• Title/Summary/Keyword: bridge girder

Search Result 1,292, Processing Time 0.028 seconds

A Study on Dynamic Behaviors of Steel Plate Girder bridge with Applying External Post-Tensioning Method (외부 후긴장 공법 적용에 따른 무도상 판형교의 동적거동 분석)

  • Choi, Dong-Ho;Choi, Jung-Youl;Choi, Jun-Hyeok;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.160-168
    • /
    • 2006
  • The major objective of this study is to investigate the effects and application of external post-tensioning method far steel plate girder bridge. It analyzed the mechanical behaviors of steel plate girder bridge with applying external post-tensioning on the finite element analysis, field test and laboratory test fur the lateral dynamic characteristics. As a result, the reinforcement of steel plate girder bridge the external post-tensioning method are obviously effective for the lateral dynamic response which is non-reinforced. The analytical and experimental study are carried out to investigate the post-tension force decrease lateral acceleration and deflection on steel plate girder bridge for serviceability. And the external post-tensioning method reduce dynamic maximum displacement(about $10{\sim}24%$), the increase of dynamic safety is predicted by adopting external post-tensioning method. From the dynamic test results of the servicing steel plate girder bridge, it is investigated that the change degree of natural frequency is very low with applying the external post-tensioning method The servicing steel plate girder bridge with external post-tensioning has need of the reasonable reinforcement measures which could be reducing the effect of lateral dynamic behavior that degradation phenomenon of structure by an unusual response characteristic and a drop durability.

Application of topology optimization to bridge girder design

  • Kutylowski, Ryszard;Rasiak, Bartosz
    • Structural Engineering and Mechanics
    • /
    • v.51 no.1
    • /
    • pp.39-66
    • /
    • 2014
  • This study deals with the design of bridge girder structures and consists of two parts. In the first part an optimal bridge girder topology is determined using a software based on structure compliance minimization with constraints imposed on the body mass, developed by the authors. In the second part, an original way in which the topology is mapped into a bridge girder structure is shown. Additionally, a method of converting the thickness of the bars obtained using the topology optimization procedure into cross sections is introduced. Moreover, stresses and material consumption for a girder design obtained through topology optimization and a typical truss girder are compared. Concluding, this paper shows that topology optimization is a good tool for obtaining optimal bridge girder designs.

Train-induced dynamic behavior analysis of longitudinal girder in cable-stayed bridge

  • Yang, Dong-Hui;Yi, Ting-Hua;Li, Hong-Nan;Liu, Hua;Liu, Tiejun
    • Smart Structures and Systems
    • /
    • v.21 no.5
    • /
    • pp.549-559
    • /
    • 2018
  • The dynamic behaviors of the bridge structures have great effects on the comfortability and safety of running high-speed trains, which can also reflect the structural degradation. This paper aims to reveal the characteristics of the dynamic behaviors induced by train loadings for a combined highway and railway bridge. Monitoring-based analysis of the acceleration and dynamic displacement of the bridge girder is carried out. The effects of train loadings on the vertical acceleration of the bridge girder are analyzed; the spatial variability of the train-induced lateral girder displacement is studied; and statistical analysis has been performed for the daily extreme values of the train-induced girder deflections. It is revealed that there are great time and spatial variabilities for the acceleration induced by train loadings for the combined highway and railway cable-stayed bridge. The daily extreme values of the train-induced girder deflections can be well fitted by the general extreme value distribution.

Rating of A Plate Girder Bridge through Load Test (강거더교의 재하시험을 통한 내하력평가)

  • Juhn, Gui Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.1
    • /
    • pp.89-97
    • /
    • 1998
  • This paper presents the results of the load test performed on a steel plate girder bridge and suggests the procedure of bridge rating through the load test. In general the girder bridge resist the loads as a complex three-dimensional structural system. Therefore the test results are analyzed for the longitudinal and the transverse response characteristics. The bending moments based on the beam analysis are compared with the measured values for longitudinal response characteristics. The lateral load distribution characteristics are assessed based on the load test results for transverse response characteristics. Also the rating of the test bridge is performed by using the suggested rating procedure which considers the actual response characteristics of the bridge. The suggested procedure can be used for understanding of actual response characteristics and evaluating load carrying capacity of the steel plate girder bridge.

