• Title/Summary/Keyword: bridge management

Search Result 737, Processing Time 0.032 seconds

Development of Bridge Life-Cycle Management System based on Information and Communication Technology (ICT 기반 교량 생애주기 관리시스템 개발)

  • Park, Kyung-Hoon;Sun, Jong-Wan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.13-20
    • /
    • 2016
  • The computerized management system for bridges is required due to the increased service life and number of bridges. This paper provides information and communication technology (ICT) - based bridge management system (BMS) to enable life cycle management through a comparative study with the development trend and function of domestic and foreign BMSs. BMS developed as an operation system combined an internet and mobile program, and was based on GIS technology and an object-based information management system. BMS supports the establishment of long-term strategies and short-term plans based on predicting the life-cycle performance profile and the necessary budget by object-based informatization for the whole life-cycle information of bridges. Useful knowledge information for supporting decision making was derived from the life-cycle management strategies establishment for approximately 6,000 existing bridges. BMS was developed to be applicable to all nationwide road bridges. In addition, it can be used practically to maintain the performance based on accurate maintenance result management, reducing cost by reasonable budget management, and enhancing the convenience and reliability of field data collection.

Bridge Resource Management Training Programs in Korea and Their Effectiveness

  • Hong, Seung Kweon;Kim, Hongtae
    • Journal of the Ergonomics Society of Korea
    • /
    • v.35 no.4
    • /
    • pp.237-245
    • /
    • 2016
  • Objective: This study aims to introduce the bridge resource management (BRM) training courses implemented in Korea and to analyze their effectiveness in several views. Background: BRM training will be a mandatory course for crew members of ships from 2017. At this stage, it is needed to check if the BRM training courses implemented until now was effective to the Korean maritime safety and to investigate if there are more effective training methods. Method: The effectiveness of BRM training intervention in Korea was compared with that of the other countries, using Kirkpatrick's (1976) training evaluation framework. Kim (2012)'s data on the BRM training effectiveness were re-analyzed in order to check if the effects of BRM training are dependent on the bridge work experience. Results: Many BRM training courses has been opened in Korea. However, the methods to assess BRM training effects used in Korea focused on the survey of subjective satisfaction level, not investigating trainees' attitude and behavior change. On the other hand, the effectiveness of BRM training was higher to the bridge officers with long work experience than with shorter work experience. Conclusion: The contents of BRM training should be changed to effectively apply to the context of the real-world exercise and be differentiated depending on the work experience. Research on the methods to measure the BRM training effectiveness is also more required. Application: The results of this study will aid to develop the BRM training courses for bridge officers of ships in the BRM training institutions.

Maintenance Effect Quantification Mode by Response Surface Method (Response Surface 방법에 의한 보수보강 정량화 모델)

  • Park Seung-Hyuc;Kim Sung-Hoon;Lim Jong-Kwon;Park Kyung-Hoon;Kong Jung-Sik
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.557-564
    • /
    • 2006
  • Life-cycle performance and maintaining cost predictions are required for the effective management for bridges. In Korea, the importance of management of bridges has been recognized over the past two decades, resulting in the development of databases and various bridge management support tools by both government and private sectors. However, none of these tools has truly included the expected features of the bridge management system (EMS) for the next generation such as the quantification of the effects of maintenance interventions on bridge condition and safety. In this paper, a novel quantification process to simulate the life-cycle performance of steel box bridges has been developed. The process is based on the Response Surface method. Various performance-related variables aloe investigated to identify a set of significant design variables to construct the response surfaces.

