• Title/Summary/Keyword: building information model(BIM)

Search Result 416, Processing Time 0.029 seconds

Machine Learning Based Architecture and Urban Data Analysis - Construction of Floating Population Model Using Deep Learning - (머신러닝을 통한 건축 도시 데이터 분석의 기초적 연구 - 딥러닝을 이용한 유동인구 모델 구축 -)

  • Shin, Dong-Youn
    • Journal of KIBIM
    • /
    • v.9 no.1
    • /
    • pp.22-31
    • /
    • 2019
  • In this paper, we construct a prototype model for city data prediction by using time series data of floating population, and use machine learning to analyze urban data of complex structure. A correlation prediction model was constructed using three of the 10 data (total flow population, male flow population, and Monday flow population), and the result was compared with the actual data. The results of the accuracy were evaluated. The results of this study show that the predicted model of the floating population predicts the correlation between the predicted floating population and the current state of commerce. It is expected that it will help efficient and objective design in the planning stages of architecture, landscape, and urban areas such as tree environment design and layout of trails. Also, it is expected that the dynamic population prediction using multivariate time series data and collected location data will be able to perform integrated simulation with time series data of various fields.

Development of Automated 3D Modeling System to Construct BIM for Railway Bridge (철도 교량의 BIM 구축을 위한 3차원 모델 생성 자동화 시스템 개발)

  • Lee, Heon-Min;Kim, Hyun-Seung;Lee, Il-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.5
    • /
    • pp.267-274
    • /
    • 2018
  • For successful BIM settlement, it is a key technic for engineer to design structures in the 3-dimensional digital space and to work out related design documents directly. Lately many BIM tool has been released and each supports their 3-dimensional object libraries. But it is not easy to apply those libraries to design transportation infra structures that were placed along the route(3-dimensional line). Moreover, in case of design changes, it is so difficult to reflect those changes with the integrated model that was assembled by them. Because of they were developed without consideration for redundancy of parameters between objects that were placed nearby or were related each other. In this paper, a method to develop module for modeling and placing 3-dimensional object for transportation infra structures is presented. The modules are employed by a parametric method and can deal with design changes. Also, for a railroad bridge, through developing user interface of the integrated 3-dimensional model that was assembled by those modules the applicability of them was reviewed.

Development of intranet-based Program Management Information System of multi-complex project with application of BIM (BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안)

  • Song, Il-Bab;Hur, Young-Ran;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 2012
  • Public construction projects need complex and multi-functional management skill, since the most of public construction projects are comprised of multi-project and mega-projects. In order to effectively manage construction projects, PMIS is widely used. However the majority of the current PMIS have been developed as a single project-oriented business management system. Thus compatibility problems are encountered during the process of integrating the entire systems to manage the multi-complex projects. In addition, the form of orders applying BIM are increased recently, but the research and development of BIM based PMIS are still lacking. In this study, therefore, the functions of PMIS main objectives based on the analysis of PMIS As-Is and To-Be of PMIS, the dual management system utilizing Internet and Intranet will be proposed to integrate the individual PMIS with Integrated Program Management System. Rather than combining commercial BIM tool and PMIS directly, which is the common method of failure, the sequential process model to adopt BIM based PMIS is also explained. Step-by-step development method of BIM based PMIS is suggested to prepare for the activation of BIM technology in the nearest future.

The Study for Making of Landscape Simulation Model for Landscape Design Review (경관심의를 위한 경관시뮬레이션 모형 작성 기법에 관한 연구)

  • Lee, Dong-Hwa;Kim, Jae-Myung
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.54-60
    • /
    • 2019
  • After Landscape Act was enacted, as awareness of landscape has increased and the need of expanding targets of landscape design review and improving landscape examination in terms of quality, this study aims to describe a technique of creating three dimensional landscape simulation model which is used for landscape design review. For this, the author of this study conducted analysis in terms of function and use of programs and compatibility with programs to find a way of creating models with the most efficient and optimum process. For creation of landscape simulation models, initial creation is important but in case that changes occur by operator changing or discussing development plans, rapid correction and change are needed. Therefore, this study described how to build more accrurate and efficient simulation at initial review and how to create a landscape simulation model for rapid response to changed plans during reconsideration.

Prediction and Evaluation of the Wind Environment in Site Planning of Apartment Housing by CFD (아파트 주거의 배치계획에 있어 CFD에 의한 풍환경의 예측과 평가)

  • Sohn, Saehyung
    • KIEAE Journal
    • /
    • v.10 no.2
    • /
    • pp.63-69
    • /
    • 2010
  • Diverse problems in wind environment has occurred through rapid urbanization and growth of high-rise building numbers, This study aims to propose the CFD (Computational Fluid Dynamics) simulation method and evaluation standard of wind environment in site planning of high rise apartment housing. The CFD simulation method proposed in this study is not existing detail simulation, but it is the method that a designer can correct and develop the design through immediate evaluation of design options in concept design phase. Therefore, the proposed CFD simulation method of wind environment in this study uses the BIM based CFD tool in which the 3D model in concept design phase can be used as for the CFD simulation. In this paper, the study examines existing evaluation standards of comfortableness level in wind environment for pedestrian near buildings, and selects new evaluation method which is possible to apply to the proposed CFD simulation method. In addition, it is to examine calculation time-spending and appropriate mesh division method for finding CFD result which is useful to find the best design options in aspect of wind environment in concept design phase. Furthermore, it proposes the wind environment evaluation method through BIM based CFD simulation.