  • PDF

Experimental and numerical study on shear studs connecting steel girder and precast concrete deck

  • Xia, Ye;Chen, Limu;Ma, Haiying;Su, Dan
    • Structural Engineering and Mechanics
    • /
    • v.71 no.4
    • /
    • pp.433-444
    • /
    • 2019
  • Shear studs are often used to connect steel girders and concrete deck to form a composite bridge system. The application of precast concrete deck to steel-concrete composite bridges can improve the strength of decks and reduce the shrinkage and creep effect on the long-term behavior of structures. How to ensure the connection between steel girders and concrete deck directly influences the composite behavior between steel girder and precast concrete deck as well as the behavior of the structure system. Compared with traditional multi-I girder systems, a twin-I girder composite bridge system is more simplified but may lead to additional requirements on the shear studs connecting steel girders and decks due to the larger girder spacing. Up to date, only very limited quantity of researches has been conducted regarding the behavior of shear studs on twin-I girder bridge systems. One convenient way for steel composite bridge system is to cast concrete deck in place with shear studs uniformly-distributed along the span direction. For steel composite bridge system using precast concrete deck, voids are included in the precast concrete deck segments, and they are casted with cast-in-place concrete after the concrete segments are erected. In this paper, several sets of push-out tests are conducted, which are used to investigate the heavier of shear studs within the voids in the precast concrete deck. The test data are analyzed and compared with those from finite element models. A simplified shear stud model is proposed using a beam element instead of solid elements. It is used in the finite element model analyses of the twin-I girder composite bridge system to relieve the computational efforts of the shear studs. Additionally, a parametric study is developed to find the effects of void size, void spacing, and shear stud diameter and spacing. Finally, the recommendations are given for the design of precast deck using void for twin I-girder bridge systems.

A Study on the Applicability of Railway Bridge Using Steel-Confined Prestressed Concrete Girder (강재로 구속된 프리스트레스트 콘크리트 거더를 이용한 철도교의 적용성 고찰)

  • Kim Jung-Ho;Hwang Yoon-Gook;Park Kyung-Hoon;Choi Il-Yoon;Lee Sang-Yoon
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1007-1013
    • /
    • 2004
  • A new type of girder named as Steel-Confined Prestressed Concrete Girder(SCP Girder) has been developed, which is composed of concrete, steel plate, and prestressing tendon. This girder may maximize structural advantages of these components, therefore it can be used to construct the middle or long span bridge with low-height girder. To verify the propriety of design, structural safety, and applicability of this girder, static load test was carried out. In this study, a design program was developed for practical design of railway bridge using SCP girder. And to verify the applicability of SCP girder to railway bridge, structural performance and economic efficiency based on the construction cost were compared with conventional railway bridges.

  • PDF

Live Load Distribution of Prestressed Concrete Girder Bridge with Curved Slab

  • Park Sun-Kyu;Kim Kwang-Soo;Kim Jin-Ho;Choi Jung-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.5 s.83
    • /
    • pp.709-717
    • /
    • 2004
  • The existing AASHTO Standard Specification have some inadequacies in expressing wheel load distribution of bridge which has specific shape of curved bridge instead of straight bridge. Thus, this research presented the finite element analysis and modelling technique of prestressed concrete girder bridge having curved slab and the expression of wheel load distribution was suggested as the ratio of bending moment utilizing the result of finite element analysis of prestressed concrete girder bridge having cowed slab. The considered parameter of girder distribution expression is the curvature of slab, span length, girder space, cross beam space and number of lanes. Though the suggested girder distribution expression is generally underestimated below AASHTO Standard Specification, once the curvature of slab increases, the suggested expression gets larger than AASHTO LRFD Standard Specification.

