• Title/Summary/Keyword: build

Search Result 9,075, Processing Time 0.034 seconds

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

Flow Range Extension of Light Oil Flowmeter Standard System with Build-Up Technique (Build-Up 기법을 이용한 경질유 표준장치의 측정범위 확장)

  • Lim, Ki-Won;Choi, Jong-Oh
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.30 no.12 s.255
    • /
    • pp.1139-1146
    • /
    • 2006
  • Light Oil Flow Standard System(LOFSS) in Korea Research Institute of Standards and Science(KRISS) was designed for oil flowmeter calibration. In order to extend the flow range from 120 $m^3/h$ to 200 $m^3/h$, the build-up technique was applied with two positive displacement flowmeters as master flowmeter. The master flowmeters were calibrated against with LOFSS, which has 0.04 % uncertainty of flow quantity determination, then the test flowmeter is calibrated against two master flowmeters. For uncertainty analysis, the repeatability of master flowmeters, the variation of the fluid density and the pipe volume due to temperature change were scrutinized. The contribution of each uncertainty factors to the calibrator and the correlation of each factors were discussed. For investigating the feasibility of uncertainty analysis, a turbine flowmeter as a transfer package was tested with LOFSS and two reference flowmeter. The hypothesis test for both results was coincide with a 95 % significant level. This means that the uncertainty analysis procedure of the calibrator is reasonable and the extension of flow range with master meters was carry out successfully.

Decomposition-based Process Planning far Layered Manufacturing of Functionally Gradient Materials (기능성 경사복합재의 적층조형을 위한 분해기반 공정계획)

  • Shin K.H.;Kim S.H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.3
    • /
    • pp.223-233
    • /
    • 2006
  • Layered manufacturing(LM) is emerging as a new technology that enables the fabrication of three dimensional heterogeneous objects such as Multi-materials and Functionally Gradient Materials (FGMs). Among various types of heterogeneous objects, more attention has recently paid on the fabrication of FGMs because of their potentials in engineering applications. The necessary steps for LM fabrication of FGMs include representation and process planning of material information inside an FGM. This paper introduces a new process planning algorithm that takes into account the processing of material information. The detailed tasks are discretization (i.e., decomposition-based approximation of volume fraction), orientation (build direction selection), and adaptive slicing of heterogeneous objects. In particular, this paper focuses on the discretization process that converts all of the material information inside an FGM into material features like geometric features. It is thus possible to choose an optimal build direction among various pre-selected ones by approximately estimating build time. This is because total build time depends on the complexity of features. This discretization process also allows adaptive slicing of heterogeneous objects to minimize surface finish and material composition error. In addition, tool path planning can be simplified into fill pattern generation. Specific examples are shown to illustrate the overall procedure.

Efficient Calculation of Trapped Volumes in Layered Manufacturing Process (적층 성형 과정에서 고립 체적의 효율적 계산)

  • 김진영;이건우;정융호
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.2
    • /
    • pp.154-161
    • /
    • 1998
  • Prototypes of a design are always needed for the purpose of visualization and evaluation in the aspect of manufacturability functionality, and aesthetic appearance. Since the prototyping process requires a significant amount of cost and time, various rapid prototyping processes are recently being introduced in the process. However, it is usually necessary for a part built up by a rapid prototyping system to be refined by a post-processing process, in which the stair steps on the surfaces, the support structures (if they exist), and the unprocessed material are eliminated. This post-processing is usually done manually and is a time-consuming task. Especially, eliminating the trapped volumes, the volume of the unprocessed material entrapped by the solidified portion, is sometimes impossible in some processes. This study provides a designer with a tool to detect the existence and to calculate the quantity of the trapped volumes at the given build-up direction, so that the proper build-up direction is chosen or the part is built by pieces to avoid the problems caused by the trapped volumes in advance. Since the proposed algorithm can efficiently calculate the amount of the trapped volumes at any build-up direction, it has the potential of such application as optimizing the build-up direction to minimize the trapped volumes.

