• Title/Summary/Keyword: building demolition

Search Result 171, Processing Time 0.026 seconds

Change Detection of Building Demolition Area Using UAV (UAV를 활용한 건물철거 지역 변화탐지)

  • Shin, Dongyoon;Kim, Taeheon;Han, Youkyung;Kim, Seongsam;Park, Jesung
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.5_2
    • /
    • pp.819-829
    • /
    • 2019
  • In the disaster of collapse, an immediate response is needed to prevent the damage from worsening, and damage area calculation, response and recovery plan should be established. This requires accurate detection of the damage affected area. This study performed the detection of the damaged area by using UAV which can respond quickly and in real-time to detect the collapse accident. The study area was selected as B-05 housing redevelopment area in Jung-gu, Ulsan, where the demolition of houses and apartments in progress as the redevelopment project began. This area resembles a collapsed state of the building, which clear changes before and after the demolition. UAV images were acquired on May 17 and July 9, 2019, respectively. The changing area was considered as the damaged area before and after the collapse of the building, and the changing area was detected using CVA (Change Vector Analysis) the Representative Change Detection Technique, and SLIC (Simple Linear Iterative Clustering) based superpixel algorithm. In order to accurately perform the detection of the damaged area, the uninterested area (vegetation) was firstly removed using ExG (Excess Green), Among the objects that were detected by change, objects that had been falsely detected by area were finally removed by calculating the minimum area. As a result, the accuracy of the detection of damaged areas was 95.39%. In the future, it is expected to be used for various data such as response and recovery measures for collapse accidents and damage calculation.

Experimental investigation on hardened properties of recycled coarse aggregate concrete

  • Shohana, Shanjida A.;Hoque, Md. I.;Sobuz, Md. H.R.
    • Advances in concrete construction
    • /
    • v.10 no.5
    • /
    • pp.369-379
    • /
    • 2020
  • Reduction of disposal of waste materials due to construction demolition has become a great concern in recent decades. The research work presents the hardened properties of concrete where the partial substitution of recycled coarse aggregate with natural aggregate in amount of 0%, 10%, 30% and 50%. By using different mixed proportions, fresh and hardened properties of concrete were conducted for this investigation. These properties were compared with control concrete. It can be seen that all of the hardened properties of concrete were decreased with the increasing percentage of recycled aggregate in concrete mixes. It was noticed that up to 30% recycled aggregate replacement can be yielded the optimum strength when it used in normal concrete. Finally, it can be said that disposed recycled concrete utilizing as a partial replacement in natural aggregate is a great way to reuse and reduce environmental hazards which achieve sustainability approach in the construction industry.

Dome Structure using High-Density EPS Review of Safety (고밀도 EPS를 이용한 돔 구조 안전성에 대한 고찰)

  • Jang, Suk-Jun;Lee, Dong-Un
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.119-120
    • /
    • 2011
  • Dome structure to form a space-efficient, applied a lot of beautiful buildings with structural systems, as well as a large space structure in the form of new residential lots have been applied. And domestic demand for housing in the dome with increasing dome house using various materials, are becoming commonplace. But now the Dome House is mainly used in construction steel, wood, stone, FRP construction and building materials per unit area and the high cost, long construction time, energy efficiency, has some disadvantages such as degradation. And structural strength of the structure is weak, the natural ingredients used come from natural damage is so big. In addition, demolition of buildings in trouble when handling the environmental problems has emerged. Recently expanded polystyrene to improve these problems by using the various approaches and research is being attempted and there.

  • PDF

Development of an ANN based Model for Predicting Scattering Asbestos Concentration during Demolition Works (인공신경망 기반 석면 해체·제거작업 후 비산 석면 농도 예측 모델 개발)

  • Kim, Do-Hyun;Kim, Min-Soo;Lee, Jae-Woo;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.53-54
    • /
    • 2022
  • There is an increasing demand for prediction of asbestos concentration which has an fatal effect on human body. While demolishing asbestos, the dust scatters and makes workers be exposed to danger. Up to this date, however, factors that particularly influences have not considered in predicting asbestos concentration. Most of the studies could not quantify the distribution of asbestos. Also, they did not use nominal data on buildings as important factors. Therefore, this study aims to build an asbestos concentration prediction model by quantifying distribution of asbestos and using nominal data of buildings based on Artificial Neural Network (ANN). This model can give significant contribution of improving the safety of workers and be useful for finding effective ways to demolish asbestos in planning.