  • PDF

Development on Repair and Reinforcement Cost Model for Bridge Life-Cycle Maintenance Cost Analysis (교량 유지관리비용 분석을 위한 대표 보수보강 비용모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.128-134
    • /
    • 2016
  • Estimating the repair and reinforcement (R&R) costs for each bridge member is essential for managing the life cycle of a bridge using a bridge management system (BMS). Representative members of a bridge were defined in this study, and detailed and representative R&R methods for each one were drawn in order to develop a systematic maintenance cost model that is applicable to the BMS. The unit cost for each detailed R&R method was established using the standard of estimate and historical cost data, and a systematic procedure is presented using an integration program to enable easy renewal of the R&R unit cost. Also, the average unit cost of the representative R&R methods was calculated in the form of a weighted average by considering the unit cost and application frequency of each detained R&R method. The appropriateness of the drawn average unit cost was reviewed by comparing and verifying it with the previous historical unit cost. The suggested average R&R unit cost can be used to review the validity of the required budget or the appropriateness of the R&R performance cost in the stage to establish the bridge maintenance plan. The results of this study are expected to improve the reliability of maintenance cost information and the rationality of decision making.

Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data (BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발)

  • Lee, Changjun;Park, Wonyoung;Cha, Yongwoon;Jang, Young-Hoon;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.267-275
    • /
    • 2023
  • As aged infrastructures have been increased, the importance of accurate maintenance costs and proper budget allocation for infrastructure become prominent under limited resources. This study proposed a mapping algorithm between representative defects, repair methods, and the estimated maintenance costs for concrete bridges. In this regard, using BMS (Bridge Management System) data analysis, bridge repair methods were classified and matched with defects according to their locations, types, and sizes. In addition, the maintenance costs were estimated based on the amount of work-load and quantity per unit using CSPR (Cost Standard Production Rate). As a result, the level of accuracy was an average of 85.1 % compared with the actual bill of quantity for Seoul bridge maintenance. The accuracy of maintenance costs is expected to be enhanced by considering the various site conditions such as pier height, extra charge conditions, additional equipment, etc.

Evaluation of Deterioration on Steel Bridges Based on Bridge Condition Ratings

  • Park, Chan-Hee
    • Corrosion Science and Technology
    • /
    • v.3 no.4
    • /
    • pp.166-171
    • /
    • 2004
  • Recent developments in Bridge Management Systems (BMS) and in Life-Cycle Cost (LCC) of bridges, have raised the need for evaluation procedure of future condition (Deterioration) of a bridge. Predicting future deterioration is not an easy task due to limited past data to extrapolate from and also due to difficulty in measuring actual deterioration such as section loss of steel on an actual steel bridge. Also, increase in live load and reduction of resistance are random variables, thus a probabilistic approach should be adopted for determining the future deterioration. Due to difficulties in evaluation of future deterioration on steel bridges, accepting uncertainties within a reasonable error, a deterministic procedure using bridge condition rating can be a useful tool for projection of future condition of bridges to identify repair and maintenance needs. The object of this paper is to determine applicability of evaluating deterioration of steel bridge components based on Bridge condition ratings. Bridge condition ratings of bridge components show wide variation for bridges of same age and does not directly correlate well with the age of the bridge and/or deterioration of the bridge. High uncertainty can be reduced by breaking down the rating and by sensitivity analysis. From refined condition rating data, generalized deterioration profile of structures based on age can be derived. Examples are shown for sample bridges in USA. Approximately, 3,000 short to medium span steel bridges were listed in the inventory database. Results show wide variation of rating factors but by subdividing the Bridge condition ratings for various categories general deterioration profiles of steel bridges can be determined.

Running safety of high-speed train on deformed railway bridges with interlayer connection failure

  • Gou, Hongye;Liu, Chang;Xie, Rui;Bao, Yi;Zhao, Lixiang;Pu, Qianhui
    • Steel and Composite Structures
    • /
    • v.39 no.3
    • /
    • pp.261-274
    • /
    • 2021
  • In a railway bridge, the CRTS II slab ballastless track is subjected to interlayer connection failures, such as void under slab, mortar debonding, and fastener fracture. This study investigates the influences of interlayer connection failure on the safe operation of high-speed trains. First, a train-track-bridge coupled vibration model and a bridge-track deformation model are established to study the running safety of a train passing a deformed bridge with interlayer connection failure. For each type of the interlayer connection failure, the effects of the failure locations and ranges on the track irregularity are studied using the deformation model. Under additional bridge deformation, the effects of interlayer connection failure on the dynamic responses of the train are investigated by using the track irregularity as the excitation to the vibration model. Finally, parametric studies are conducted to determine the thresholds of additional bridge deformations considering interlayer connection failure. Results show that the interlayer connection failure significantly affects the running safety of high-speed train and must be considered in determining the safety thresholds of additional bridge deformation in the asset management of high-speed railway bridges.

