testing bed for the integration of sustainable design into the BIM process.

  • PDF

Design and Implementation of a Blockchain System for Storing BIM Files in a Distributed Network Environment

  • Seo, Jungwon;Ko, Deokyoon;Park, Sooyong;Kim, Seong-jin;Kim, Bum-Soo;Kim, Do Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제26권12호
    • /
    • pp.159-168
    • /
    • 2021
  • BIM (Building Information Modeling) 데이터는 전 세계 표준에 맞춰 설계 도면을 디지털화시킨 데이터이며, BIM 데이터의 안전한 공유 및 거래를 위해서 블록체인을 활용하기 위한 연구들이 진행되고 있다. 하지만, BIM 데이터의 용량 크기와 블록체인의 기술적 한계로 인해 BIM 데이터를 블록체인에 직접적으로 저장할 방법이 없다. 본 논문에서는 해당 문제점을 해결하기 위해 분산 파일 시스템과 블록체인을 융합하여 BIM 데이터를 저장하는 방안에 대해서 제안한다. 본 논문에서는 BIM 데이터 저장을 위해 두 개의 네트워크 오버레이를 구축하는 방안과 BIM 데이터의 효율적인 검증을 위해서 LOD (Level of Detail)기반의 머클 트리를 생성하는 방안을 제안하였다. 제안된 방식을 블록체인 클라이언트인 베수와 IPFS 클라이언트에 동기화 모듈과 함께 적용하여 BIM 데이터가 정상적으로 저장되는 것을 확인하였으며, 제안된 방식을 통해서 파일 용량이 증가할 때도 처리 속도가 안정적으로 증가한다는 것을 확인하였다.

건축정보모델링(BIM)기반 건축 환경 성능 사례 분석 (Case studies on BIM-based architectural environment performance analysis)

  • 문현준;최민석;박진우;유승호
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1412-1417
    • /
    • 2009
  • BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. However, it is still hard to implement environmental performance analysis using BIM in design stages. This study aims to reveal practical problems and evaluate interoperability between building design information and performance analysis with case studies. Three case studies are performed using two environmental analysis programs (IES/VE, EnergyPlus) and BIM-based architectural design programs (Revit, GoogleSketchUp) in this paper.

  • PDF

설계 프로세스를 반영한 BIM 작성 기준(LOD)에 대한 연구 (A Study of LOD(Level of Detail) for BIM Model applied the Design Process)

  • 조현정;김연수;마영균
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.1-10
    • /
    • 2013
  • BIM(Building Information Modeling) ordering manuals and guidelines are diffused with the recent BIM activation. However, it is causing drawbacks such as an increase of work at each design stage and a decline of BIM application level that the standard of making up and managing BIM is vague and it includes comprehensive meaning. Therefore, this study aims to secure BIM work standard by establishing BIM making-out standard based on LOD(Level of Detail) classification considering domestic design process. It compared each definition of LOD by analyzing domestic and foreign BIM guideline examples, and figured out insufficiency of existing domestic and foreign design process and BIM guidelines. Moreover, it drew architects' work articles for promoting the progression of the efficient design process, and analyzed BIM requirements on design process, dividing BIM application scale by field. Through this analyzing process, it finally established BIM making-out standard classified by design process. The effects of establishing BIM making-out standard would include improving a division of labor and cooperation environment by creating integrated BIM model on design stages, advancing work efficiency by preventing a repetition and an increase of work, and upgrading project completeness and design quality. Besides, it can secure BIM work standard by clarifying responsibility for working steps. BIM making-out standard established by this study will contribute to developing the future BIM work standard document and BIM guideline as a data base.