• Title/Summary/Keyword: building construction project manager

Search Result 58, Processing Time 0.028 seconds

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

A decision support system (DSS) for construction risk efficiency in Taiwan

  • Tsai, Tsung-Chieh;Li, Hsiang-Wen
    • Smart Structures and Systems
    • /
    • v.21 no.2
    • /
    • pp.249-255
    • /
    • 2018
  • Many studies in risk management have been focused on management process, contract relation, and risk analysis in the past decade, but very few studies have addressed project risks from the perspective of risk efficiency. This study started with using Fault Tree Analysis to develop a framework for the decision-making support system of risk management from the perspective of risk efficiency, in order for the support system to find risk strategies of optimal combination for the project manager by the trade-off between project risk and cost of project strategies. Comprehensive and realistic risk strategies must strive for optimal decisions that minimize project risks and risk strategies cost while addressing important data such as risk causes, risk probability, risk impact and risk strategies cost. The risk management in the construction phase of building projects in Taiwan upon important data has been analyzed, that provided the data for support system to include 247 risk causes. Then, 17 risk causes were extracted to demonstrates the decision-making support system of risk management from the perspective of risk efficiency in building project of Taiwan which could reach better combination type of risk strategies for the project manager by the trade-off between risk cost and project risk.

Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project (소규모 건설프로젝트에서 현장관리업무 개선방안)

  • Lee, Da-Un;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.81-87
    • /
    • 2018
  • Since February 2017, site managers in small architectural projects are required by the revised building act. In order to address issues for site managers and to improve project efficiency, system improving methods are surveyed and proposed in this study. The key inspection items in the existing surveillance guidance manual were investigated, and the checklist for site managers for a small to medium sized construction site was analyzed. This study also tries to propose using web-based site management systems for improvement of the utilization of checklists. It is expected that these on-site management systems, along with BIM technology, will be able to monitor the small size building construction project in real time and effectively monitor the various problems occurring on-site.

A Study on the Efficiency of Safety Manager in Construction Project Stage (건설공사 사업 단계별 안전관리자 수행업무 효율화에 관한 연구)

  • Kang, Sang-Hun;Park, Hyun-Jung;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.212-213
    • /
    • 2022
  • Recently, the construction industry is increasingly in need of securing safety rights due to repeated serious accident. Accordingly, the government enacted the "Serious accident Punishment Act" to strengthen punishment for serious accident and expand the scope of punishment. However, safety managers in the construction industry are still vulnerable to safety accidents due to the heavy workload. The purpose of this study is to increase the efficiency of performance tasks and reduce serious accidents in the construction industry through analysis of performance tasks by stages of construction projects. The tasks derived through domestic research and domestic and foreign system analysis were classified step by step to analyze the correlation between difficulty and preventive effect, and inefficient tasks were discovered and improved. This can be used as basic data for identifying safety management tasks and preparing effective safety prevention measures, and it is expected to be a preventive measure against industrial accidents in the construction industry by using it for efficient work reorganization by safety managers.

  • PDF

Knowledge and Perception Level on Building Equipment Required of CMrs at the Project Design Stage

  • Jang, Young-Jun;Kim, Jin-Dong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.674-681
    • /
    • 2012
  • With the rise in the functions required in modern building structures, the role of the building equipment that maintains the functions of a building has been emphasized and increased. Effective management in this area is only possible when the construction manager (CMr) is qualified and has the knowledge of building equipment that is needed. Therefore, in this study, a questionnaire survey was carried out on equipment engineers and CMrs, in order to determine the level of building equipment knowledge required, and to identify the perception level of CMrs about the building equipment in the construction project at the project design stage. The results of this study revealed that the CMrs surveyed had a lower level of knowledge on the building equipment than the level that was desired by the equipment engineers. This indicates that CMrs currently have a weak capacity for the management of building equipment. It is thus necessary for CMrs to undergo systematic training in order learn more about building equipment and thus be able to manage construction projects more efficiently.

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

Life Cycle Costing: Maintenance and Repair Costs of Hospital Facilities Using Monte Carlo Simulation

  • Kim, Tae-Hui;Choi, Jong-Soo;Park, Young Jun;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.541-548
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

Optimizing a Construction Schedule Considering Cash-flow (현금 흐름을 고려한 건설일정 최적화에 관한 연구)

  • Lee, Hyung-Guk;Lim, Tae-Kyung;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.303-305
    • /
    • 2012
  • This paper presents a system called a Cash-flow based Construction Scheduling Optimization (CfSO). The existing CPM is biased on schedule and cost management. For a profitable and successful project management, the cash-flow which occurred actually by contractual conditions should be considered in the project scheduling. Therefore, this study provides a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed methodology is implemented as a system prototype in Microsoft Excel. CfSO helps a site manager as a decision-maker to establish a optimized project scheduling and decide profitable contractual conditions against a construction owner.

  • PDF