• Title/Summary/Keyword: bridge design

Search Result 3,098, Processing Time 0.037 seconds

Design Consideration of Half-Bridge LLC Resonant Converter

  • Choi, Hang-Seok
    • Journal of Power Electronics
    • /
    • v.7 no.1
    • /
    • pp.13-20
    • /
    • 2007
  • LLC resonant converters display many advantages over the conventional LC series resonant converter such as narrow frequency variation over wide range of load and input variation and zero voltage switching even under no load conditions. This paper presents analysis and design consideration for the half bridge LLC resonant converter. Using the fundamental approximation, the gain equation is obtained, where the leakage inductance in the transformer secondary side is also considered. Based on the gain equation, the practical design procedure is investigated to optimize the resonant network for a given input/output specifications. The design procedure is verified through an experimental prototype of the 115W half-bridge LLC resonant converter.

A Study on the Axis Line of Short Span Filled Spandrel Arch Bridge (단경간 폐복식 아치교의 축선에 관한 연구)

  • 구민세;황윤국;조현준
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1990.10a
    • /
    • pp.95-100
    • /
    • 1990
  • The behavior of short span filled spandrel arch bridge of 10 and 21 m span with various axis line, rise and backill height were investigated under the design loads(self weight, earth pressure, temperature load, live load, etc). Even though the behaviors of arch were known as relatively complicated, the followings can be concluded within the limits of this study. The design value of arch bridge increase as the rise decreases, the effects of temperature load become dominant for the design of arch bridge, and governing design factors are occured at springing.

  • PDF

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

Design and Construction Method Considering Turnout for High-speed on The Bridge with Concrete Track (콘크리트궤도에 고속분기기 설치를 고려한 교량설계 및 시공기법)

  • Kim, In-Jae;Oh, Sei-Young;Joo, Hwan-Joong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.71-79
    • /
    • 2008
  • The concrete track is being used at the Phase II of the Kyeongbu High Speed Railway and New Constructed Honam High Speed Railway. When it makes a decision of bridge type, It has to consider about longitudinal forces of Continuous Welded Rail, Displacement at the end of bridges, Up-lift forces for fastener on the track. If it is installed turnout on the bridge, There is likelihood of the deck twist by applying the each difference longitudinal forces at the 4 each rails and the buckling by concentration of rail stress at the turnout. Moreover, If it is installed turnout on the continuous bridge and REJ(Rail Expansion Joint) on the main track or turnout track. It is hard to keep a safety for rail because of coming to twist or folding at the expansion of deck on the turnout track. Therefore when it is a design of bridge with turnout. It need to take bridge type to minimize an additional axial force and a displacement at the turnout. This paper makes a study of the composite steel arch bridge that is able to resolve criteria requirements of safety for track with turnout and suggest a helpful design method for bridge considering track with turnout by being based on design and construction method of Eonyang Bridge at the north part of Ulsan Station in Phase II of the Kyeongbu High Speed Railway.

  • PDF

Improvement of the Performance Based Seismic Design Method of Cable Supported Bridges with Resilient-Friction Base Isolation Systems (II-Proposal for the Seismic Design Procedure) (마찰복원형 지진격리장치가 설치된 케이블교량의 성능 기반 내진설계법 개선(II-내진설계 절차 제안))

  • Gil, Heungbae;Park, Sun Kyu;Han, Kyoung Bong;Yoon, Wan Seok
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.24 no.4
    • /
    • pp.169-178
    • /
    • 2020
  • In a previous paper, ambient vibration tests were conducted on a cable stayed bridge with resilient-friction base isolation systems (R-FBI) to extract the dynamic characteristics of the bridge and compare the results with a seismic analysis model. In this paper, a nonlinear seismic analysis model was established for analysis of the bridge to compare the difference in seismic responses between nonlinear time history analysis and multi-mode spectral analysis methods in the seismic design phase of cable supported bridges. Through these studies, it was confirmed that the seismic design procedures of the "Korean Highway Bridge Design Code (Limit State Design) for Cable Supported Bridges" is not suitable for cable supported bridges installed with R-FBI. Therefore, to reflect the actual dynamic characteristics of the R-FBI installed on cable-supported bridges, an improved seismic design procedure is proposed that applies the seismic analysis method differently depending on the seismic isolation effect of the R-FBI for each seismic performance level.