Study On Customer Satisfaction of Dental Prosthetic Tooth Surgery by Human Bridge (휴먼브릿지 치아보철 시술결과에 대한 고객만족도 분석)

  • Kim, Kyung-Jin;Cho, Duk-Young
    • The Korean Journal of Health Service Management
    • /
    • v.4 no.1
    • /
    • pp.11-22
    • /
    • 2010
  • The purpose of this study is to approving the usefulness on Customer Satisfaction of Human Bridge. To achieve this purpose, we conduct a survey of 385 Customer to have a new operation analysis that so-called Human Bridge. The results of this study as follow. First of all, It's appeared that dependence on mass communication has a high level Because that Some 66% of the people surveyed say that they have Human Bridge operation by mass communication. Secondly, In case of satisfaction level connected with operation, some 66% of the respondents say that it is inconvenient or not at all in the Human Bridge operation and some 81% of the respondents say that it is very healthy or the same in the gum condition. On the other hand, Some 64% of the people surveyed say that it is inconvenient or extra comfortable in the masticate their's food well. Thirdly, In case of the level of teeth shaking, Some 90% of the people surveyed say that it is no change or small to contrast beginning, and in aesthetic satisfaction after operation, a surprising 93% of the people surveyed say that it is satisfaction.

Numerical Analysis of Accumulated Sliding Distance of Pre-Stressed Concrete (PSC) Bridge Bearing for High-Speed Railway for Ubiquitous Technology (유비쿼터스 기술을 위한 고속철도상 Pre-Stressed Concrete(PSC) 교량받침의 누적수평이동거리에 관한 수치해석)

  • Oh, Soontaek;Lee, Dongjun;Lee, Hongjoo;Jeong, Shinhyo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.11 no.1
    • /
    • pp.9-18
    • /
    • 2015
  • Numerical analysis of PSC box bridge bearings for high speed KTX train vehicles has been carried out as a virtual simulation for Ubiquitous Technology. Improved numerical models of bridge, vehicle and interaction between bridge and train are considered, where bending and torsional modes are provided, whereas the exist UIC code is applied by the simplified HL loading. Dynamic and static analysed results are compared to get Dynamic Amplification Factors (D. A. F.) for maximum deflections and bending stresses up to running speed of 500 km/h. Equation from the regression analysis for the D. A. F. is presented. Sliding distance of the bearings for various KTX running speeds is compared with maximum and accumulated distances by the dynamic behaviors of PSC box bridge. Dynamic and static simulated sliding distances of the bearings according to the KTX running speed are proved as a major parameter in spite of the specifications of AASHTO and EN1337-2 focused on the distance by temperature variations.

Evaluation of Cable Tension Forces Using Vibration Method for a Cable-stayed Bridge under Construction (진동법을 이용한 사장교의 시공 중 장력 평가)

  • Cho, Soojin;Yun, Chung-Bang;Sim, Sung-Han
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.38-44
    • /
    • 2014
  • When a cable-stayed bridge is under construction, the cable tension that changes according to the construction phase is the index indicating the proper construction management. In this study, the vibration method using the least-square estimation has been implemented to monitor changing tensions of two multi-strand cables of a cable-stayed bridge under construction. The test bridge is Hwamyung Bridge in Korea with a prestressed concrete box girder. The field tests are executed during the second tensioning stage just after the installation of the key segment. The tensions of two cables are measured before and after the tensioning and 5 days later (i.e., after finishing the tensioning of all cables). The accuracy of the estimated tensions by the vibration method has been improved by employing proper effective lengths of the cables. The measured tensions are compared with the result of the lift-off tests and design tensions. The vibration method shows very good performance in monitoring the changing tensions according to the construction phase with minimal error.