  • PDF

How does the knowledge level affect the seismic retrofit cost? The case study of a RC building

  • Miano, Andrea;Chiumiento, Giovanni;Formisano, Antonio;Prota, Andrea
    • Structural Engineering and Mechanics
    • /
    • v.82 no.5
    • /
    • pp.557-569
    • /
    • 2022
  • The retrofit of existing structures in high seismic zones is a crucial issue in the earthquake engineering field. The interest of the research community is particularly high for the structures that do not respect current seismic codes and present structural deficiencies such as poor detailing and lack of capacity design provisions. A reinforced concrete (RC) school building is used as case study to show the influence of different knowledge levels on the seismic retrofitting cost assessment. The safety assessment of the case study building highlights deficiencies under both vertical and seismic loads. By considering all the possible knowledge levels defined by the Italian such as by the European codes in order to derive the mechanical properties of the school building constitutive materials, the retrofit operations are designed to achieve different seismic safety thresholds. The retrofit structural costs are calculated and summed up to the costs for in-situ in tests. The paper shows how for the case study building the major costs spent for a large number of in-situ tests allows to save a consistent amount of money for retrofit operations. The hypothesis of demolition and reconstruction of the building is also compared in terms of costs with all the analyzed retrofit options.

A Study on the Measurement of Total Airborne Bacteria in the Process of Dismantling the Non-structure of Old Building (노후건축물 비구조체 해체과정에서의 총부유세균 발생량측정에 관한 연구)

  • Son, Byeung-Hun;Kang, Kyung-Ha;Lee, Ji-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.313-314
    • /
    • 2021
  • An old building over 30 years old continue to increase. Therefore, there will be more dismantling of old buildings in the future. Safety management of dismantling works is being strengthened. However, no consideration has been given to the effects of dismantling workers and their residents due to environmental hazards arising from the demolition process. Only spray and dust prevention measures are subject to inspection to minimize dust generation considering civil complaints around the site of dismantling work. In this paper, residential buildings, which account for the largest proportion of old buildings, were collected and identify total airborne bacteria and floating fungi among environmental hazards caused by non-structural dismantling work. Measurement results showed that workers during dismantling work are working in places with 4.8 times more total airborne bacteria than indoor air quality maintenance standards. Related research is needed for the health of dismantling workers.

  • PDF

Basic Research for Introduction Plan of Building Dismantlement (건축물 분별해체 제도 도입을 위한 기초연구)

  • Park, Ji-Sun;Song, Tae-Hyeob
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.4
    • /
    • pp.113-120
    • /
    • 2012
  • This study was conducted basic research for introduction plan of building dismantlement to reduce construction waste fundamentally and efficiently. The current domestic and overseas legislations relation with dismantlement were compared. In addition, the difference of construction waste treatment and pure demolition cost that were applied to dismantlement and general deconstruction method in building were compared. The total cost that was estimated to apply dismantlement in building was higher about 6% than that of general deconstruction.

  • PDF

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

An Evaluation of Fire Resistance and Mock-up Test of the Alumino-silicate Fire Resistant Board (알루미노 실리케이트계 내화보드의 내화성능 및 현장적용성 평가)

  • Kim, Doo-Ho;Park, Dong-Cheol;Kim, Woo-Jae;Lee, Sea-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.43-47
    • /
    • 2010
  • The use of high-strength concrete has increased for its excellent structural stability as buildings become higher and bigger than ever before in Korea and overseas recently. The functional requirement of building materials has also been bolstered so for the high -performance, high-quality construction materials to be used more extensively. However, the internal structure of the high-strength concrete is very dense so spalling can be caused during fire. The spalling in turn can cause critical structural damages followed by the fatal consequences, demolition of the building. Therefore, ensuring fire safety for high-rise buildings is assumed to be urgent. Alumino-silicate fire resistant board producing technology has been developed in situations that new materials with excellent fire resistance and easy installation has been sought. The alumino-silicate fire resistant board turned out to exhibit not only fire resistance and excellent physical and dynamical characteristics but also excellent onsite applicability and easy process and transportation after completing Mock-up test. Its excellence as a high-performance building materials was proven.

  • PDF

Use of Recycled Brick Masonry Aggregate and Recycled Brick Masonry Aggregate Concrete in Sustainable Construction

  • Schwerin, Dallas E.;Cavalline, Tara L.;Weggel, David C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.1
    • /
    • pp.28-34
    • /
    • 2013
  • Use of recycled aggregates in portland cement concrete (PCC) construction can offer benefits associated with both economy and sustainability. Testing performed to date indicates that recycled brick masonry aggregate (RBMA) can be used as a 100% replacement for conventional coarse aggregate in concrete that exhibits acceptable mechanical properties for use in structural and pavement elements, including satisfactory performance in some durability tests. Recycled brick masonry aggregate concrete (RBMAC) is currently not used in any type of construction in the United States. However, use of RBMAC could become a viable construction strategy as sustainable building practices become the norm. This paper explores the feasibility of use of RBMAC in several types of sustainable construction initiatives, based upon the findings of previous work with RBMAC that incorporates RBMA produced from construction and demolition waste from a case study site. A summary of material properties of RBMAC that will be useful to construction professionals are presented, along with a discussion of advantages and impediments to use. Several quality assurance and quality control techniques that could be incorporated into specifications are identified.