Design & Construction of PSC Box-Girder Bridge with Central Suspension by Extradosed Cables and Constant Girder Depth (중앙일면식 케이블과 등형고를 갖는 Extradosed PSC 교량의 설계 및 시공)

  • 조의경;김성일;박종화;이수열
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.618-625
    • /
    • 2003
  • The recent development of PSC girder bridges are mostly dedicated for optimization of self-weight, simplification of girder section for easy construction and minimization of maintenance efforts. Moreover some of those bridges are required as a landmark facility which raises the image of locality and harmony with surroundings. An extradosed bridge is one of the best alternates which not only covers the longer span than PSC box girder and also performs the role of landmark facility with much cheaper cost than cable stayed bridge. Hyundai is carrying out the construction of unique style extradosed bridge which have central suspension system and uniform girder depth named Keong-An grand bridge on the Sungnam-Janghowon Express highway. In this paper, major process of design and construction features of Keong-An bridge is presented.

  • PDF

Optimum Evaluation of PS Concrete Deck and High Strength Two Plate Girder System (PS 콘크리트 바닥판 및 고강도 2주형 거더 시스템의 최적설계평가)

  • 박태훈;박문호;조창근;권민호;남유석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2003.04a
    • /
    • pp.185-192
    • /
    • 2003
  • This study presents the Optimum Evaluation of PS Concrete Deck and High Strength Two Plate Girder System. Recently, for the simplification of structure and the long length of bridge, a small number girder bridge which minimized a number of girder by two is much designed and constructed. For the structural analysis, a finite element formulation considering with even the matter of torsion in the three-dimensional problem is presented. And connectively, for the design of optimum section, an algorithm of optimum design is developed. The section of a small number girder bridge which constituted of two girders and PS Concrete Deck is optimized by using optimum program developed in this study. and two girders bridge refered in this study is proved a efficiency and a economy by being compared and checked to the general plate girder bridge with five girder and Reinforced Concrete Deck.

  • PDF

Development and Experimental Performance Evaluation of Steel Composite Girder by Turn Over Process (단면회전방법을 적용한 강합성 소수주거더 개발 및 실험적 성능 평가)

  • Kim, Sung Jae;Yi, Na Hyun;Kim, Sung Bae;Kim, Jang-Ho Jay
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5A
    • /
    • pp.407-415
    • /
    • 2010
  • In Korea, more than 90% of the total number of steel bridges built for 40~70 m span length is a steel box-girder bridge type. A steel box-girder bridge is suitable for long span or curved bridges with outstanding flexural and torsional rigidity as well as good constructability and safety. However, a steel box-girder bridge is uneconomical, requiring many secondary members and workmanship such as stiffeners and ribs requiring welding attachments to flanges or webs. Therefore, in US and Japan, a plate girder bridge, which is relatively cheap and easy to construct is generally used. One type of the plate girder bridge is the two- or three-main girder plate bridge, which is a composite plate girder bridge that minimizes the number of required main girders by increasing the distance between the adjacent girders. Also, for the simplification of girder section, the stiffener which requires attachment to the web is not required. The two-main steel girder plate bridge is a representative type of plate girder bridges, which is suitable for bridges with 10 m effective width and has been developed in the early 1960s in France. To ensure greater safety of two- or three-main girder plate bridges, a larger steel section is used in the bridge domestically than in Europe or Japan. Also, the total number of two- or three-main girder plate bridge constructed in Korea is significantly less than the steel box girder bridge due to a lack of designers' familiarity with more complex design detailing of the bridge compare to that of a steel box girder bridge design. In this study, a new construction method called Turn Over method is proposed to minimize the steel section size used in a two- or three-main girder plate bridge by applying prestressing force to the member using confining concrete section's weight to reduce construction cost. Also, a full scale 20 m Turn Over girder specimen and a Turn Over girder bridge specimen were tested to evaluate constructability and structural safety of the members constructed using Turn Over process.