An Experimental Study for Estimation of Effective Temperature for Design in Steel Box Girder Bridge (강박스거더교의 설계 유효온도 산정을 위한 실험적 연구)

  • Lee, Seong Haeng;Shin, Hyo Kyoung;Kim, Kyoung Nam;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.6
    • /
    • pp.449-458
    • /
    • 2016
  • The temperature data were measured for two years in a bridge specimen and the bridge in service nearby in order to calculate the effective temperature for thermal loads in steel box girder bridge. The maximum and minimum effective temperatures were calculated in the bridge specimen and the bridge according to air temperature in 2014, 2015 and 2years. The effective temperatures calculated in this study were compared the Euro code and the Highway Bridge Design Criteria. The coefficients of determination in the maximum effective temperature and the Euro code for 2 year were calculated from R = 0.927, R = 0.894 in a bridge specimen and the bridge respectively. Those of minimum temperature and the Euro code were analyzed from R = 0.992, R = 0.813 in two bridge respectively. Also, the results were evaluated as being very similar, or slightly increased as compared with the maximum temperature of the Korean Highway Bridge Design Code(Limit State Design).

Bridge Park International Design Competition and Its Implications on Contemporary Landscape Design (브리지 파크 국제설계경기에 나타난 현대 조경설계의 경향)

  • Kim Ah-Yeon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.5 s.112
    • /
    • pp.15-30
    • /
    • 2005
  • A deserted town once vibrant with active commercial activities around a railroad station now tries to find a way to escape from depression and revive its life with a renewed civic pride. An open space adjacent to the Main Street, the commercial district of Buzzards Bay, Massachusetts, is waiting to be transformed and reconfigured to be a new ecological park to boost the economy of the community. Bridge Park is 26-acre land abutting the Cape Cod Canal with a railroad bridge as a backdrop. The existing condition of the site with a small salt marsh, woodland, lawn, and the vestige of old railroad easement along with the proximity to the commercial district poses an interesting question of how to make a medium scaled ecological park within an urban context. This paper examines the winning design proposals for the Bridge Park submitted to the International Design Competition held in April, 2005. Six winning proposals were introduced and discussed in terms of categories related to the trend of contemporary landscape design such as; 1) ecological ordinariness and geometric figures, 2) topography and spatial imagination, 3) minimal programs and open put 4) time and process oriented design, 5) park and economic effects and 6) diagrammatic plan and photo montage. Bridge Park Design Competition confirms the complex characteristics representing the contemporary landscape design overcoming the dichotomy between nature and culture and the 'pastoral ecological design' and 'landscape as an art'. The Park becomes the activating agent for the community rejecting the conventional and passive role as a romantic picturesque landscape. Bridge Park International Design Competition is a meaningful event to test the idea of new ecological urban park, and to fine-tune the trend of the contemporary urban park design.

Response Modification Factors and No Collapse Design of Typical Bridges (응답수정계수와 일반교량의 붕괴방지설계)

  • Kook, Seung-Kyu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.2
    • /
    • pp.185-189
    • /
    • 2017
  • The purpose of earthquake resistant design for typical bridges is the 'No Collapse Design' allowing emergency vehicles just after earthquakes. The Roadway Bridge Design Code provides design provisions to carry out such 'No Collapse Design' with a ductile mechanism and response modification factors given for connections and substructure play key role in this procedure. In case of response modification factors for substructure, the Roadway Bridge Design Code provides values considering ductility and redundancy. On the other hand, 'AASHTO LRFD Bridge Design Specifications' provides values considering additionally an artificial factor according to the bridge importance categories divided into critical, essential and others. In this study, a typical bridge with steel bearing connections and reinforced concrete piers is selected and different response modification factors for substructure are applied with design conditions given in the Roadway Bridge Design Code. Based on the comparison study of the design results, supplementary measures are suggested required by applying different response modification factors for substructure.

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

Mechanical performance and design optimization of rib-stiffened super-wide bridge deck with twin box girders in concrete

  • Wen, Xiong;Ye, Jianshu;Gai, Xuemei;Cai, C.S.
    • Structural Engineering and Mechanics
    • /
    • v.48 no.3
    • /
    • pp.395-414
    • /
    • 2013
  • The present study fundamentally investigated the mechanical performance of the rib-stiffened super-wide bridge deck with twin box girders in concrete, which is a very popular application to efficiently widen the bridges with normal span. The shear lag effects of the specific cross-sections were firstly studied. The spatial stress distribution and local stiffness of the bridge deck with twin box girders were then investigated under several typical wheel load conditions. Meanwhile, a comparative study for the bridge deck with and without stiffening ribs was also carried out during the investigation; thereby, a design optimization for the stiffening ribs was further suggested. Finally, aiming at the preliminary design, an approximate methodology to manually calculate the bending moments of the rib-stiffened bridge deck was analytically proposed for engineers to quickly assess its performance. This rib-stiffened bridge deck with twin box girders can be widely applied for concrete (especially concrete cable-stayed) bridges with normal span, however, requiring a super-wide bridge width due to the traffic flow.