  • PDF

Determining Optimal Build Orientation in Fused Deposition Modeling for Minimizing Post Machining by Using Genetic Algorithm. (FDM(Fused Deposition Modeling) part의 후가공 최소화를 위한 최적성형방향 결정)

  • 안대건;김호찬;양화준;이일엽;장태식;정해도;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.18-21
    • /
    • 2003
  • Fused Deposition Modeling (FDM) parts are made by piling up thin layers that cause the stair stepping effect at the surface of FDM parts. This effect brings about poor surface roughness of the part and requires additional post machining such as manual finishing that is detrimental to the part geometry and time consuming. Determining optimal build orientation for FDM parts can be one solution to minimize the post machining. However, by using the CAD model, calculating the optimal build orientation is impractical due to heavy computing process. In order to calculate the optimal build orientation with high speed. the surface roughness model based on measured data and interpolation is newly developed in this research. Also. the genetic algorithm (GA) is applied for acquiring reliable solution. Finally, It is verified from the test that the presented approach is very efficient for reducing the additional post machining process fer FDM parts.

  • PDF

A Study on the Leadership in Korean Management (한국경영에 있어서의 리더쉽에 관한 연구)

  • 김인호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.19-32
    • /
    • 1979
  • The title of research is a study on the leadership in Korean management. The purpose of research is that I build up the ideal management-leadership in future which is objective and suitable studying through the existing theory at all points, and analyzing the leadership in Korean management concentrated on situational factors. Moreover it contributes to the promotion of productivity, the contents of research 1. The importance of management-leadership. 2. The development in theory concentrated on a principle of leadership. 3. The development in behavioral scientific leadership, which adopts situational approach to its methodology. 4. The study on the leadership-style and the pursuit of the ideal management-leadership in accordance with behavioral analysis. 5. The build up of leadership in Korean management. The refore I learn the following facts through the study on the leadership in modern management. 1. Leadership consists of the relations among all interdependant variables composing of system. 2. The problem of the increase in the management-leadership effectiveness. 3. The pursuit oriented ideal management-leadership. 4. The build-up of leadership in Korean management. So far 1 have studied the theory of management-leadership at all points and the leadership in Korean management concentrated on situational factors. I learn that leadership is made of the relations among these in building the future management-leadership. Therefore I try to come to the conclusion by raising the following three problems. 1. The increase in leadership effectiveness. 2. Leadership-oriented. 3. The build-up of the leadership in Korean management.

  • PDF

A Technique for Reactor Water Chemistry to Reduce Radioactivity Build up (방사능 누적 저감을 위한 원자로 수질관리)

  • Lee, Yong-Woo;Kim, Hong-Tae
    • Journal of Radiation Protection and Research
    • /
    • v.14 no.2
    • /
    • pp.37-44
    • /
    • 1989
  • An improved water chemistry technique was studied to reduce radioactivity build-up in reactor coolant system. The technique is convering the current coordinated lithium-boron chemistry regime to the elevated lithium chemistry regime in order to maintain high pH. Correlations between reactor coolant pH and radioactivity build-up were analized by using pH data from domestic PWRs. Consequently, it was founded that high pH chemistry was moer effective for radioactivity build-up reduction than current chemistry regime. This fact had revealed that much portion of reactor coolant corrosion products were nickel ferrite rather than magnetite, and that pH value ranging 7.0-7.4 was appropriate for high-pH chemistry operation.

  • PDF

A Study on Improvement on Dimensional Accuracy of SLS parts using Taguchi Method (다구찌 방법을 이용한 SLS 조형품의 치수정밀도 향상에 관한 연구)

  • Hwang, Po-Jung;Yang, Hwa-Jun;Lee, Seok-Hee
    • Proceedings of the KSME Conference
    • /
    • 2000.04a
    • /
    • pp.860-865
    • /
    • 2000
  • This Paper Proposes the test pieces of X, Y and Z axes to compensate the shape distortion of Selective Laser Sintering(SLS) parts resulting from the phase change during the sintering process. In no case of the proposed compensation test pieces of X, Y axes the accurate rates of shrinkage can be measured with the reduction of curling which is obtained from adjustment of build orientation and the formula used to get scale factors are proposed with the shrinkage rates of them. The scale factors of X, Y and Z axes are generated by building up proposed compensation test pieces. The generated scale iactors are required to satisfy the dimensional accuracy even if there are changes of the build position and the size of SLS parts in the build chamber. For this reason, it is proposed that the build positions and the size be considered to be noise factors against the compensation test pieces and a method is also proposed that scale factors be selected to robustly maintain the dimensional accuracy of SLS parts under the actual operating conditions with the application of the Taguchi Method.

  • PDF