A Study on the Improvement of Repair and Reinforcement Quantity Take-off in Fire-damaged Area Using 3D Laser Scanning (3D Laser Scanning을 활용한 화재 손상 부위의 보수·보강 물량 산출 방식 개선에 관한 연구)

  • Jeong, Hoi-Jae;Ham, Nam-Hyuk;Lee, Byoung-Do;Park, Kwang-Min;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.9 no.1
    • /
    • pp.11-21
    • /
    • 2019
  • Recently, there is an increase in fire incidents in building structures. Due to this, the importance of fire-damaged buildings' safety diagnosis and evaluation after fire is growing. However, the existing fire-damaged safety diagnosis and evaluation methods are personnel-oriented, so the diagnostic results are intervened by investigators' subjectivity and unquantified. Thus, improper repair and reinforcement can result in secondary damage accidents and economic losses. In order to overcome these limitations, this study proposes using 3D laser scanning technology. The case analysis of fire-damaged building structures was conducted to verify the effectiveness of accuracy and manpowering by comparing the existing method and the proposed method. The proposed method using 3D laser scanning technology to obtain point cloud data of fire-damaged field. The point cloud data and BIM model is combined to inspect the fire-damaged area and depth. From inspection, quantified repair and reinforcement quantity take-off can be acquired. Also, the proposed method saves half of the manpowering within same time period compared to the existing method. Therefore, it seems that using 3D laser scanning technology in fire-damaged safety diagnosis and evaluation will improve in accuracy and saving time and manpowering.

Process Model for Construction Project Life-cycle Management System (CPLM 구축을 위한 프로세스 모델 구축)

  • Song, Jae-Hong;Yoon, Su-Won;Shin, Tae-Hong;Chin, Sang-Yoon;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.277-282
    • /
    • 2007
  • Construction process works in sequence order and there are many different software for managing project and activity. So, there are many limitations such as in the stage of activity data loss can occur, in each stage concurrent cannot operate in construction industry. In order to solve these problem, agents have to cooperate each other and they need to share of data. Therefore, the purpose of this paper is to develop a process model and the process model will be use in the future to make Construction Project Life-Cycle Management based on concept of PLM(Product Life cycle Management) in the manufacturing industry, CE(Concurrent Engineering) and BlM(Building Information Modeling)

  • PDF

Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis (구조안전진단에서의 3D 레이저 스캐너 투입 성과 분석)

  • Seong, Do-Yun;Baek, In-Soo;Kim, Jea-Jun;Ham, Nam-Hyuk
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.34-44
    • /
    • 2021
  • This study quantitatively analyzes the work performance of the structural safety diagnosis team that diagnoses pipe racks. To this end, a method for evaluating the performance of the structural safety diagnosis team using the queuing model was proposed. For verification, the case of applying the existing method and the method of introducing a 3D laser scanner for one site was used. The period, number of people, and initial investment cost of each project were collected through interviews with case project experts. As a result of analyzing the performance of the structural safety diagnosis team using the queuing model, it was possible to confirm the probability of delay in the work of each project and the amount of delayed work. Through this, the cost (standby cost) when the project was delayed was analyzed. Finally, economic analysis was conducted in consideration of the waiting cost, labor cost, and initial investment cost. The results of this study can be used to decide whether to introduce 3D laser scanners.

Improved Method for Increasing Maintenance Efficiency of Construction Structure Using Augmented Reality by Marker-Less Method (비마커기반 증강현실을 이용한 건설 구조물 유지관리 효율화 방안)

  • Moon, So Yeong;Yun, Su Young;Kim, Hyeon Seung;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.961-968
    • /
    • 2015
  • As BIM has been increasingly applied to building project recently, its application to civil engineering project is also on the rise. As construction structures have been expanded and complicated in a size and type, the information for handling maintenance process has also increased. Thus, to actively utilize the BIM information created at the design stage, this study has been carried out to establish a maintenance system using a marker-less based augmented reality method, by presenting a maintenance system for the construction structures using augmented reality. A SURF algorithm is used to link the 3D objects in the design and construction phases to the maintenance phase. The presented method in this study can increase the utilization of 3D information created at the design stage, by offering an augmented reality technology at the maintenance stage. The method could also improve the efficiency of visual inspection on construction structures by augmenting 3D model of a bridge structure.

A Study on the Establishment of Rule-Based Modules for Automating the Design of Interior Finishes in Architectural Buildings (건축 내부 마감 자동 상세화를 위한 규칙 기반 모듈 구축 방안에 관한 연구 - 바닥, 벽 및 천장을 중심으로 -)

  • Ha, Dae-Mok;Yu, Young-Su;Koo, Bon-Sang
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.42-54
    • /
    • 2022
  • BIM facilitates data transparency and consistency through three-dimensional parametric modeling and promotes the accurate managing and sharing of project information. In Korea, however, BIM-based detailed design of architectural interior finishes required during the Construction Documents phase increases the burden on architectural firms due to frequent design changes and manual workload. Therefore, the purpose of this study was to establish rule-based modules using parametric modeling that automates repetitive tasks that occur during the detailed design of interior finishing. Interviews with practitioners were conducted to analyze the major finishing elements. Of these floors, walls, and ceilings, which were the most rudimentary and common items, were selected as the subjects of the study. The modules developed in this study have two functions. One is to create new finish types, and the other is the automatic modeling of new types into rooms. For these functions, parameters that belonged to each finish and room element in a BIM model were analyzed and valid parameters directly used for parametric modeling were derived. Then, based on these parameters, rule-based modules for three elements, I.e., floors, walls, and ceilings were constructed with Revit Dynamo, and the effectiveness of the modules was verified with a pilot test. In conclusion, this study suggested a series of processes for automatic finishing to improve the efficiency of BIM-based architectural detailed design of finishes and to contribute in solving the chronic problems occuring during current design processes.